Case: T08FR04151

Parcel: 117110880


Addresses:

160 N STONE AV


Inspection Status: Correction Required

Inspection History: INSP - FULL

Case Number - T08FR04151

Inspection Description - INSP - FULL

Inspection Status - Correction Required

Date Description Inspector Results Comments
02/09/2009 INSP - FULL Correction Required ADDENDUM TO 1 ST. NOTICE
5) SECOND FLOOR WEST END - THIS AREA WAS AT ONE TIME AT THE EXTERIOR OF THE BUILDING, WHERE AS IT IS NOW PART OF THE INTERIOR SPRINKLER PROTECTION SHALL BE ADDED

6) IT IS RECOMMENDED TO GET A BID FROM A DRYWALL CONTRACTOR FOR REPAIRING THE CEILING AND ALSO ONE FROM A SPRINKLER CONTRACTOR TO CORRECT THE DEFICIENCY IN SPRINKLER PLACEMENT WITH THE CEILING LEFT AS IT IS. EITHER OPTION SHALL BE SUBMITTED TO SYSTEMS ENGINEERING, FIRE PREVENTION, FOR CLARIFICATION
01/30/2009 INSP - FULL Correction Required SECOND NOTICE
THIS OFFICE HAS NOT RECEIVED A REPORT OF COMPLIANCE FOR THE NOTICE DATED 11-3-2008, FOR THE ABOVE LISTED DEFICIENCIES CONCERNING THE FIRE PROTECTION SYSTEM AT 160 N. STONE. IF CORRECTED, HAVE THE CONTRACTOR OF RECORD FORWARD THEIR REPORT.
11/03/2008 INSP - FULL Correction Required DURING THE AANUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE FORWARDED TO THIS OFFICE

1) IF THE MAIN CONTROL VALVE IS NOT IN A SECURE AREA IT SHALL BE SECURED WITH A LOCK AND CHAIN

2) THE FULL SPRINKLER SYSTEM SHALL BE MONITERED FOR WATER FLOW. A SECTION OF THE BUILDING IS SUPPLIED FROM A MECHANICAL T AT THE FIRE DEPT. CONNECTION. A WATER FLOW DEVICE FOR THIS AREA IS NOT CONNECTED

3) THE CEILING AT THE SECOND FLOOR SHALL HAVE BE REPLACED, TO FACILITATE HEAT COLLECTION IN THE EVENT OF A SITUATION

4) ALL CENTRAL, MODEL G. B. SPRINKLER HEADS ON THE 3RD. FLOOR, THAT ARE ON RECALL SHALL BE REPLACED