Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM01353
Parcel: 128100570

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T19CM01353
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/12/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Six primary roof drains are still terminating at the building wall over sidewalks (sheets P2.02.A and 2P.02.B). [Initial comment: Sheets P2.02.A, P2.02.B and P2.02.C show primary roof drains terminating at the building wall over sidewalks. The development plans call for the primary roof drains to connect to scuppers under the sidewalks. Coordinate the development plans and the plumbing plans.]
2. The updated roof plan for the forklift (03/AS0.100) does not include a secondary scupper or roof drain. Provide overflow protection for the roof or provide structural calculations to show that the roof is capable of supporting the additional rain load. Reference: Sections 1101.7, 1106.5, and1108.3, IPC 2018.
07/12/2019 ROBERT SHERRY WATER REVIEW Completed
07/12/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The support of significant HVAC equipment to the building structure is not part of the means and methods responsibility of the contractor. Reference: Section 107.2.1, IBC 2018. [Second comment: Comment not resolved. Provide a detail showing how the spring isolators and all-thread rods are connected to the building structure itself.] [Initial comment: Provide structural details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2018.]
07/16/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
07/30/2019 DAVID RIVERA ZONING REVIEW Approved
08/01/2019 LOREN MAKUS ENGINEERING REVIEW Approved