Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM02219
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/06/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Sheet A0.01 references Denver Fire If you have any fire questions please contact me: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner |
04/12/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM02219 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 2. Verify the design lateral pressure from the surcharge loads are included in the lateral earth pressure load and design of the foundation wall as indicated in IBC 2018 Section 1610.1 Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved No mechanical plans submitted. No mechanical review required at this time. ELECTRICAL REVIEW COMMENTS Conditionally Approved E0.01 ELECTRICAL LEGEND AND SYMBOLS: No electrical issues E0.02 DRAWING INDEX: No electrical issues E0.03 LIGHTING FIXTURE SCHEDULE: No electrical issues E1.01 E1 - SITE PLAN: 2nd Utility feed equipment not shown. E2.00L LEVEL B1 - LIGHTING - AREA A: No electrical issues E2.00P LEVEL B1 - POWER - AREA A: No electrical issues E4.00 ENLARGED ELECTRIC ROOMS: No electrical issues E5.00 ELECTRICAL RISER LEGENDS AND DETAILS: No electrical issues Only the above sheets have permit approval (with comments) for site work. PLUMBING REVIEW COMMENTS: Denied First Foundation Plumbing Review: 1). Details #2 & #3 on plan page P0.01F need to have the sump basins vented. --IPC 712.3.2 2). Label the piping of each of the drainage system periodically to indicate storm or sanitary on plan pages P2.00AF, P2.00BF, P2.01AF, P2.01BF. -IPC 106.3.1 3). Indicate the DFU load for the two 4" & one 8" base of stack connections on plan page P2.00BF -IPC 710.1 4). the two 4" horizontal sanitary connections that service floor sinks & floor drains on plan page P2.00BF Need backwater valves. -IPC 714.1 5). Why is only one of the sub-level horizontal storm drain connections on plan page P2.00BF protected by a backwater valve? there are several other Sub-level connections that service open area drains on this level that could overflow flood from a back up from above. -IPC 1101.9 6). First floor plumbing plans need to include sanitary piping to a required service sink & high/low drinking fountain. -IPC 403.1 7). Sanitary piping to breakroom sink on plan page P2.01BF needs to be illustrated. -IPC 106.3.1 8). Water main not illustrated? -IPC 106.3.1 9). Add Plumbing pages to sheet index- IPC 106.3.1 10). indicate the GPM load of the all the vertical foundation drainage Mat system connections on each affected plumbing page. -IPC 1106.2 11). Add vertical foundation drainage Mat system detail to plan page P0.01F- IPC 106.3.1 , 1101.6 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
04/18/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
04/18/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
04/21/2022 | ROBERT SHERRY | WATER | REVIEW | Passed | |
04/26/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/27/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |