Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel14122004L
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningI-2
Airport Environs Zone

NCZ-A Davis Monthan AEZ Paddle

Tucson WardWard 4
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 05/21/2026 6:09 p.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-0526-00737 In Review 05/19/2026 N/A BLDG 2 Commercial Building This Commercial New Building Permit submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238 and the development package permit submittal TD-DEV-0126-00008. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height (22' peak height) to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 54’x37.5’ (2,025 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab. The drawing sets for the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc. facility in Tucson, AZ. Faribault Foods and G3 Water Engineers (G3) were advised by the building official via email to split the Commercial New Building application into (2) separate permits: 1. “Permit #1”is to cover the construction of the two bolted steel wastewater treatment tanks, cooling tower, and sludge storage tanks, and associated underground piping. 2. “Permit #2” is to cover the slab and erection of the pre-engineered metal building, equipment canopy, and associated building systems designs. Per the email, the Permit #2 submittal will be broken into a “Phase 1” covering the foundation and slab design to expedite review of the concrete work. Permit #2 Phase 2 will cover the above-grade building/canopy structure, equipment anchorage, and electrical, heating/cooling, and plumbing disciplines per the “Project Description” section below. This submittal is intended to cover Phase 1 structural foundation and slab design for the two bolted steel wastewater treatment tanks, cooling tower slab, and sludge tanks slab. As a one-time adjustment for this permit, Special Inspections Certificate form will be submitted prior to Start of Inspections as a deferred submittal per Justin Eder (see email dated 15 May 2026).