Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL
Permit Number - T19CM07159
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/28/2020 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Completed | |
| 01/28/2020 | PMARTIN1 | DESIGN PROFESSIONAL | REVIEW | Needs Review | |
| 11/01/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T19CM07159 - New Building (Residential - Student Housing / Group Dwelling) Building Plan Review (1st Review) Hub on Campus / Related to DP19-0056 934 E. Speedway Blvd. C-1 Zoning (to UC-1 upon DP approval) TRANSMITTAL DATE: November 1, 2019 DUE DATE: November 5, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the un-approved version development package DP19-0056. While the building plans are consistent with the un-approved DP as it relates to the zoning review purview of the building footprint, square footage, site conditions etc., zoning cannot approve the building plans until the 3rd Party and PDSD Commercial Plans reviewers have approved the building plans. In addition, the plans must be approved by the design professional assigned to this project prior to zoning approval. 2. COMMENT: The building heights listed on the building plan package are not consistent with what has been presented in the MG plan package. The building elevation drawings are not consistent with the elevation drawings in the MG plan package. Contact the PDSD Planning staff MG project manager Nick Ross for "possible" requirements to amend the MG package submittal with corrected drawings. 3. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the approved DP. 4. COMMENT: Zoning will approve the building plans once the plans have been approved by the 3rd Party, PDSD Commercial Plan Reviewers and the Design Professional. If you have any questions about this transmittal, Contact David Rivera on Tuesday, Wednesday or Thursday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov |
| 11/05/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | The development package must be approved first. Ensure that primary roof drains don't discharge over sidewalks. |
| 11/07/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 11/12/2019 | MROSS2 | FIRE | REVIEW | Reqs Change | Provide location and specifications for fire pump room. Fire Pump Room shall comply current codes: IFC 913.1 through 913.5 and NFPA 20. Including, power supply, equipment access, lighting, ventilation, drainage. 913.2.2 Circuits supplying fire pumps. Cables used for survivability of circuits supplying fire pumps shall be protected using one of the following methods. 1. Cables shall be listed in accordance with UL 2196 and shall have a fire-resistance rating of not less than 1 hour. 2. Electrical circuit protective systems shall have a fire-resistance rating of not less than 1 hour. 3. Construction having a fire resistance rating of not less than 1 hour. NFPA 20 4.13.2 Equipment access 4.13.2.1.1 Except as provided in 4.13.2.1.1.1 fire pump rooms not directly accessible from the outside shall be accessible through an enclosed passageway from an enclosed stairway or exterior exit. 4.13.2.1.2 The enclosed passageway shall have a fire resistance rating not less than the fire resistance rating of the fire pump room. 4.13.5 Pump rooms shall be provided with emergency lighting 4.13.7 Drainage. 4.13.7.1 Floors shall be pitched for adequate drainage of escaping water away from critical equipment such as the pump, driver, controller, and so forth. 4.13.7.2 The pump room or pump house shall be provided with a floor drain that will discharge to a frost-free location. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/28/2020 | PMARTIN1 | OUT TO CUSTOMER | Completed |