Plan: TP-PRE-1026-00204
Plan Details
Status:
In review
Type:
Pre-Application
Apply Date:
10/07/2026
Applicant:
Mario
Description:
Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
Architects:
- Evolution Restoration and renovation
Contractors:
Plan Reviews
Plan Number - TP-PRE-1026-00204
Plan Status: In Review
Plan Description: Building sustained major structural storm damage, primarily consisting of:
Upper roof loss
Second-floor ceiling collapse/displacement
Upper perimeter brick/masonry collapse and displacement
Damage to roof/framing connections
Exposed and potentially compromised wood framing
Water damage to exposed second-floor apartments
Loose brick and falling-debris hazards
Apparent bowing/leaning of portions of the rear exterior wall
Uncertain condition of the existing foundation and structural supports
Asbestos has been found in multiple areas and require containment and demolition.
The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established.
These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/12/2026 | Pre-Application Conference Historic Review v.1 | APPROVED |