Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T19CM01353
Parcel: 128100570

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T19CM01353
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/07/2019 MARTIN BROWN FIRE REVIEW Reqs Change Please provide a Hazardous Material Inventory Statement.
A line on P3.01.C is labeled MPG. What does MPG stand for? (not on list of abbreviation) Where does this line terminate?
Please clearly indicate on floor plan location of fire rated chemical storage cabinets.
Are there any bottles of compressed gas in the building? If so, please indicate location, quantities, and method of storage.
Be advised that fire alarm drawings are a deferred submittal though the fire department.
A separate permit will be required for the installation of the liquid nitrogen tank.
03/13/2019 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G0.002; Finish Notes: Note H is not legible. Please revise.
2. Sheet G1.001; Building Area Table (Exiting Level 1); Door Egress Width: In the Building Area Table, the Exiting Level 1 indicates 815 occupants. The Door Egress Width indicates 1164 occupants total for Exits 1A through 1M. Please coordinate these occupant loads.
3. Sheet G1.001 (Door Egress Width); Sheet G1.002 (Exiting Level 2): The Exiting Level 2 indicates 533 occupants. The Door Egress Width indicates 356 occupants total for Exits 2E and 2W. Please coordinate these occupant loads.
4. Sheet G1.001 (Door Egress Width); Sheet G1.002 (Exiting Level 3): The Exiting Level 3 indicates 485 occupants. The Door Egress Width indicates 324 occupants total for Exits 3E and 3W. Please coordinate these occupant loads.
5. Sheet G1.001; Plumbing Fixture Calculations: Please verify the number of provided water closets, lavatories, and drinking fountains indicated on this sheet.
6. Sheet G1.002; Life Safety Plan 01: The longest path of travel indicates 283 feet. Since the exit egress stair on the east end of the building is not in a rated enclosure, the travel distance should be measured from the beginning designation (Sheet G1.002) to the bottom of the stair. Please verify the travel distance is correct and indicate it on the plan.
7. Sheet G1.002; Life Safety Plan 02: The longest path of travel indicates 294 feet. It appears the exit egress stair on the east end of the building is in a rated enclosure from the second floor to the roof. Please verify the travel distance is correct and indicate it on the plan.
8. Sheet AS0.001; Sheet Notes: Note 4 was not located on the site plan. Please verify.
9. Sheet AS0.100; Trash Enclosure Elevation 02: Please provide structural calculations for the trash enclosure wall and foundation design. Provide details as required.
10. Sheet AS0.100; Generator Elevation 05: Please provide structural calculations for the generator enclosure wall and foundation design. Provide details as required.
11. Sheet A1.101; Construction Plan: Please indicate on the drawings the hazardous materials and their quantities used/tested/stored in this facility. Verify the requirements for control areas per the IBC Tables 307.1(1) and 307.1(2) are met.
12. Sheet A1.101; Construction Plan: Please verify on the drawings the requirements of the IBC Section 414 for hazardous materials are met.
13. Sheet A1.101 (Plan Level 01B); Sheet G1.001 (Life Safety Plan Level 01): Per the IBC Section 1028.1, it does not appear the stair at the café area meets the Exception 1.1 for exit discharge. Please verify.
14. Sheet A1.101.C; Construction Plan: The south and west walls of the maintenance room indicate rated walls, while the north and east walls do not. Please verify.
15. Sheet A1.102.A; Construction Plan: Please provide a room name for the space above phone rooms 226 and 227. Are these shaft enclosure walls? If so, the IBC Section 713 requires a one hour rated fire barrier (707). Sheets A4.200 and A4.300 do not indicate rated walls. Please verify.
16. Sheet A1.102.B; Construction Plan: Please provide a room name for the space east of phone rooms 231A and 2231B. Are these shaft enclosure walls? If so, the IBC Section 713 requires a one hour rated fire barrier (707). Sheets A4.200 and A4.300 do not indicate rated walls. Please verify.
17. Sheet A1.103.A; Construction Plan: Please provide a room name for the space above phone rooms 325 and 326. Are these shaft enclosure walls? If so, the IBC Section 713 requires a one hour rated fire barrier (707). Sheets A4.200 and A4.300 do not indicate rated walls. Please verify.
18. Sheet A1.103.B; Construction Plan: Please provide a room name for the space west of the print/copy/storage room 330. Are these shaft enclosure walls? If so, the IBC Section 713 requires a one hour rated fire barrier (707). Sheets A4.200 and A4.300 do not indicate rated walls. Please verify.
19. Sheet A2.100: Please insert this sheet in the correct location per the Drawing Index.
20. Sheet A3.102; Building Section 02: Please indicate room names and numbers on this section.
21. Sheet A3.301 (Section 08); Sheet A6.101: A Detail 02/A6.101 at the north curtain wall is referenced on this section. That detail was not indicated on Sheet A6.101. Please verify.
22. Sheet A6.001; Partition Types: For all fire resistance rated walls and partitions, please indicate on this sheet a U.L. listing number, or add a reference note locating that information.
23. Sheet A6.002; Interior Doors: For all doors in fire resistance rated walls and partitions, please indicate on this sheet a U.L. listing number, or add a reference note locating that information.
24. Sheet A6.104 (Section 01); Sheet A6.110 (Detail 04): Is Detail 04 correct for the location shown on Section 01? Please verify.
25. Sheet A6.105: Signage requires a separate permit.
26. Sheet A7.005 (Plan Level 02); Sheet A6.000 (Typical Assemblies): The stair plan indicates a Wall W03. That wall was not indicated on Sheet A6.000. Please verify.
27. General; All Floor Plans: It appears there are walls and partitions on all floor plans that are not identified on Sheets A6.000 or A6.001. Please verify and provide or reference all walls.
28. Sheet S0.01 (Foundations); Geotechnical Report (Page 12): The foundations note indicates the bottom of the footing to be a minimum of 1'-6" below finish grade. The geotechnical report indicates the 18" minimum embedment below finish grade is for at grade service structures only, and the allowable soil bearing pressure for that condition would be 2000 PSF. The geotechnical report indicates braced frames would require 48" minimum embedment below finish grade, and the allowable soil bearing pressure for that condition would be 4000 PSF. The geotechnical report indicates isolated footings would require 24" minimum embedment below finish grade, and the allowable soil bearing pressure for that condition would be per Appendix C of the report. Please coordinate the general structural notes with the geotechnical report.
29. Sheet S1.102.B (Framing Plan); Structural Calculations (Beam B29): The calculations indicate the beam size is W24x68, while the framing plan indicates the beam size is W24x55. Please coordinate.
30. Sheet S1.104.B (Framing Plan); Structural Calculations (Beam RB7): The calculations indicate the beam size is W24x55, while the framing plan indicates the beam size is W16x31. Please coordinate.
31. Structural Calculations; Column C3: The column size indicates "OK by comparison". What comparison is being used? Please clarify.
32. Structural Calculations; Column C4: The column size indicates "OK by comparison". What comparison is being used? Please clarify.
33. General: Please provide the Special Inspection Certificate, located on the City of Tucson website, with Parts A and B completed.
34. General: Please provide written responses to all review comments.

Reviewed by Eric Newcomb
Contact at 520-837-4911 or Eric.Newcomb@tucsonaz.gov
04/01/2019 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Section Manager

PROJECT: Texas Instruments
T19CM01353
Building Plan (1st Review)

TRANSMITTAL DATE: April 1, 2019

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. The building plans have been reviewed for compliance with development package DP18-0301 and although it appears that the building plans match the development package Zoning cannot approve the building plans until the development package has been approved.

3. Until all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
04/01/2019 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Provide complete compliance with the 2018 IECC for lighting. If utilizing ASHRAE for energy conservation, please include the requirements for power in section 8 of ASHRAE requiring automatic controls for 50% of the receptacles. Sec 8.4.2.
2. Ref; 2012 Tucson/Pima County Outdoor Lighting Code.
(a) Verify on the plans that the light sources color temperatures do not exceed 3500K per sec 402.1.
(b) Provide details for the Outdoor Lighting Controls required in section 403.1 thru 403.5.2.
3. Ref; Line Diagrams/Feeders. Indicate whether utilizing copper or aluminum conductors for the feeders shown on the line diagrams. If utilizing copper or aluminum is optional, provide sizes required for both types of feeders shown in the feeder schedules. NEC art 310.15
4. Provide for Tamper Resistant Receptacles in applicable areas as required per art 406.12
Code Ref; 2018 IECC/ASHREA, 2017 NEC, 2018 IBC sec 107.2.1.
04/04/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. A lined water heater with a heat input in excess of 200,000 BTU per hour is considered a boiler and shall be installed in compliance with Section R20-5-404. (Standards for Boilers, Lined Hot Water Heaters and Pressure Vessels) of the Arizona Administrative Code. Reference: Article 4, Section R20-5-401, Arizona Administrative Code. http://apps.azsos.gov/public_services/Title_20/20-05.pdf
2. Provide automatic faucets for the lavatories in the public restrooms, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucets will operate for a minimum time of 10-seconds for accessibility. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
3. A note on P2.03.C states that the roof of the central utility plant will be drained with scuppers. The architectural drawings seem to be lacking any information regarding scuppers. Where are they shown? Reference: Section 107.2.1, IBC 2018.
04/04/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP18-0301 must be approved first.
04/04/2019 ROBERT SHERRY WATER REVIEW Reqs Change 1. The civil utility plan indicates the installation of a 2" water meter to serve the building water demand. Based on the water fixture units shown in Appendix E, IPC 2018, the water demand for the building will be about 137 GPM without considering the continuous demand from hose bibbs, make-up water for mechanical systems, and deionized water production. Tucson Water limits 2" water meters to a maximum demand of 120 GPM. Verify the total water demand for the building (including the demand contribution of non-plumbing uses) and revise the size of the water meter if needed.
2. The civil utility plan shows a 3" domestic water line terminating at the garbage area with a 1" domestic water line serving the building. Correct the civil plan to coordinate with the plumbing site plan.
04/08/2019 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide structural details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2018.
2. Provide calculations to show how adequate ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2018.
3. Cooking appliances that do not require the installation of a Type II hood (e.g. microwave ovens) shall be exhausted at a flow rate of 0.70 CFM per square foot; each appliance shall be assumed to occupy a space of not less than 100-square feet. Reference: Section 507.3, IMC 2012.
4. Exhaust for microwaves shall terminate outdoors, not in a return air plenum. Reference: Section501.3, IMC 2012.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/22/2019 AMARTIN1 OUT TO CUSTOMER Completed