Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case Details

Status:

FIELD

Type:

COMPLAINT (COMMERCIAL)
Address:

Entered Date:

11/03/2008

Applicant:

160 NORTH STONE LLC

Description:

SPRINKLER INSPECTION

Outstanding Inspections

Case Number: T08FR04151
Case Status: FIELD
Case Description: COMPLAINT (COMMERCIAL)
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
11/03/2008 INSP - FULL EDESCHAI Correction Required DURING THE AANUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE FORWARDED TO THIS OFFICE 1) IF THE MAIN CONTROL VALVE IS NOT IN A SECURE AREA IT SHALL BE SECURED WITH A LOCK AND CHAIN 2) THE FULL SPRINKLER SYSTEM SHALL BE MONITERED FOR WATER FLOW. A SECTION OF THE BUILDING IS SUPPLIED FROM A MECHANICAL T AT THE FIRE DEPT. CONNECTION. A WATER FLOW DEVICE FOR THIS AREA IS NOT CONNECTED 3) THE CEILING AT THE SECOND FLOOR SHALL HAVE BE REPLACED, TO FACILITATE HEAT COLLECTION IN THE EVENT OF A SITUATION 4) ALL CENTRAL, MODEL G. B. SPRINKLER HEADS ON THE 3RD. FLOOR, THAT ARE ON RECALL SHALL BE REPLACED