Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel11706077R
JurisdictionTucson
City of Tucson ZoningPAD-33
Tucson WardWard 6
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodPie Allen
Major Streets & Routes

Arterial or Collector

National Register Historic District

Warehouse Historic District

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/22/2024 2:25 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL 08/07/1877 None

Rezoning Cases

Date - 11/22/2024 2:25 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-11-05 Downtown Links UOD UOD Closed 03/23/2011 N 4TH

Special Development Requests & Requirements

Date - 11/22/2024 2:25 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
T22SA00296 Complete N/A Zoning Compliance Letter for proposed multi-story mixed use project

Permits

Parcel Number - 11706077R
Date - 11/22/2024 2:25 a.m.
Total Number Of Permits - (56)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0124-00007 Complete 01/03/2024 05/06/2024 Right-of-Way (ROW) PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Work Order: DP19-0125
T22RW00032 Complete 01/05/2022 01/05/2024 Right-of-Way (ROW) PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Work Order: DP19-0125
TR-ROW-0124-00059 Complete 01/11/2024 07/31/2024 Right-of-Way (ROW) Installation of Hardscape and Landscape in RofW per DP plan, including water line connection Updated - 5/21/2024 - Renewal Requested for 60 day as of 5/30/2024.
TF-FCP-0123-00325 Complete 01/24/2023 12/07/2024 Fire Construction Permit Install new Fire Sprinkler System throughout the building.
TF-FCP-0223-00376 Complete 02/08/2023 12/18/2024 Fire Construction Permit Installation of new Fire Alarm/Voice Evacuation System in 13-Story R-2 residential building.
TF-FCP-0223-00417 Complete 02/23/2023 12/18/2024 Fire Construction Permit Emergency Responder Radio Communications Design/Install for Opus 4th Avenue Project in Tucson.
TC-COM-0223-00725 Complete 02/27/2023 01/15/2025 Commercial Building Construction of an Elevated Pool & Spa
TF-FCP-0324-00187 Void 03/08/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0223-00376 - Installation of new Stair Pressurization Panel in 13-Story R-2 residential building.
T22CM02219 Issued 03/29/2022 03/30/2025 Commercial Building Foundation Only for Future Apartment Building
T22CM02222 Complete 03/29/2022 01/12/2025 Commercial Building Soil Nail and Shoring Plan for Future Apartment Building
TR-ROW-0423-00590 Complete 04/03/2023 07/16/2023 Right-of-Way (ROW) Sidewalk Closure on 4th Ave
TR-UTL-0424-00694 Complete 04/03/2024 06/14/2024 Right-of-Way (ROW) - Utility (2) 3' x 3' bell holes in pavement, and an approximate 2' x 90' trench in pavement. Crews will be excavating along North side of E Stevens Ave.
TR-PIA-0424-00003 Complete 04/05/2024 12/14/2024 Private Improvement Agreement (PIA) Reconstruction of Herbert Ave, PIA Associated with DP19-0125
TS-PRM-0524-00190 Fees paid 05/02/2024 10/29/2024 Sign - Permanent New sign for Ari on 4th
T22RW01780 Complete 05/10/2022 07/27/2023 Right-of-Way (ROW) CLOSURE OF STEVENS AV FOR PARTNERS ON FOURTH PAD.STEVENS AV TO BE OPENED DURING 4TH AV STREET FA; Work Order: DP19-0125
DP19-0125 Issued 05/20/2019 10/08/2027 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 1030 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 1031 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 1032 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 331 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 332 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 431 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 432 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 531 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 532 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 631 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 632 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 730 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 731 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 732 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 830 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 831 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 832 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 930 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 931 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
DP19-0125 Issued 05/20/2019 10/08/2027 UNIT 932 Development Package *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
T22RW02032 Complete 06/01/2022 10/14/2022 Right-of-Way (ROW) DRY UTILITY AN CONDUIT INSTALLATION ASSOCIATED WITH TEP WORK PER DP19-0125, PARTNERS ON FOURTH PAD.
T22RW02058 Complete 06/07/2022 08/21/2022 Right-of-Way (ROW) PARTNERS ON FOURTH PAD, DP19-0125TEMPORARY SCAFFOLDING AROUND BUILDING PERIMETER FOR ENCLOSURE W; Work Order: DP19-0125
TR-ROW-0623-00873 Complete 06/14/2023 07/26/2024 Right-of-Way (ROW) CLOSURE OF STEVENS AV FOR PARTNERS ON FOURTH PAD.STEVENS AV TO BE OPENED DURING 4TH AV STREET FA; Work Order: DP19-0125. Extension for T22RW01780 Associated with DP19-0125
T22CM04922 Issued 06/29/2022 04/27/2025 Commercial Building New Mixed Use building with Apartment & Retail
T22FC00436 Complete 06/29/2022 01/27/2025 Fire Construction Permit Automatic Fire Extingshing Sys - Underground fire line for new building.; Commercial Fire Sprinkler Systems - Underground Fire Line Supply; Additional Plan Reviews: 1
T22RW02481 Complete 07/12/2022 10/18/2022 Right-of-Way (ROW) pulling underground cable into pull boxes** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF TH; Work Order: 6257816
TR-ROW-0724-00825 Complete 07/18/2024 08/17/2024 Right-of-Way (ROW) Ari on Fourth Av Grand Opening Move In Our move-in date for this new development is on August 16th. We are working with East Desert Barricades for the traffic control plan and just need the permit secured. The only barricades that will be used are on 8th Street in between Herbert and Fourth Ave west bound leaving east bound open. We will also be having Ari on Fourth detour signs to prevent our residents moving in driving on Fourth Ave and backing it up. TRAFFIC CONTROL SET UP AND TAKE DOWN: 7AM - 7PM
TC-CFO-0724-00151 Issued 07/25/2024 11/25/2024 Certificate of Occupancy T22CM04922 New Mixed Use building with Apartment & Retail
T22RW02910 Complete 08/13/2022 12/27/2022 Right-of-Way (ROW) INSTALLATION OF SANITARY SEWER MANHOLES AND CONNECTIONS INTO EXISTING SEWER. PER DP19-0125, PARTNERS
T22RW03215 Complete 09/06/2022 11/08/2022 Right-of-Way (ROW) Installing 2-8" fire protection services and 8" fife hydrant.** PROOF OF NOTIFICATION IS REQUIRED; Work Order: N/A
T22FC00687 Complete 10/05/2022 07/18/2024 Fire Construction Permit Flammable & Combustible Liquid - INSTALLATION OF GENERATOR WITH A 524 GALLON BASE TANK.; Other Construction Permit
T22FO00855 Complete 10/05/2022 10/10/2023 Fire Operational Permit Flammable & Combustible Liquid - CO2; Other Operational Permit
T22FO00856 Complete 10/05/2022 10/20/2024 Fire Operational Permit Hot Work Operations - OPUS DESIGN BUILD - POST TENSION CONCRETE CONSTRUCTION AND ENCLOSURE CONSTRUCTION.; Other Operational Permit
TR-ROW-1122-00090 Complete 11/23/2022 01/18/2023 Right-of-Way (ROW) Pedestrian tunnel along 4th Ave - construction of tunnel will take only a couple of hours so flaggers will be used for pedestrian traffic in the area.
TR-ROW-1223-01450 Complete 12/13/2023 05/01/2024 Right-of-Way (ROW) ROAD CLOSURE TO INSTALL UNDERGROUND RETENTION SYSTEM AND STORM DRAIN, TIE INTO EXISTING STORM DRAIN
T22CM03148 Issued 04/27/2022 01/22/2023 COMBO Underground Site Utility for water/sewer/elec
T22RW00694 Final 02/28/2022 07/17/2022 ROW 5 SYSTEM ABANDONMENTS PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
T22RW01565 Final 04/20/2022 08/27/2022 ROW Main replacement and reroute (10' INSTALLED IN DIRT AND 500' UNDER PAVEMENT) SEE ATTACHED DRAWINGS ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. N 4TH AV MITZ 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 3. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 4. MAINTAIN PEDESTRIAN ACCESS 5. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
T22RW01679 Final 04/28/2022 06/08/2022 ROW SIDEWALK AND ROADWAY CLOSURE FOR POTHOLING EXISTING UTILITIES FOR DESIGN OF TEP FEEDER RUNNING LINE PER ATTACHED DRAWING. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. CONTRACTOR SHALL COORDINATE STREET CLOSURES WITH SUN LINK, PARK TUCSON AND ABBUTING PROPERTY OWNERS.
T22RW02273 Final 06/22/2022 09/05/2022 ROW PARTNERS ON FOURTH PAD, DP19-0125 INSTALLATION OF CONTILEVERED BEAM SHORING OUTSIDE PROPERTY LINE. APPROVED SHORING PERMIT T22CM02222. APPLICANT/PROPERTY OWNER SHALL OBTAIN AN EASEMENT FROM THE CITY OF TUCSON FOR PILES AND SOIL NAILS TO REMAIN WITHIN THE PUBLIC RIGHTS-OF-WAY. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Plans

Parcel Number - 11706077R
Date - 11/22/2024 2:25 a.m.
Total Number Of Plans - 5
Plan Number Plan Status Application Date Expired Date Unit Type Description
TP-AMD-0424-00005 Void 04/05/2024 N/A Map/Use Change - Amendments Minor Amendment to PAD-33
TP-MOD-0424-000004 Complete 04/09/2024 10/06/2024 Modifications to Zoning Approvals Minor Amendment to PAD-33
TP-MOD-0524-000007 Complete 05/06/2024 11/02/2024 Modifications to Zoning Approvals Minor Amendment to PAD-33
C9-18-01 Effected 01/17/2018 N/A REZONING PROCEDURES
T17PRE0085 Closed 10/03/2017 N/A NEIGHBORHOOD NOTIFICATION