Address Search: 785 W SAHUARO ST
Search
Parcel Attributes
| Parcel | 11515214B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-2, C-1 |
| Tucson Ward | Ward 3 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 785 W SAHUARO ST
Date - 08/19/2026 8:01 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 785 W SAHUARO ST
Date - 08/19/2026 8:01 a.m.
Total Number Of Permits - (49)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| DP20-0252 | Issued | 12/11/2020 | 03/20/2027 | Development Package | SITE: Pascua Yaqui Tribe - ramps, curbs, pavers. | |
| T21FC00864 | Complete | 11/18/2021 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - Installation of a Buckeye Fire Suppression System for a kitchen hood.; Commercial Cooking Suppression - New System: 1 | |
| T20CM07538 | Expired | 10/30/2020 | 05/04/2021 | 03 | Commercial Building | INTERIOR DEMO FOR BLDG'S 3 AND 4 CULTURAL KITCHEN ANS SENIOR CENTER |
| T20CM07538 | Expired | 10/30/2020 | 05/04/2021 | 04 | Commercial Building | INTERIOR DEMO FOR BLDG'S 3 AND 4 CULTURAL KITCHEN ANS SENIOR CENTER |
| T20CM07489 | Complete | 10/29/2020 | 09/29/2024 | BLDG 3 | Commercial Building | CULTURAL KITCHEN EXPANSION |
| T20CM07490 | Complete | 10/29/2020 | 09/29/2024 | BLDG 4 | Commercial Building | SENIOR CENTER EXPANSION |
| T21CM06388 | Complete | 08/06/2021 | 09/30/2024 | BLDG 3 | Commercial Building | BOOTHS EXPANSION |
| TC-COM-0723-01867 | Expired | 07/31/2023 | 01/27/2024 | BLDG 1 | Commercial Building | New men's restroom building. |
| TC-COM-0723-01868 | Expired | 07/31/2023 | 01/27/2024 | BLDG 5 | Commercial Building | Group restroom and booth building. |
| TR-UTL-0525-00726 | Inspections | 05/01/2025 | 06/14/2025 | Right-of-Way (ROW) - Utility | EXCAVATING A 10X3 TRENCH AT 785 W SAHUARO ST BLDG B TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' SOUTH OF SOUT P/L AND 35' EAST OF WEST P/L | |
| TF-FCP-0323-00518 | Complete | 03/27/2023 | 12/08/2023 | Fire Construction Permit | Provide a fire alarm system to the Education Building. We will be tying into the main panel in Cultural Kitchen. We will be adding a NAC Panel, pull stations, smoke detectors, monitor modules, and notification devices. | |
| T21CM02091 | Expired | 03/09/2021 | 09/05/2021 | 05 | Commercial Building | CHANGE IN DESIGN, APPLICANT WILL START OVER **********NEW BOOTHS AND RESTROOM BUILDING. |
| T21CM02054 | Expired | 03/08/2021 | 11/06/2021 | 01 | Commercial Building | CHANGE IN SCOPE OF WORK. THIS IS NOW A NEW BUILD. NEW PERMIT WILL BE APPLIED FOR*********************RENOVATION OF THE EXISTING PUBLIC RESTROOMS. |
| T22BU00084 | Issued | 03/07/2022 | 12/25/2023 | BLDG 1 | Demolition Permit | Complete demolition of called out building along the north fence of the PTY Old Pascua site. |
| T22FC00160 | Complete | 03/02/2022 | 05/25/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - PASCUA YAQUI TRIBE CULTURAL KITCHEN - New Install - New 4007 panel, wireless dialer, 14 initiating devices, & 13 Notification devices.; Fire Alarm Systems - New Sq Ft: 5950; Fire Alarm Systems - # New Stories: 1 | |
| T21CM01719 | Complete | 02/26/2021 | 08/24/2024 | BLDG 2 | Commercial Building | NEW BUILDING ADDITION ON THE SOUTH SIDE OF THE EXISTING EDUCATION BUILDING. THE USE WILL BE OFFICE. |
| TF-FCP-0123-00323 | Void | 01/24/2023 | N/A | Fire Construction Permit | VOID-ALREADY SUBMITTED PERMIT#TF-FCP-0123-00303-New fire sprinkler system for new addition and renovated are of existing building. | |
| TF-FCP-0123-00303 | Complete | 01/18/2023 | 12/28/2023 | Fire Construction Permit | New fire sprinkler system in new addition and modified are of existing building. | |
| TC-UTL-0123-00040 | Issued | 01/10/2023 | 10/23/2024 | Utilities Permit | Underground Utility Work/ Lines | |
| TR-ROW-0123-00217 | Complete | 01/05/2023 | 06/30/2023 | Right-of-Way (ROW) | Traffic Control plan to be used in conjunction with Lloyd Construction utilities project Closure will be for 2 wks 24hr hard closure, all equipment to be lite and sandbagged. | |
| T02CM03190 | FINAL | 07/03/2002 | 04/21/2004 | COMBO | ADDITION:STORAGE | |
| T03CM01840 | FINAL | 04/15/2003 | 07/24/2004 | COMBO | TI:RECREATION CENTER | |
| T03EX00575 | CLOSED | 06/06/2003 | 08/05/2003 | EXCAV | EXCAV:21 LF HCS REPAIR | |
| T03PL00968 | FINAL | 06/05/2003 | 12/10/2003 | PLUMB | SEWER REPAIR: APA | |
| T04AN00462 | ISSUED | 05/18/2004 | N/A | 01 | ADDRNEW | |
| T04CM01223 | FINAL | 03/16/2004 | 06/26/2005 | COMBO | TI:OFFICE BLDG 2 | |
| T04CM02226 | FINAL | 05/18/2004 | 02/26/2005 | 04 | COMBO | RE-STRUCTURE:ROOF |
| T04CM05075 | FINAL | 11/18/2004 | 07/12/2006 | 01 | COMBO | REPLACE:HEATING/COOLING |
| T04EL00427 | CLOSED | 03/01/2004 | 08/28/2004 | ELECT | UPGRADE: ELECTRIC APA | |
| T05CM02116 | FINAL | 05/11/2005 | 06/02/2006 | 02 | COMBO | TI: RECREATION ROOM IMPROVEMENT |
| T06BU00353 | FINAL | 02/15/2006 | 11/01/2006 | 04 | BUILD | KITCHEN EXHAUST HOOD |
| T06BU00406 | FINAL | 02/23/2006 | 10/25/2006 | BUILD | KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM | |
| T10CM01164 | FINAL | 04/28/2010 | 01/24/2011 | COMBO | NEW SCREEN WALL CONSTRUCTON | |
| T12EX00192 | CLOSED | 05/02/2012 | 07/01/2012 | EXCAV | EXCAVATING A 4' X 4' AREA BEHIND CURB TO REPAIR HC | |
| T15TC00551 | FINAL | 02/13/2015 | N/A | BARRICAD | CIVIC EVENT - 2015 YAQUI EASTER LENTEN CEREMONIES | |
| T17RW01269 | FINAL | 03/20/2017 | 04/16/2017 | ROW | YAQUI EASTER LENTEN CEREMONIES. FRIDAY & SATURDAY EVENT STARTING 03/17 THRU 04/1717. | |
| T18RW01228 | FINAL | 03/13/2018 | 04/15/2018 | ROW | YAQUI EASTER LENTEN CEREMONIES. FRIDAY & SATURDAY EVENT STARTING 03/16 THRU 03/27/2018. | |
| T20BU00560 | FINAL | 12/28/2020 | 08/04/2021 | DEMO | Demo existing cultural kitchen, restrooms and porch | |
| T20CM00996 | FINAL | 02/11/2020 | 08/10/2020 | 04 | COMBO | GAS RECONNECT |
| T20CM07665 | FINAL | 11/05/2020 | 07/26/2021 | COMBO | Interior Demolishing | |
| T20CM07754 | WITHDRWN | 11/06/2020 | N/A | COMBO | commercial kitchen renovation and dining room expansions | |
| T20FO00539 | FINAL | 10/20/2020 | 04/14/2021 | FIREOPER | 1 TENT SET UP DAY 10.16.20 | |
| T20RW05680 | FINAL | 10/16/2020 | 01/27/2021 | ROW | N.787394-1-ALONG W. SAHUARO ST. EAST OF N. FAIRVIEW AVE PLACE AEIRAL CABLE EAST 793' ALONG EXISTING POLE LINE. COME DOWN OFF LAST POLE AND TRENCH 66', PLACE 1 HH AND MAKE 1 SPLICE PIT. | |
| T20RW06399 | FINAL | 12/04/2020 | 01/07/2021 | ROW | (1) 5X5 BELLHOLES IN THE DIRT ON THE EDGE OF PROPERTY (ALONG CALLE MATUS) TO TEMPORARY ABANDON SERVICE FOR GAS This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
| T21FC00600 | FINAL | 07/29/2021 | 01/18/2023 | FIRECONS | NEW FIRE SPRINKLER SYSTEM FOR GROUND UP CONSTRUCTION. | |
| T21RW02732 | FINAL | 06/04/2021 | 07/07/2021 | ROW | (2) 5X5 BELLHOLES IN THE DIRT PARKWAY (CALLE MATUS) TO TEMP ABAND GAS LINES ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| T22RW01509 | FINAL | 04/15/2022 | 06/01/2022 | ROW | TUCSON WATER JOC - FIRE HYDRANT/FIRE SERVICE CONTRACT #171701 INSTALL TWO (2) 6" FIRE PROTECTION SERVICES, ONE 2" WATER SERVICE CONNECTION, AND RELOCATE 2" POTABLE WATER METER. WORK LOCATION IS ON W SAHUARO AND W CALLE MATUS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| T99CM02634 | FINAL | 06/02/1999 | 01/09/2001 | COMBO | REMODEL:KITCHEN & ADDITION:RAMADA | |
| T99CM05255 | FINAL | 11/03/1999 | 06/05/2001 | COMBO | ADDITION:RESTROOM |