Activity Search: TC-COM-0526-00737
Activity
Parcel Attributes
| Parcel | 14122004L |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-2 |
| Airport Environs Zone | NCZ-A Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 4 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 05/21/2026 6:09 p.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0526-00737 | In Review | 05/19/2026 | N/A | BLDG 2 | Commercial Building | This Commercial New Building Permit submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238 and the development package permit submittal TD-DEV-0126-00008. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height (22' peak height) to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 54’x37.5’ (2,025 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab. The drawing sets for the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc. facility in Tucson, AZ. Faribault Foods and G3 Water Engineers (G3) were advised by the building official via email to split the Commercial New Building application into (2) separate permits: 1. “Permit #1”is to cover the construction of the two bolted steel wastewater treatment tanks, cooling tower, and sludge storage tanks, and associated underground piping. 2. “Permit #2” is to cover the slab and erection of the pre-engineered metal building, equipment canopy, and associated building systems designs. Per the email, the Permit #2 submittal will be broken into a “Phase 1” covering the foundation and slab design to expedite review of the concrete work. Permit #2 Phase 2 will cover the above-grade building/canopy structure, equipment anchorage, and electrical, heating/cooling, and plumbing disciplines per the “Project Description” section below. This submittal is intended to cover Phase 1 structural foundation and slab design for the two bolted steel wastewater treatment tanks, cooling tower slab, and sludge tanks slab. As a one-time adjustment for this permit, Special Inspections Certificate form will be submitted prior to Start of Inspections as a deferred submittal per Justin Eder (see email dated 15 May 2026). |