Inspection Status: Approved
Inspection History: STEM WALL/RETAINING WALL
Permit Number - T17CM00004
Inspection Description - STEM WALL/RETAINING WALL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2019 | STEM WALL/RETAINING WALL | Approved | ||
11/06/2018 | STEM WALL/RETAINING WALL | Partial Approval | curb walls and CMU starter walls on level 12 OK to pour. | |
10/30/2018 | STEM WALL/RETAINING WALL | Partial Approval | All low walls and roof OK to form and pour. | |
10/25/2018 | STEM WALL/RETAINING WALL | Partial Approval | On roof, all planter walls on south half ok to form and pour. | |
10/24/2018 | STEM WALL/RETAINING WALL | Partial Approval | Topping north of pool and East planter walls ok to pour | |
10/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | Level 1 retail elevator ok to 48 East ramp wall from 4 /D1 to D6 pk to 48 |
|
10/22/2018 | STEM WALL/RETAINING WALL | Partial Approval | Level 14, South; exterior planter wall at 48" (South, SE, SW): Stairwell # B, ok to form | |
10/15/2018 | STEM WALL/RETAINING WALL | Partial Approval | South elevator shaft on roof okay to pour | |
10/12/2018 | STEM WALL/RETAINING WALL | Partial Approval | NORTH ELEVATOR SHAFT ON ROOF OK TO POUR. | |
10/11/2018 | STEM WALL/RETAINING WALL | Cancelled | This inspection was canceled by the contractor. | |
10/04/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
09/28/2018 | STEM WALL/RETAINING WALL | Partial Approval | SOUTH HALF OF ROOF DECK AND POOL WALLS OK TO POUR | |
09/26/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
09/25/2018 | STEM WALL/RETAINING WALL | Partial Approval | POOL WALLS OK TO FORM SECOND SIDE. | |
09/24/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10M UNITS 3 AND 4 - ALL 6 COLUMNS READY TO POUR | |
09/21/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | NOT READY ENOUGH TO INSPECT | |
09/21/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
09/20/2018 | STEM WALL/RETAINING WALL | Partial Approval | level 10 M units 3 & 4 floors ok to pour | |
09/19/2018 | STEM WALL/RETAINING WALL | Partial Approval | level 10 Gridline 3.9 at E4 and sheer wall 2, level 10 mezzanine Gridline A at 5.5 and 6.9 and Gridline B at 5.8 all OK to pour | |
09/18/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS LEVEL 10 M - F8/7&7.9; D8/7&7.9; A7/7.4 AND SHEARWALL 1 OK TO POUR. LEVEL 10 SHEARWALL 3 OK TO POUR. |
|
09/17/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 COLUMNS 3/D & D.6 OK TP POUR | |
09/14/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10M UNIT 17 ALL COLUMNS OK TO POUR. SOUTH ELEVATOR CORE WALLS OK TO POUR TO BOTTOM ELEVATION OF RAMP. |
|
09/13/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 COLUMN 2/C1 AND LEVEL 10 M COLUMNS J3/7.6 AND L/7.3. ALSO SHEARWALL 13 ON 10 M OK TO POUR. | |
09/12/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 COLUMNS E6/2 & 3.1; D8/2.1; 4/B & D; 4.5/E5 AND SHEARWALL 1 AND NORTH 1/2 OF ELEVATOR CORE ALL OK TO POUR | |
09/11/2018 | STEM WALL/RETAINING WALL | Partial Approval | ELEVATOR CORE SOUTH FROM 10 TO 10.5 OK TO POUR | |
09/11/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS LEVEL 10 M GRIDLINE G/2,3.1; A/2,3; K9/2 OK TO POUR | |
09/11/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS LEVEL 10 M 3/L, H/2, 3/B OK TO POUR | |
09/10/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 COLUMNS 5.8/B & D3; 5.2/B; 5.5/A OK TO POUR SOUTH SIDE OF ELEVATOR CORE NOT APPROVED (REBAR CLEARANCE NOT ADEQUATE) |
|
09/07/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 COLUMNS G8/5, 5.5; E8/4.5, 5, 7; D8/7.8, 7.4/A7, 6.9/A AND SHEARWALL 12 OK TO POUR | |
09/06/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 COLUMNS 2/H,G.4/5 (10 TO 11) F8/7.9 (10 TO 10.5) AND SHEARWALLS 10 & 11 (10 TO 11) OK TO POUR | |
09/05/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
09/04/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 SOUTH COLUMNS J4/2, J/4, F8/5.5&7, F7/4.5&5, G2/4.5 ALL OK TO POUR | |
08/31/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 COLUMNS GRID LINE 4.1/L, 3.1/J OK TO POUR | |
08/30/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 10 SHEARWALL 13 AND COLUMNS G/2,3.1; L/2,3,4.7,5.7,7.3 AND GL 7.6/5.3 OK TO POUR | |
08/29/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
08/28/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
08/24/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS LEVEL 9M TO 10 GRID LINE 2/A,D.8,E.6 AND 2.9/A,B,E.6 ALL OK TO POUR. | |
08/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9M WEST COLUMNS F.8/7,8 & D.8/7,8 OK TO POUR CORE ELEVATOR SHAFT SOUTH OK TO POUR |
|
08/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9M SHEARWALL 1 AND COLUMNS A/5.5 & 6.9; A.7 / 7.4 & B/5.8 ALL OK TO POUR. | |
08/21/2018 | STEM WALL/RETAINING WALL | Partial Approval | COL 5/E8 LEVEL 9 OK TO POUR | |
08/17/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9 NORTH CORE OK 9M TO 10 OK TO POUR | |
08/16/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9M COLUMNS L/4.7,5.7,7.3 & J.3/7.6 OK TO POUR | |
08/15/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9 COLUMNS 4/B & D1, 2/C1 & 3/D6; SHEARWALL 3 ALL OK TO POUR. | |
08/15/2018 | STEM WALL/RETAINING WALL | Partial Approval | 9M COLUMNS E4/4 & D1/3, G/2 & 3.1 AND LEVEL 9 ELEVATOR CORE SOUTH OK TO POUR | |
08/13/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9 NORTHWEST QUADRANT SW2 AND NORTH 1/2 OF ELEVATOR CORE, COLUMNS 7/E.7, 6.9/A AND 5.2/B OK TO POUR. | |
08/10/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9 SHEARWALLS 1 AND 10; 13 COLUMNS ON GL A TO E.8/2 TO 8 LEVEL 9 TO 9M AND 2 COLUMNS LEVEL 9 T0 10 4.5/E.5 & 5.8/D.3 OK TO POUR. | |
08/09/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9.5 COLUMN 4.1/L OK TO POUR. SHEARWALL 10 REINFORCING WAS PLACED WRONG (NOT APPROVED TO POUR) | |
08/08/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9 COLUMNS 5/G.4 AND 5.4/F.8 OK TO POUR | |
08/07/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 9 COLUMNS 5 / G.4 AND G.8, 3.9 / J OK TO POUR | |
08/06/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #9; SHEAR WALL #12 EAST AND WEST. COLUMNS AT GL: 2/H-J.4, 3.1/J. OK TO PLACE CONCRETE. | |
08/03/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #9 (SOUTH), 13 COLUMNS AT GL: L/3 - 7.3, F.7 - G/2 - 7, SHEAR WALLS # 11 AND #13. OK TO PLACE CONCRETE. | |
08/01/2018 | STEM WALL/RETAINING WALL | Cancelled | TO BE RESCHEDULED FOR 2 AUGUST 2018 | |
07/30/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #8, NORTH, 24 COLUMNS AT GL: 2-8/A-3E.7: SHEARWALLS #1 - 9. OK TO PLACE CONCRETE. | |
07/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | LLEVEL #8, COLUMNS (9), AT GL: 4.5-7.9/F.7-L. SHEARWALL #10, OK TO PLACE CONCRETE. | |
07/20/2018 | STEM WALL/RETAINING WALL | Partial Approval | 13 COLUMNS ON LEVEL #8, GL: G-M/2-5.7; SHEAR WALLS #11, 12, 13. OK TO PLACE CONCRETE. | |
07/18/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS (10) AT LEVEL #7, GL: A-E.6/2 - 3.9; SHEAR WALLS #1 THROUGH #9. OK TO PLACE CONCRETE. | |
07/17/2018 | STEM WALL/RETAINING WALL | Partial Approval | 14 COLUMNS AT LEVEL #7, GL: A - E/4 - 8. OK TO PLACE CONCRETE. | |
07/12/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #7, COLUMNS (4) AT GL: 1-3.1/G-L: SHEAR WALLS #10 AND #11. | |
07/11/2018 | STEM WALL/RETAINING WALL | Partial Approval | STEM WALLS - NORTH AND WEST ON LEVEL #3. LEVEL #7: COLUMNS (5) AT GL: 4.1/K; 9/K; J/3.1; J/3.9; J/4; OK TO PLACE CONCRETE. | |
07/10/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS (13) LEVEL #1, GL: 4.5 - 8/F.7 - L; SHEAR WALLS (3) #12, 13 - OK TO PLACE CONCRETE. | |
07/09/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
07/06/2018 | STEM WALL/RETAINING WALL | Partial Approval | STEM WALLS ON LEVEL #2, NORTH EAST CORNER, SOUTH COURTYARD, WOUTH WALL (2). OK TO PLACE CONCRETE. | |
07/05/2018 | STEM WALL/RETAINING WALL | Partial Approval | NORTH COURTYARD STEM WALL; CENTRAL COURTYARD NEAR SHEAR WALL #3; AT 17". OK TO PLACE CONCRETE. | |
07/03/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #6, COLUMNS (12) AT GL: A-E/2-4; SHEAR WALL #3. OK TO PLACE CONCRETE. | |
07/02/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #6, COLUMNS (NORTH AT GL: 4.5-8/A-F.7) (12). SHEAR WALLS #1, 2, 4 - 9. OK TO PLACE CONCRETE. | |
06/29/2018 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
06/29/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #1, STEPS AT GL: 5/F-F.7; GENERATOR ROOM WALL (SOUTH WEST), OK TO PLACE CONCRETE. | |
06/28/2018 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* LEVEL 6 COLUMNS IN SOUTHWEST QUADRANT (11) OK TO POUR. SHEARWALLS 10, AND 11 OK TO POUR. | |
06/27/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 6 SOUTH WEST 13 COLUMNS AND SHEARWALLS 12 AND 13 OK TO POUR | |
06/25/2018 | STEM WALL/RETAINING WALL | Partial Approval | LOW WALLS AT NORTHEAST CORNER OK TO POUR, TOPPING SLAB LEVEL 1 SOUTHWEST CORNER OK TO POUR. | |
06/22/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
06/21/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 5 COLUMNS NORTHEASE QUADRANT AND SHEARWALLS 2 AND 3 OK TO POUR. | |
06/20/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 5 CORE, SHEARWALL 1, AND 13 COLUMNS IN NORTHWEST QUADRANT ARE OK TO POUR. | |
06/19/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 1 LOW WALLS AROUND COURTYARD OK TO POUR | |
06/18/2018 | STEM WALL/RETAINING WALL | Cancelled | IMCOMPLETE WORK. CONTRACTOR CANCELLED | |
06/15/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #5, SOUTH: SHEAR WALL #10. OK TO PLACE CONCRETE. | |
06/14/2018 | STEM WALL/RETAINING WALL | Partial Approval | GARAGE B-1, CRASH WALLS AT GL: 5/F.7 - E. OK TO PLACE CONCRETE. | |
06/14/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS AT LEVEL #4: GL: 4.7/L, 4.1/7, 3/L, 3.9/J. J/3.1, K/3.3-2, H/2, G/2, 3.1/G. SHEAR WALLS #11 AND #12. OK TO PLACE CONCRETE. | |
06/13/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 5 SOUTHWEST COLUMNS E7/4.5,5,5.5,6.5,8 AND G2/4.5, G4/5, J5/7.8, L/4.7,5.7,7.3 AND SHEARWALLS 12 WEST AND 13 ALL OK TO POUR. |
|
06/11/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
06/09/2018 | STEM WALL/RETAINING WALL | Partial Approval | REMAINING COLUMNS LEVEL 4 NORTH (11) AND SHEARWALL 2 OK TO POUR | |
06/08/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 3 N 13 COLUMNS OK TO POUR. SHEARWALLS 1,3,4,5,6,7,8 (CORE) OK TO POUR | |
06/07/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 4 NORTH OK TO POUR LEVEL 4 COLUMNS NORTHWEST OK | |
06/06/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
06/05/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 4 SW10 OK TO POUR | |
06/05/2018 | STEM WALL/RETAINING WALL | Partial Approval | WEST CRASH WALL AT B2 RAMP, RETAIL ELEVATOR BOTTOM AT B2 OK TO POUR | |
06/01/2018 | STEM WALL/RETAINING WALL | Partial Approval | LOW WALLS AT COURTYARD OK TO POUR | |
05/31/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 3 SW2 OK TO POUR. | |
05/30/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 3 CORE, SHEARWALL 1, SHEARWALL 3 ALL OK TO POUR. | |
05/29/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 1 STARTER WALLS EAST SIDE OK TO POUR COLUMNS LEVEL 3 NORTH OK TO POUR |
|
05/25/2018 | STEM WALL/RETAINING WALL | Partial Approval | OBSERVED BEGINNING OF COLUMN REPAIR USING EUCOCRETE SELF CONSOLIDATING MIX. WORK IS BEING DONE RIGHT. CRASH WALLS ON LEVELS B1 AND B2 AT RAMP OK TO POUR. |
|
05/18/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 3 SHEARWALLS 12W, 10, AND 11 OK TO POUR LEVEL 2 SHEARWALL 7, 8, 9 (ELEVATOR SHAFT) OK TO POUR LEVEL 3 COLUMN G4/5 |
|
05/16/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 3 COLUMNS SOUTH ALL EXCEPT G.4/5 SHEARWALLS SW13 AND 12E OK TO PLACE CONCRETE |
|
05/14/2018 | STEM WALL/RETAINING WALL | Partial Approval | MAIN ELEVATOR SHAFT WALLS LEVEL 2 NORTH, NORTHEAST, AND NORTHWEST WALLS OK TO PLACE CONCRETE. | |
05/11/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 2 SHEARWALL 2 OK TO PLACE CONCRETE | |
05/10/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 2 COLUMNS 8/D7, E5.5, 7/E7, 3.9/B,D1,E4, 3/A,B,D,D6,E6, 2/A,C1,D8,E6 AND SHEARWALLS 1 & 3 OK TO PLACE CONCRETE. | |
05/02/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 2 SHEARWALL 10 AND 3 COLS 2.9 & 3.9/G, 4.5/F.7, | |
05/01/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
04/30/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 2 SOUTHEAST QUADRANT COLUMNS. (8) OK TO POUR. GRID LINES2/G,H,J.4,K.P AND 3/L,3.1/J,4.1/L,4/J |
|
04/28/2018 | STEM WALL/RETAINING WALL | Partial Approval | L2 COLUMNS - SW QUADRANT COLUMNS AND SHEARWALLS OK TO POUR. GRID LINE L/4.7,5.7,7.3 AND 5/F.7,G.4,G.8 AND SHEARWALLS 11,12,13 |
|
04/27/2018 | STEM WALL/RETAINING WALL | Denied | COLUMNS LEVEL 2 SW QUADRANT MISSING LAYOUT AND GRADE. RE-CALL FOR AFTER HOURS INSPECTION. | |
04/26/2018 | STEM WALL/RETAINING WALL | Partial Approval | SHEAR WALLS: LEVEL #1 TO LEVEL #2: SHEAR WALL #4, SHEAR WALL #9. OK TO PLACE CONCRETE. | |
04/25/2018 | STEM WALL/RETAINING WALL | Cancelled | CONTRACTOR CANCELLED | |
04/24/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #1, SECTIONS: RETAIL , LOBBY: 9 COLUMNS AT GL: 8/D.7 - E.5.5; 7/D.9 - E.7; A/5.2 - 5.5; B/5.2 - 5.8; D.3/5.8 | |
04/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL #1: SHEAR WALL #SW 3 AT GL: D.8/4; COLUMNS: ON LEVEL #1: GL: 5/E.8; 2 @ GL: 3/A-B; A/2; 4/8.2. OK TO PLACE CONCRETE. | |
04/20/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | NO STEM/RETAINING WALLS READY FOR THIS INSPECTION. | |
04/19/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS ON LEVEL #1 TO LEVEL #2: AT GL: 3.9/A.3, B.1, E.4; 4.5/E.5, E.8; E.6/2, 2,1. 3/B, D, D.6 (C4, C5 AND C6 COLUMNS). OK TO PLACE CONCRETE. | |
04/13/2018 | STEM WALL/RETAINING WALL | Partial Approval | SW8 AT SOUTH ELEVATOR FROM B1 TO 1 OK TO POUR SERVICE ELEVATOR WALLS OK TO CLOSE FORMS |
|
04/12/2018 | STEM WALL/RETAINING WALL | Partial Approval | WEST WALL OF RAMP OK TO POUR | |
04/11/2018 | STEM WALL/RETAINING WALL | Partial Approval | CORBEL AT GL D.1/3.9 OK TO POUR WITH ADDED #3 BANDS AND EPOXY DOWELS | |
04/09/2018 | STEM WALL/RETAINING WALL | Partial Approval | STARTER WALL LEVEL 1 GL8 FROM A TO M AND GL 1.9 FROM K.9 TO M AND M1.0 TO 2.8 ALL OK TO POUR. | |
04/06/2018 | STEM WALL/RETAINING WALL | Partial Approval | SOUTH STARTER WALL LEVEL 1 6.4 TO 8 AND EAST WALL G2 TO K9 AND CORBEL E5 OK TO POUR | |
04/04/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | WORK NOT COMPLETE ENOUGH TO INSPECT | |
04/03/2018 | STEM WALL/RETAINING WALL | Partial Approval | CORBEL AT WEST SIDE OF RAMP (E/4) OK TO POUR COLUMN E/8 OK TO POUR |
|
04/02/2018 | STEM WALL/RETAINING WALL | Partial Approval | SHEARWALL ON EAST SIDE OF RAMP AND 3 COLUMNS IN MIDDLE OF RAMP OK TO POUR | |
03/28/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 1 SOUTH 6" LOW WALL GL M FROM 4.7 TO 6.4 LEVEL B1 GL 8 WALL FROM A TO C - ALL OK TO POUR |
|
03/27/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
03/26/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B1 CORE (ELEVATORS 1,2,3) OK TO POUR WALLS | |
03/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B1 SHEARWALLS 1 & 2 LEVEL B1 WEST SIDE WALL FROM F.7 TO NW CORNER LEVEL 1 COLUMNS 1.9 TO 4.7 SOUTH LOW WALL OK TO POR ALL OK TO POUR |
|
03/22/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS B/4.9, B/7, A.5/7.6, D/6.7, A.1/4.9 AND NORTH WALL FROM 4.9 TO 8 ALL OK TO POUR | |
03/22/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 1 SHEARWALL 3 (GL 3.9 FROM D TO E) OK TO POUR | |
03/20/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS B/5.2; B/5.8; D.3/5.8; D.9/7; E.7/7 AND SW 12 LEVEL 1 OK TO POUR | |
03/19/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 1 COLUMNS F.8 FROM 5.5 TO 8 (3 COL'S) AND J.3/7.5; L/7.3; G.8/5.5 SHEARWALLS 10 AND 13 LEVEL 1 ALL OK TO POUR |
|
03/16/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS L/5.7, L/4.1, J/3.1, G/3.1 AND SHEARWALL 11 (N/4.1 TO N/3.1) OK TO POUR | |
03/15/2018 | STEM WALL/RETAINING WALL | Partial Approval | GROUND LEVEL GL 2/K.9, J.4; GL3/L; J/3L9; L/4.7; GL5/H TO G (3 COLS) 4.5 6 TO T.4 (2 COLS) |
|
03/12/2018 | STEM WALL/RETAINING WALL | Partial Approval | North B1, Ties Loose or Missing on Some Horizonal Bars | |
03/08/2018 | STEM WALL/RETAINING WALL | Partial Approval | CRASH WALLS BOTH SIDES OF RAMP LEVEL B2 OK TO PLACE CONCRETE EAST WALL LEVEL B1 GL 1 FROM C.1 TO A OK TO PLACE CONCRETE |
|
03/05/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B2 PERIMETER WALL FROM GL 3.9 TO 8 AND A TO C OK TO POUR | |
03/02/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
03/01/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B1 GRIDLINE 1 FROM C.1 TO E OK TO POUR. LEVEL B1 SOUTHEAST CORNER COLUMN K.9/2 OK TO POUR. |
|
02/28/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B1 ON GL1 FROM E TO F OK TO POUR. SOUTHEAST CORNER K.9 FROM 1 TO 2 AND 2 FROM K.9 TO N OK TO POUR. LEVEL B2 RETAIL ELEVATOR (SW 4,5,6) OK TO POUR. |
|
02/27/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B1 COL. E.8/4 OK TO POUR | |
02/26/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B2, LINE 8 FROM F.8 TO C AND CORE 6 TO 5.3 / F TO E AND LINE 5.1 FROM F TO E. LEVEL B1 COLUMNS A.4/2.1, F.7/3.9, E8/3.9, F7/4.5, G2/4.5, F7/5.4, F7/7 AND SW10 AND PERIMETER WALL LINE 8 FROM F TO G.8. ALL OK TO PLACE CONCRETE. |
|
02/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS AT GL: 2.1/C.1, D.8, E.6, F.2; 3/D, D.6, E.6, G. OK TO PLACE CONCRETE. | |
02/22/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | WORK INCOMPLETE. WILL BE RESCHEDULED FOR 23 FEBRUARY. | |
02/21/2018 | STEM WALL/RETAINING WALL | Partial Approval | A.7/7.4, C/8-6.9 SHEAR WALL, SW-4 E-E.5/5.4 RAMP WALL. | |
02/16/2018 | STEM WALL/RETAINING WALL | Partial Approval | NORTH AND WEST WALLS LEVEL B2 - FOOTINGS OK TO POUR FROM GL A TO E AND 5.5 TO 8. COLUMNS 5.8 & 5.1 ON GL B OK TO POUR LEVEL B2. | |
02/15/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
02/14/2018 | STEM WALL/RETAINING WALL | Partial Approval | SOUTH WALL FROM GL 6.9 TO 4 LEVEL B1 | |
02/13/2018 | STEM WALL/RETAINING WALL | Partial Approval | SW2 L EVEL B2, COLUMN D.3/5.8 AND WALLS GL8 FROM F.5 TO G.8, GL A FROM 1 TO 2, GL 1 FROM A T0 B.4 ALL OK TO POUR | |
02/12/2018 | STEM WALL/RETAINING WALL | Partial Approval | FOOTINGS FOR COLUMNS B/5.2 AND 5.8 OK TO POUR | |
02/09/2018 | STEM WALL/RETAINING WALL | Cancelled | ||
02/08/2018 | STEM WALL/RETAINING WALL | Partial Approval | FOOTINGS: SW-2, COLUMNS AT GL: D.3/5.8, D.1.5. LEVEL #1 B-1: SW-11, SW-12, SW-13; SOUTH WALL AT GL: N/4.5 - 6.8. OK TO PLACE CONCRETE. | |
02/07/2018 | STEM WALL/RETAINING WALL | Partial Approval | WALL FOOTING AT GL: D.6/4 - 5.1; RAMP WALL AT GL: 5/E - G.4. BASEMENT WALL AT GL: H/F.8 - N. OK TO PLACE CONCRETE.- | |
02/06/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS 4.5/E.5 AND E.8 ON LEVEL B-2 COLUMNS H/2, J/3.1, 6.8/K,L AND 7.3/K,L |
|
02/05/2018 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS G.8/5.5 AND J.3/7.6 ON LEVEL 1; D.7,D.7,F.8/L ON LEVEL B OK TO POUR. | |
01/29/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
01/25/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL "B" EAST WALL OK TO POUR TO NE CORNER. | |
01/24/2018 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B2 ELEVATOR SHAFT WALLS OK TO POUR | |
01/22/2018 | STEM WALL/RETAINING WALL | Partial Approval | PA WEST WALL GL-1 FROM C TO D.8 | |
01/19/2018 | STEM WALL/RETAINING WALL | Partial Approval | ON GL 1 FROM G.5 TO K.9 OK TO POUR | |
01/17/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
01/12/2018 | STEM WALL/RETAINING WALL | Partial Approval | EAST SIDE OF RAMP WALL LEVEL B OK TO POUR WALL. | |
01/10/2018 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* | |
01/09/2018 | STEM WALL/RETAINING WALL | Partial Approval | FROM F7 TO N, 1-8, N-G.8 OK TO FORM; 1/10/18 WEST WALL GL H.1-N , S-WALL 4.5 TO 6.8 |