Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T19CM01193
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/19/2019 | GPERU1 | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide written responses to all plan review comments: 1. Provide available arc fault current calculations and documentation for all new electrical service equipment. Show panel bracing requirements for new service panels. NEC 110.24 2. Provide maintenance outlet(s) for mechanical equipment at roof top locations and condensers. 3. Provide an electrical legent of all sysbols and abbreviations used on the electrical plan. IBC 107.2.1 |
02/19/2019 | GPERU1 | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide written responses to all plan review comments. 1. Please indicate all existing and new equipment covered under the scope of the permit. 2. M-1 For new field coil units, load calculations shall be required for proper sizing of all equipment. Heating and cooling system design loads for sizing systems, appliances and equipment shall be determined in accordance with ASHRAE/ACCA Standard 183. 3. Cite all applicable and adopted codes for the basis of design for all mechanical and electrical equipment. IBC 107.2.1 4. Mechanical systems shall be designed to comply with Sections C403.2.1 and C403.2.2. Show compliance with the Mandatory system design requirements of the 2018 IECC. 5. Provide the building occupancy classifications, type of construction and occupant loads for all rooms, areas or spaces that will be serviced by new mechanical systems. 6. Identify the drain termination fixture for the condensate drain pipe. IPC 307.2.1 7. Provide the UL listed assembly for the penetrations in the mechanical room wall. Specify the fire resistive rating for the wall assembly. IBC 107.2.1 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/06/2019 | QJONES1 | APPROVAL SHELF | Completed |
03/06/2019 | QJONES1 | OUT TO CUSTOMER | Completed |
03/06/2019 | QJONES1 | REJECT SHELF | Completed |