Review Date Reviewer's Name Type of Review Description Status Comments
08/31/2022 SSHIELD1 ENGINEERING REVIEW Passed
08/31/2022 STEVE SHIELDS ZONING REVIEW Approved
08/31/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/02/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM06325

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Refer to Mechanical Drawings, Mechanical HVAC Partial Roof Install Plan M1.RA, M1.RB, M1.RC and M9.1. Condenser Units HPCU-2 thru HPCU-7, each weighing 250 pounds are being added on the existing Roof. Provide Structural Calculations justifying the adequacy of Roof Members to support additional loads of the Condenser Units.
2. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings

BUILDING REVIEW COMMENTS:
Denied
1. General: There are several doors swinging in the wrong direction. Door must swing in the direction of egress. Provide correctly swinging door in accordance with Section 1010.1.2.1.
2. General: Additional exit lighting may be required at inspection.
3. General: Provide the fire sprinkler information.


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval

ELECTRICAL REVIEW COMMENTS
Denied
1. Sheet E1.1A1: Show dash line used for feeder in electrical symbols page
2. Sheet E1.1A2: All 125 V, 15 and 20 ampere receptacles within 6 ft of sink in space BREAK ROOM J0600 shall have ground-fault circuit-interrupter protection for personnel.. NEC 2017, 210.8(B)(5)
3. Sheet E1.1A2: Appliances vending machines, ice/water dispenser in space BREAK ROOM J0600 shall be provided with GFCI protection for personnel. NEC 2017, 422.5(A)
4. Show compliance for branch circuits and feeders to meet voltage drop requirements in 2018 IECC, C405.9.
5. Sheet E1.1A4: Include rectangle with "P/D" in it in the symbols page.
6. Include list for abbreviations used
7. Sheet E1.1C1: Appliances vending machines, ice/water dispenser in space BREAK ROOM D0620 shall be provided with GFCI protection for personnel. NEC 2017, 422.5(A)
8. Show dimensions for pull boxes used to splice feeders.
9. Show a lighting control narrative / matrix / table for all interior lighting. 2018 International Energy Conservation Code C103.2(10)
10. Show location of daylight zones on lighting floor plan. 2018 International Energy Conservation Code C103.2(11)
11. Show documentation that emergency luminaires can provide initial illumination not less than the value required in the International Building Code 2018, 1008.3.5 along the path of egress at floor level.
12. Sheet E7.2: Show a note clarifying which type of feeder tap rule is being used for busway feeder taps and show compliance with all tap rule requirements.
13. Sheet E7.3: Lower left sheet information cut off.
14. Sheet E7.1, E7.2, E7.3, E7.4: Several 250 amps busways have 100 amps or 200 amps overcurrent protection. Busways shall be protected against overcurrent in accordance with the allowable current rating of the busway. NEC 2017, 368.17(A) Provide a datasheet or model number for busway.
15. Sheet E7.4: Show raceway and conductors sizes for feeder feeding BW-L/J-6
16. Other comments may follow once above comments are addressed.


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). Process piping pages M4.1A thru M4.1F missing from plan set -IPC 106.3.1
2.)-Any make-up water connections require RPZ Backflow Protection. -IPC 608.3



If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
09/13/2022 ROBERT SHERRY WATER REVIEW Completed
09/21/2022 JPEELDA1 FIRE REVIEW Reqs Change 1. General: There are several doors swinging in the wrong direction. Door must swing in the direction of egress. Provide correctly swinging door in accordance with Section 1010.1.2.1.
2. General: Additional exit lighting may be required at inspection.
3. General: Provide the fire sprinkler information on the cover sheet and show as a deferred submittal
Questions:

Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner
Tucson Fire Department

Final Status

Task End Date Reviewer's Name Type of Review Description
09/21/2022 NGARCIA3 OUT TO CUSTOMER Completed