Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-81-SP-1 | Williams Addition PAD | PAD-1 | Effectuated | 07/17/2012 | S WILLIAMS |
Permits
Parcel Number - 128100570
Date - 11/05/2024 12:28 p.m.
Total Number Of Permits - (30)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP19-0015 | Complete | 01/22/2019 | 10/03/2022 | Development Package | GRADING/SWPPP - TEXAS INSTRUMENTS TUCSON | |
TC-COM-0423-01003 | Complete | 04/07/2023 | 03/10/2024 | Commercial Building | TI: Texas Instruments | |
T21OT00367 | Expired | 05/11/2021 | 11/16/2021 | Sign - Permanent | 4 access point signs | |
TF-FCP-0623-00728 | Complete | 06/02/2023 | N/A | Fire Construction Permit | Add/Relocate Approximately 25 sprinkler heads in three different areas of the building. | |
TF-FCP-0623-00733 | Void | 06/05/2023 | N/A | Fire Construction Permit | VOID-SUBMITTED PERMIT#TF-FCP-0623-00728-Add/Relocate Approximately 25 sprinkler heads in three different areas of the building. | |
TC-CFO-0623-00082 | Denied | 06/09/2023 | N/A | Certificate of Occupancy | This project will need the okay for TCO from inspectors in the building, fire and engineering, and the TCO level. Please re-request once you get the okay for TCO from inspectors -Texas Instruments Seat Expansion Project - phased turnover of four (4) separate interior renovation areas. This TCO request is for Area 1 (Lvl 1 Yoga Room). Additional turnover areas are listed below with dates: Area 2 (Lvl 1 West) - Anticipated Turnover on 8/15/23 Area 3 & Area 4 (Lvl 2 & 3 East) - Anticipated Turnover on 9/7/23 SF & Valuation are for Overall Project. | |
TF-FCP-0623-00758 | Complete | 06/14/2023 | N/A | Fire Construction Permit | Relocate 6 horn strobes horizontally on the same wall. All devices moving within' 4-5' of existing locations. Coverage not changed. 2 on 1st floor 2 on 2nd floor 2 on 3rd floor | |
D00-0041 | Approved | 07/25/2000 | N/A | Development Package | WILLIAMS CENTRE TECHNICAL CAMPUS | |
T19CM07574 | Expired | 10/15/2019 | 09/07/2020 | Commercial Building | E - CONSTRUCTION POWER SERVICE AND SYSTEM | |
DP18-0301 | Complete | 12/13/2018 | 10/09/2021 | Development Package | E SITE/GRADING/SWPPP - Texas Instruments.1st revision is PENDING, March 2020 (sheets 1,3,4,5,6 | |
T00AN00826 | Issued | 10/13/2000 | N/A | ADDRNEW | ||
T00CM05106 | Final | 10/13/2000 | 03/30/2002 | COMBO | SHELL BUILDING | |
T00CM05107 | Withdrwn | 10/13/2000 | 10/08/2001 | COMBO | SHELL BUILDING | |
T00CM05108 | Expired | 10/13/2000 | 05/06/2001 | COMBO | SHELL BUILDING | |
T00CM05109 | Final | 10/13/2000 | 04/09/2002 | COMBO | SHELL BUILDING | |
T01EX00238 | Closed | 02/23/2001 | 04/24/2001 | EXCAV | EXCAV:236 LF SIDEWALK/CURB ACCESS | |
T15EX00403 | Closed | 03/25/2015 | 05/24/2015 | EXCAV | (2) 5' x 5' IN BLKTOP STREET WORK ORDER # RB026000 | |
T19CM01353 | C of o | 02/25/2019 | 10/10/2021 | COMBO | OFFICE BUILDING | |
T19CM02277 | Expired | 04/02/2019 | 10/06/2020 | COMBO | FOUNDATION AND SHELL BLDG STRUCTURE ONLY | |
T19FC00999 | Withdrwn | 11/25/2019 | 01/06/2022 | FIRECONS | Fire Alarm | |
T19RW02400 | Final | 04/30/2019 | 06/30/2019 | ROW | JOB WILL REQUIRE ACCESS TO MH #9453 AND MH #8321 TO SPLICE FIBER. ADDRESS ON APPLICATION: 5411 E WILLIAMS BL | |
T20CM03279 | Final | 05/29/2020 | 09/08/2021 | COMBO | PARKING CANOPY STRUCTURE | |
T20FC00137 | Final | 02/27/2020 | 04/16/2021 | FIRECONS | NEW FIRE ALARM SYSTEM | |
T20FC00806 | Final | 12/02/2020 | 09/26/2021 | FIRECONS | BDA DAS System | |
T20RW02439 | Final | 04/29/2020 | 07/30/2020 | ROW | N.721462 - Job will require access to MH #8321 to splice and place fiber. | |
T20RW03245 | Final | 06/08/2020 | 07/10/2020 | ROW | (2) 5X5 bellholes in front dirt to repair/replace gas line | |
T20RW03489 | Final | 06/18/2020 | 11/24/2020 | ROW | INSTALLATION OF APPROX. 425' OF SIDEWALK, 3 ENTRANCES AND LANDSCAPING ON EAST SIDE OF WILLIAMS BLVD. NOTE: THE MEDIAN OPENING WILL HAVE TO BE CONSTRUCTED UNDER A PIA PERMIT. SYSTEM GLITCH - R2 EXPIRES ON 10/25/20 - DU | |
T20RW06572 | Final | 12/21/2020 | 03/28/2021 | ROW | N.812033- ALONG S. WILLIAMS BLVD SOUTH OF E. WILLIAMS CIR ACCESS MH 8321 TO SPLICE EXISTING CABLE. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. | |
T21RW00732 | Final | 02/16/2021 | 09/16/2021 | ROW | N.831683-1- ALONG S. WILLIAMS BLVD ACCESS EXISTING MH 8321 TO SPLICE AND PLACE NEW CABLE IN EXISTING DUCT. ADDRESS ON APPLICATION: 5210 E WILLIAMS CIR | |
T21RW00733 | Final | 02/16/2021 | 09/16/2021 | ROW | N.831683-2- ALONG S. WILLIAMS BLVD ACCESS EXISTING MH 9453 TO SPLICE EXISTING CABLE. ADDRESS ON APPLICATION: 5210 E WILLIAMS CIR |
Plans
Parcel Number - 128100570
Date - 11/05/2024 12:28 p.m.
Total Number Of Plans - 3
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-18-0301 | Active | 12/13/2018 | 10/09/2021 | Basin | E SITE/GRADING/SWPPP - Texas Instruments.1st revision is PENDING, March 2020 (sheets 1,3,4,5,6 | |
T19BA00013 | Approved | 06/21/2019 | N/A | Basin | Basin for DP18-0301 | |
T19PI00010 | Needs resubmittal | 03/21/2019 | N/A | Private Improvement Agreement | TEXAS INSTRUMENTS - WILLIAMS BOULEVARD |