Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T22CM02219
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/31/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Sheet A0.01 Section 403.3.3 shows that you are adding an additional supply should it be 403.3.2 and if the building is not 420' a secondary supply would not be required? Sheet A0.01 Section 403.4 reminder your are also a R2 and local amendments shall apply for the fire alarm system Sheet A0.01 Section 403.4 ERRC note 510 of the IFC shall also read Building shall be tested for ERRC by PCWIN and the report provided to TFD Sheet A0.01 Chapter 9 please check our local amendments for R-2 requirements Sheet A0.01 Chapter 17 Required special inspections and test - 1705.18 Testing for smoke control shall be added Sheet A0.01 Chapter 30, 301.2 shall be added as a note Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@tucsonaz.gov 520-837-7033 Fire Plans Examiner |
05/31/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM02219 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved No mechanical plans submitted. No mechanical review required at this time. ELECTRICAL REVIEW COMMENTS Conditionally Approved E0.01 ELECTRICAL LEGEND AND SYMBOLS: No electrical issues E0.02 DRAWING INDEX: No electrical issues E0.03 LIGHTING FIXTURE SCHEDULE: No electrical issues E1.01 E1 - SITE PLAN: 2nd Utility feed equipment not shown. E2.00L LEVEL B1 - LIGHTING - AREA A: No electrical issues E2.00P LEVEL B1 - POWER - AREA A: No electrical issues E4.00 ENLARGED ELECTRIC ROOMS: No electrical issues E5.00 ELECTRICAL RISER LEGENDS AND DETAILS: No electrical issues Only the above sheets have permit approval (with comments) for site work. PLUMBING REVIEW COMMENTS: Denied Second Foundation Plumbing Review: 1). SAME-Details #2 & #3 on plan page P0.01F need to have the sump basins vented. --IPC 712.3.2 **Details not updated** 2 thru 5 OK 6).OK - Exterior drinking fountain will need to be protected from receiving storm water on building plans. 7 thru 9 OK 10). SAME- indicate the GPM load of the all the vertical foundation drainage Mat system connections on each affected plumbing page. -IPC 1106.2 ** GPM loads still not shown at the matt drainage system connections** 11). OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
06/14/2022 | LSHAMIS1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |