Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel117110880
11714383A
12711069A
JurisdictionTucson
City of Tucson ZoningOCR-2
Tucson WardWard 6
Tucson Downtown Incentive ZoneDowntown Core, Downtown Infill Incentive District
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodDowntown
RedevelopmentDowntown Redevelopment District
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 160 N STONE AV
Date - 11/24/2024 11:54 a.m.
Total Number Of Historic Records Requests - (2)
Name Action
Address: 160 N STONE AV - Doc Type: CERT OF OCC VIEW
Address: 160 N STONE AV - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 160 N STONE AV
Date - 11/24/2024 11:54 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Special Development Requests & Requirements

Address: 160 N STONE AV
Date - 11/24/2024 11:54 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000000087 CLOSED 02/06/2008 N/A Historical Information

Permits

Address: 160 N STONE AV
Date - 11/24/2024 11:54 a.m.
Total Number Of Permits - (30)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-0824-01536 Inspections 08/07/2024 05/21/2025 Commercial Building Interior remodel of 2nd Floor (Tenant Improvement Scope) - minor alteration of MPE; no structure.
TC-COM-0523-01390 Complete 05/25/2023 01/15/2024 Commercial Building Certificate of Occupancy to Increase the Occupant Load
T22RW01829 Complete 05/13/2022 01/17/2023 Right-of-Way (ROW) Cox to start on the eastside of 200 N Stone Ave in the alley heading south,begin bore and place (3) 2" conduits and (1) 4" conduit, 51' and continue on to private property ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 5. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 6. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 7. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 9. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 10. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 11. MAINTAIN PEDESTRIAN ACCESS 12. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 13. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722
TF-FCP-0424-00338 Issued 04/30/2024 05/09/2025 Fire Construction Permit add fire alarm devices for renovated elevators
P97AN01769 ISSUED 07/18/1997 N/A #300 ADDRNEW
T00BU03364 FINAL 11/14/2000 08/20/2001 SPKLR FIRE:SPKR:RELOCATE 49/NEW 3
T00CM00945 EXPIRED 02/28/2000 08/27/2000 COMBO NON-BEARING DEMOLITION ONLY:OFFICE DEMOLITION ONLY ON 1ST FLOOR NON-BEARING DEQ # 5201
T00CM02406 FINAL 05/10/2000 08/28/2001 COMBO TI:OFFICE 1ST FLOOR
T01EL00211 FINAL 01/30/2001 09/02/2001 ELECT SIGN:ELECTRIC:1985
T06MS00149 ISSUED 05/11/2006 N/A MISC
T06MS00169 ISSUED 05/22/2006 N/A MISC
T09BU00968 FINAL 07/01/2009 01/09/2010 SPKLR Relocate 5 fire sprinklers
T12EX00626 CLOSED 11/16/2012 01/15/2013 EXCAV REMOVE & REPLACE 45LF OF BRICK PAVER/SIDEWALK AREA TO PLACE 1 INCH PVC CONDUIT FOR TIME WARNER FIBER.
T16EX01999 FINAL 05/20/2016 07/23/2016 EXCAV Geotechnical borings (vertical) at 2 locations on Srone Ave with soil sampling to a depth of 3 feet between Alameda St and Broadway Bl *****NOTE: WE BELIEVE THAT HERE IS APPROXIMATELY 11 INCHES OF CONCRETE UNDER 6-8 INCHES OF ASPHALT ON BOTH BORING HOLES*****
T16TC01249 EXPIRED 05/20/2016 N/A BARRICAD Geotechnical borings (vertical) at 2 locations on Stone Ave with soil sampling to a depth of 3 feet between Alameda St and Broadway Bl
T18RW03709 FINAL 08/16/2018 10/19/2018 ROW 4 LF 100' EAST OF THE INTERSECTION OF STONE AND ALAMEDA TO REPAIR LEAKING 10" MAIN
T18RW03858 FINAL 08/28/2018 10/27/2018 ROW N.416762 - Job will access Manhole in rear alley at Address for addl fibers in UG facilities. From MH in alley to customers 2nd floor Mpop there is 1-4” CBO oocupied with 2 copper cables. One 400pr copper cable must be removed to make room for 24Plenum fiber cable in Corrugated\ plenum innerduct. After removal and entrance fiber in place, take fibers down into 1st floor Customer Apop. CLEAR PATH btwn MPOE and DEMARC required; approx.110 feet, w/ a 200 foot Fiber drop.
T20CM00524 FINAL 01/23/2020 02/28/2021 COMBO E - UPGRADE HAVAC
T21CM07716 C OF O 09/27/2021 10/19/2022 COMBO TI:MEDICAL OFFICE 3rd Floor
T21CM07783 VOID 09/29/2021 N/A COMBO tenant improvement - Rework interior partitions and ceiling, interior facelift, rework HVAC, add plumbing and rework electrical.
T21FC00062 FINAL 01/26/2021 10/12/2021 FIRECONS REPLACE THE EXISTING FACP AND INSTALL A CELLULAR TRANSMITTER TO MONITOR THE FIRE ALARM PANEL.
T22FC00103 FINAL 02/09/2022 10/19/2022 FIRECONS INSTALL A NEW NAC PANEL AND HORN/STROBES AND STROBES AS NECESSARY.
T22FC00135 FINAL 02/23/2022 10/19/2022 FIRECONS NFP to modify the existing fire sprinkler system.
T22RW00404 FINAL 02/07/2022 06/24/2022 ROW Boring through existing pavement for asphalt and soils evaluation @ 2 locations along Alameda St. between Stone to 6th Ave. Total depth of 8" auger to depth of 5.0'. (Location on attached map.) ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. ARTERIAL / COLLECTOR WORK IS BEHIND 460 N STONE AV - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY ADDRESS ON APPLICATION- Alameda St.: Stone to 6th Ave 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 7. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 8. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 9. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 10. MAINTAIN PEDESTRIAN ACCESS 11. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 12. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
T97BU00997 EXPIRED 06/12/1997 12/15/1997 BUILD DEMOLITION:INTERIOR NON-BEARING PARTIONS ON 3RD STORY OF 3 STORY W/PENTHOUSE.
T97BU01704 FINAL 08/26/1997 04/06/1998 #300 SPKLR FIRE SPKR:ADD 70
T97BU01797 FINAL 09/05/1997 05/20/1998 BUILD ADDITION:ELEVATOR
T97CM02198 C OF O 07/18/1997 04/04/1998 COMBO TI: OFFICE:ELEC UPGRADE 1200 AMP
T97EL00144 FINAL 03/17/1997 09/14/1997 ELECT ELECTRIC RECONNECT: LEASING AND INSPECTION
TUC-21029 RENEWAL 06/03/1997 10/07/1999 VESSEL

Record Requests

Address: 160 N STONE AV
Date - 11/24/2024 11:54 a.m.
Total Number Of Requests - (4)
Request Number Status Request Date Completed Date Type Description
REQ-0624-04162 Complete 06/07/2024 06/18/2024 Requests *ALL HISTORICAL DATA UPLOADED FOR ADDRESS RANGE: 160-162. FOR NEWER/CURRENT INFO, PLEASE CHECK PRO.* - Need original drawings prior to 2013 showing the following: structural cross sections structural framing plans foundations plans elevator plans and cross section floor plans and roof plans I can come in and personally view microfiche if that helps you - Bill Ford 520-332-4009
REQ-0723-03936 Complete 07/19/2023 07/21/2023 Requests Certificate of Occupancy
REQ-0723-04048 Complete 07/24/2023 07/27/2023 Requests duplicate from REQ-0723-03936 C of O issued A revised Certificate of Occupancy to Increase the Occupant Load with the new Occupant numbers. Call me at 520-332-4009 when this is done, please. Bill Ford
REQ-1222-00364 Complete 12/09/2022 12/30/2022 Requests Cox to start on the eastside of 200 N Stone Ave in the alley heading south,begin bore and place (3); Work Order: PRJ221671-1