Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T22CM03148
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/08/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1. Provide a site plan showing the location of the temporary electrical service on the building site and associated downstream equipment. 2. Provide a complete grounding detail that complies with NEC art 250.53A(2). 3. Provide information as to what the sqaure blocks with the number inside shown on the riser diagram for each floor represent. Plan sheet 1.01 4. Provide more detail on the riser diagram for the conduits and or cable types, conductors sizes and types that are feeding the sqaure boxes with the numbers 1 and 2 after the panel boards on each level. Plan Sheet 1.01. 5. Indicate how (wiring methods) the Buckhoist and Concrete Pumps will connect to the disconnects. Ref’ 2018 IBC sec 107.2.1, 2017 NEC. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/08/2022 | VVERA1 | OUT TO CUSTOMER | Completed |