Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T21CM05762
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/27/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM05762 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: NA BUILDING REVIEW COMMENTS: NA MECHANICAL REVIEW COMMENTS: Denied 1. provide hvac plan of chiller room (IMC2018,106.3.1) 2. Show compliance with chapter 11 of the IMC. (provide equipment data, nameplate, names and types and classifications and quantities refrigerants per circuit and total refrigerant capacity of the chiller room and all equipment in the chiller room in a floor plan (IMC23018,106.3.1) 3. Also provide on the construction documents any new refrigeration equipment that is going to be connected to these chillers, and the type of cooling mediums used if glycol is used the type and quantity of glycol and other water treatment chemicals being used, and provide sds sheets for these chemicals (IMC2018,106.3.1) ELECTRICAL REVIEW COMMENTS Denied 1. Verify existing switch gear and panel for adding new chiller CHL-1, new pumps CHWP-3, CWP-3 and PCWP-4,5 and new cooling tower CT-2. Provide new panel if necessary. Provide conduits with wires as required. New chiller will be shipped with disconnect switch. 2. Install furnished by Daikin (2) VFDs for 2-cell CT-1, and (2) VFDs for PCWP-4,5 as shown on drawings. All VFDs include disconnect switches. 3. Provide wiring for new CHL-1, new CT-2, new pumps CHWP-3, CWP-3 and PCWP-4,5. Provide disconnect switches for CT-2 (outside), CHWP-3, CWP-3 as required PLUMBING REVIEW COMMENTS: Denied 1). Plans need to be signed & sealed by a registered design professional. A106.3.1 2). Backflow preventer type , manufacturer name & model number need to be listed on the plans. see pg. M2R.... A106.3.2 & FPC 608.3 3). Show the continuation of the make up water line to the backflow preventer & any other water pipe routing that is not shown. A106.3.2 |
08/10/2021 | ROBERT SHERRY | WATER | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/11/2021 | VVERA1 | OUT TO CUSTOMER | Completed |