Permit Number: T21CM01719
Parcel: 11515214B

Address:
785 W SAHUARO ST

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T21CM01719
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/10/2021 JPEELDA1 FIRE REVIEW Approved
03/23/2021 ROBERT SHERRY WATER REVIEW Completed
04/01/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
04/01/2021 STEVE SHIELDS ZONING REVIEW Passed
04/05/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM01719

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Denied
1. Drawing G102 Project Description says that “Kitchen Renovation and Dining Room Expansion”. Revise the Description.
2. 2. Provide Geotechnical Report for the proposed building per International Building Code 2018.
3. 3. Structural steel, components and fasteners for the canopy are to be protected against corrosion in accordance with
AISC 360 Section B.13 as indicated in IBC 2018.
4. 4. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using
the hot-dip galvanizing process. Provide for plugs as needed.
AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the
zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel
area to provide protection.

BUILDING REVIEW COMMENTS:
Denied
1. G101 - The adopted codes listed on the cover page are incorrect. The NEC and IFC editions are the incorrect edition.
2. G101 - No code data provided. Provide a thorough general building survey that includes the following: Zoning, Occupancy
class, square footages, building heights, occupant load calculations, means of egress calculations, construction type.
3. A900- The open office sink is required to have knee and toe clearance per 2010 ADA and 2009 ANSI A117. The mill work
prevents approach. Provide all dimensions and details that show compliance.
4. Provide drawings that show that the bathrooms comply with all ADA requirements.

ELECTRICAL REVIEW COMMENTS
Denied
E500B ELECTRICAL PANELS AND RISER DIAGRAM: Do not see New panel outlines on Service Riser diagram

MECHANICAL REVIEW COMMENTS:
Approved

PLUMBING REVIEW COMMENTS:
Denied
1-Provide water heater with automatic temperature control. IPC-501.8
2-Provide Minimum Plumbing Facility Fixtures Calculations. IPC-403.3
04/08/2021 SBLOOD1 ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/09/2021 IMONSHI1 OUT TO CUSTOMER Completed