Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL TI
Permit Number - T18CM09798
Review Name: 3RD PARTY REVIEW - COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/08/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | Per M. Ashford, 12/20/18 |
| 01/14/2019 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size of the water meter for this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2012. |
| 01/16/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T18CM09798 - Civic/Education Use - Salpointe High School Building Plan Review (1st Review) - Related to DP18-0282 1545 E. Copper Street - PAD 17 Zoning TRANSMITTAL DATE: January 16, 2018 DUE DATE: January 17, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the Building plans for compliance with the unapproved version of the development package. While the building footprint and the site revisions are consistent with the unapproved version of the DP as it relates to the zoning review purview (Building footprint, Height, square footage, site conditions etc.) zoning cannot approve the building plans until the 3rd Party Commercial Plans Reviewers have approved the building plans. 2. COMMENT: If available, include a reference copy of the PDSD approved and signed version of the DP with the next submittal of the building plans package. 3. COMMENT: Zoning will review the building plans on the next submittal to assure that any revisions made to the building plans do not affect zoning requirements and the 3rd Party Commercial Plans Reviewers have also approved the building plans. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: as noted above |
| 01/22/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | 1) Once the DP has been approved and any outstanding commercial review comments have been addressed, Engineering can conduct an over the counter review of the building plans. Call or Email to Schedule 2) Coordinate with Development Package (DP) to ensure that roof drains scupper underneath sidewalks. Reference City of Tucson Technical Standards Manual (TSM) section 7-01.4.1.E John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
| 01/25/2019 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/25/2019 | KROBLES1 | OUT TO CUSTOMER | Completed |