07/29/2019 EXCAVATION/LAYOUT REBAR & ZON Approved
06/19/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LEVEL 5 NORTH OK TO POUR
06/04/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LEVEL #4, SOUTH; 22 COLUMNS AT GL: F.8-L/2-8; 2/F.8-L; SHEAR WALLS #11, 12, 13. OK TO PLACE CONCRETE. AFTER HOURS INSPECTION 5-2-18. APA ACCOUNT TO BE CHARGED $165.
05/14/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LEVEL 3 SOUTH FROM F8 TO M AND 2 TO 8 SLAB OK TO POUR
05/07/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled
02/15/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/14/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/13/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/12/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/09/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/08/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/07/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/06/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/05/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/05/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SPOT FOOTINGS 4.5/E.5 AND E.8; 5/E.3 TO G.4
02/02/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL 8/D.4-D.5, 3 COLUME GL 7/D.9,E.7,F.8. WALL FOOTER AT G.4
02/02/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
02/01/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
01/31/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
01/30/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 3 columes GL F.7, E.8, F.8.
01/26/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTINGS F.6/D AND F.8/D.5 OK TO POUR
01/25/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
01/11/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval ELEVATOR SHAFT FOOTING OK TO POUR WITH ENGINEER APPROVAL
01/05/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval POUR 1 OF BASEMENT FLOOR OK TO POUR CHANGED FROM AP TO PA BY BSTEVENS ON 5/16/18
01/04/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SOUTH 1/3 OF FLOOR PROGRESSING, RE-CALL FOR TOMORROW
12/28/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval COLUMNS D.1/3.9 AND B/4.7 OK TO POUR
12/27/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection COL'S NOT READY, WILL RE-INSPECT TOMORROW AM
12/21/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTINGS FOR COLUMNS D.1/3.9 & B/4.7 ALSO SHEARALL SW3 OK TO POUR
12/20/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval COLUMNS B.2/20,21,30,39,47,48,51,52,53 ALL OK TO POUR
12/19/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval COL'S 4/E.4,E.8,F.7 AND 4/E.3-F.6 ALSO SW3 OK TO POUR
12/18/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FTG 3/D AND COL. FTG. C.1 NORTH TO CORNER THEN WEST TO 4.2 COL. FTGS. AND PREIMETER FTG. OK TO POUR
12/15/2017 EXCAVATION/LAYOUT REBAR & ZON Cancelled
12/14/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval NORTHWEST CORNER SPREAD FOOTONGS OK TO POUR
12/12/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval COLUMNS B.2, B.1 / 4.5, 5.7,6.2 G.4/5, D.6/3 ALL OK TO POUR
12/11/2017 EXCAVATION/LAYOUT REBAR & ZON Cancelled nothing to inspect.
12/08/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTINGS FOR COLUMNS 4.5/F.7,G.2 AND G.4/5 OK TO POUR.
SHEARWALLS 10,11,12 OK TO POUR.
12/06/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval COLUMNS H5 AND H5.7 OK TO POUR FOOTING.
12/05/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval EAST SIDE PERIMETER FOOTING OK TO POUR. FOOTING AT SW 12 OK TO POUR, COLUMNS 3/E.6 AND 3/G.2 OK TO POUR
12/04/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SHEARWALL FOOTING POUR TODAY OK
12/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SHEARWALLS 10 AND 11 FOOTING GRIDLINE G-J.4 / 2.5 TO 4.5 AND COLUMN FOOTINGS G, H, J.4 / 1.9, 3, 4, 4.7, 5.7, 6.8, 7.3, 7.6 / L TO J.4 OK TO POUR.
11/30/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval SAME AS YESTERDAY
11/29/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL 4.5 SOUTH END EAST TO CORNER AND NORTH TO GL F, OK TO POUR AFTER SCRAPPING OUT FOOTINGS. WILL RE-VISIT ON 11/30 PRIOR TO POUR.
11/28/2017 EXCAVATION/LAYOUT REBAR & ZON Cancelled
11/27/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FROM COLUMN 81 SOUTH TO CORNER AND EAST TO GRID LINE 4.5, OK TO POUR PERIMETER FOOTING AND WEST AND SOUTH SPOT FOOTINGS. SOME CLEANUP REQUIRED PRIOR TO POUR.
11/14/2017 EXCAVATION/LAYOUT REBAR & ZON Cancelled CONTRACTOR CANCELLED.
11/13/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection
11/09/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection rebar not in place.
11/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval THIS SITE VISIT WAS TO DISCUSS THE FOUNDATION SCHEDULING TO BEGIN NEXT WEEK. ALL INSPECTIONS FROM THIS DATE FORWARD WILL BE ON THIS PERMIT ONLY.