Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
502 S FREMONT AV
Address NEW:
502 S FREMONT AV
Apply Date:
04/20/2026
Applicant:
Rosa Garcia
Description:
The project provides a single continuous ADA-compliant accessible route connecting the public sidewalk along S Fremont Ave to the building entrance.

Permit Reviews

Permit Number - TR-ROW-0426-00453
Permit Status: In review
Permit Description: The project provides a single continuous ADA-compliant accessible route connecting the public sidewalk along S Fremont Ave to the building entrance.
Start Date Submittal Complete Date Status  
04/21/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0426-00453
Permit Status: In review
Permit Description: The project provides a single continuous ADA-compliant accessible route connecting the public sidewalk along S Fremont Ave to the building entrance.
Total Outstanding Activity Conditions - 5
Date Name
04/21/2026 Traffic Control set-up approved between 7AM - 5PM
04/21/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/21/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/21/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206
04/21/2026 Please see attachments for storm to shade conditions.