Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL
Permit Number - T17CM00366
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/03/2017 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
02/08/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Clarify the water service to the building. Sheet P1.1.1 shows a 2" meter with a 3" RP and a 1-1/2" meter with a 2-1/2" water meter. Sheet P2.1, however, calls out a 3" water meter with a 4" RP serving floors 4, 5, 6, and 7; and a 1-1/2" meter with a 2-1/2" RP serving floors 1, 2, and 3. |
02/09/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principle Planner PROJECT: Marist on Cathedral Square T17CM00366 Building Plan (1st Review) TRANSMITTAL DATE: February 9, 2017 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Until development package DP15-0196 is fully approved the building plans cannot be approved. 3. The development package sheets provided in the building plan set either need to be the approved development package sheets or each sheet marked for reference only or removed from the plan set. 4. It appears that there are shade canopies that encroach into the right of way along Church Avenue. Some type of easement or agreement is required for this encroachment. Contact COT Real Estate to secure the easement or agreement. The easement or agreement will need to be secured prior to approval of the building plans. 5. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
02/09/2017 | SSHIELD1 | ZONING HC | REVIEW | Passed | |
02/15/2017 | KLEE1 | DESIGN PROFESSIONAL | REVIEW | Approved | DATE: 2/13/17 FROM: Rick Gonzalez, Architect, City of Tucson On-Call Design Professional TO: Carolyn Laurie, Planning and Development Services Department RE: Design Professional Elevation review comments for Marist College IID-15-11 The following review comments are provided with regard to the elevation changes made on the Approved Design Package submitted to PDSD on October 2016. The Design Professional is recommending approval the currently submitted revised renderings (1275 Marist Midrise - 20170207 Perspective Views - four pages). 1. Exterior NW Corner; upper level at entry corner - fenestration increased from approved design. Positive revision, add to approved design package. 2. Exterior SW Corner perspective varies from |
02/21/2017 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Approved | |
02/21/2017 | FRODRIG2 | WWM | REVIEW | Needs Review | |
02/21/2017 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/21/2017 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |