Building sustained major structural storm damage, primarily consisting of:
Upper roof loss
Second-floor ceiling collapse/displacement
Upper perimeter brick/masonry collapse and displacement
Damage to roof/framing connections
Exposed and potentially compromised wood framing
Water damage to exposed second-floor apartments
Loose brick and falling-debris hazards
Apparent bowing/leaning of portions of the rear exterior wall
Uncertain condition of the existing foundation and structural supports
Asbestos has been found in multiple areas and require containment and demolition.
The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established.
These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed