Permit: TC-COM-1223-02769
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
502 S FREMONT AV
Address NEW:
502 S FREMONT AV
Apply Date:
12/01/2023
Applicant:
Jesus Lozano
Description:
SUBMITTING SITE PLAN, FLOOR PLAN AND ELEVATION REQUESTING ZONING AND ENGINEERING REVIEW TO REQUEST A DDO FOR THIS PROJECT. (Development Package has been applied for separately)
Permit Reviews
Permit Number - TC-COM-1223-02769
Permit Status: Inspections
Permit Description: SUBMITTING SITE PLAN, FLOOR PLAN AND ELEVATION REQUESTING ZONING AND ENGINEERING REVIEW TO REQUEST A DDO FOR THIS PROJECT.
(Development Package has been applied for separately)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2024 | COMMERCIAL REVIEW - FULL v.2 | 02/28/2024 | REQUIRES RESUBMIT |
| 03/12/2025 | COMMERCIAL REVIEW - FULL v.6 | 03/26/2025 | REQUIRES RESUBMIT |
| 04/07/2025 | COMMERCIAL REVIEW - FULL v.8 | 04/28/2025 | APPROVED |
| 01/28/2025 | COMMERCIAL REVIEW - FULL v.4 | 02/13/2025 | REQUIRES RESUBMIT |
| 04/28/2025 | RESTAMP - COMMERCIAL v.1 | 04/30/2025 | APPROVED |
| 09/13/2024 | COMMERCIAL REVIEW - FULL v.3 | 10/11/2024 | REQUIRES RESUBMIT |
| 12/06/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/06/2023 | REQUIRES RESUBMIT |
| 02/24/2025 | COMMERCIAL REVIEW - FULL v.5 | 03/10/2025 | REQUIRES RESUBMIT |
| 04/04/2025 | COMMERCIAL REVIEW - FULL v.7 | 04/04/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1223-02769
Permit Status: Inspections
Permit Description: SUBMITTING SITE PLAN, FLOOR PLAN AND ELEVATION REQUESTING ZONING AND ENGINEERING REVIEW TO REQUEST A DDO FOR THIS PROJECT.
(Development Package has been applied for separately)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/18/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 03/18/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 03/18/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1223-02769
Permit Status: Inspections
Permit Description: SUBMITTING SITE PLAN, FLOOR PLAN AND ELEVATION REQUESTING ZONING AND ENGINEERING REVIEW TO REQUEST A DDO FOR THIS PROJECT.
(Development Package has been applied for separately)
| Date | Description | Comments |
|---|---|---|
| 12/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/06/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1223-02769
Permite Description: SUBMITTING SITE PLAN, FLOOR PLAN AND ELEVATION REQUESTING ZONING AND ENGINEERING REVIEW TO REQUEST A DDO FOR THIS PROJECT.
(Development Package has been applied for separately)
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2026 | COT - HCME - Venting | N/A | Re-inspection required | 6-11-26: called & left poc a voicemail. Arrived on site- no access. Reschedule inspections at your convenience. |
| 10/16/2025 | COT - HCPL - Plumbing Final | N/A | Not Ready | |
| 06/12/2026 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
| 11/26/2025 | COT - HCBU - Masonry Pregrout | N/A | Not Ready | Contractor cancelled. |
| 06/12/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/12/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Fire extinguisher shall be in each unit. |
| 06/12/2026 | COT - HCBU - TCO | N/A | Not Ready | |
| 07/01/2026 | ENGR Engineering Final | N/A | Re-inspection required (with fee) | 7/1/26 - Three (3) sidewalks on north side are too steep, up to 15% running slope. These need to be 5% max without a railing or 8.33% max with a railing. These routes are indicated as the refuse container path for each unit. Scuppers have been excluded on the north side, pavers have been installed instead. The backup spur in the parking area is 18 inches shorter than the plan calls for. Walls have been excluded from this project. A revised plan reflecting the changes needs to be submitted and approved. |
| 07/01/2026 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Not Applicable | |
| 07/01/2026 | COT - HCEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1223-02769
Permit Description: SUBMITTING SITE PLAN, FLOOR PLAN AND ELEVATION REQUESTING ZONING AND ENGINEERING REVIEW TO REQUEST A DDO FOR THIS PROJECT.
(Development Package has been applied for separately)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2025 | COT - HCPL - Rough Soil | Passed | Ok to cover plumbing progress areas. | |
| 07/08/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 07/08/2025 | COT - HCEL - Grounding/Bonding | Passed | Rebar ufer at Southwest corner area. | |
| 07/08/2025 | COT - HCBU - Preslab | Passed | Ok to place concrete in slab area. Ensure slab area is termite treated. | |
| 08/20/2025 | COT - HCBU - Framing | Passed | ||
| 08/20/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 08/20/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 09/11/2025 | COT - HCPL - Sewer | Passed | Ok to cover progress areas. | |
| 11/03/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 11/03/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 11/03/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 12/02/2025 | COT - HCBU - Interior Shear Bracing | Passed | Sheet rock nailing for Units #2 and 3. Ok to tape throughout. | |
| 02/03/2026 | COT - HCPL - Yard Water Line | Passed | Three each 1” water lines from,building to new location of water meters when Tucson Water installs meters. Ok to cover trenching. | |
| 06/15/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/12/2026 | COT - FCON - Sprinkler - Final | Passed | Approved on TF-FCP-1025-00888 on 5/11/2026. | |
| 06/12/2026 | COT - HCBU - Roof Nailing | Passed | ||
| 06/23/2026 | COT - FCON - Fire - Final | Passed | ||
| 07/01/2026 | COT - HCBU - Building Final | Passed | ||
| 07/01/2026 | COT - HCBU - CofO | Passed | ||
| 07/01/2026 | COT - HCEL - Electrical Final | Passed | ||
| 07/01/2026 | COT - HCEL - Outdoor Lighting | Passed | ||
| 07/01/2026 | COT - HCME - Mechanical Final | Passed |