Parcel Attributes
Parcel11720015C
11720015B
11720015A
JurisdictionTucson
City of Tucson ZoningOCR-2, C-3
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District, Downtown Core
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodDowntown
Major Streets & Routes

Gateway Route

RedevelopmentDowntown Redevelopment District
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 111 S CHURCH AV
Date - 09/21/2024 2:45 a.m.
Total Number Of Historic Records Requests - (1)
Name Action
Address: 111 S CHURCH AV - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 111 S CHURCH AV
Date - 09/21/2024 2:45 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Special Development Requests & Requirements

Address: 111 S CHURCH AV
Date - 09/21/2024 2:45 a.m.
Total Number Of Special Development Permits - (5)
Activity Number Status Apply Date Expired Date Unit Type Description
H000000068 CLOSED 02/06/2008 N/A Historical Information
T14SA00157 APPROVED 05/29/2014 N/A Design Review Board
T15SA00424 APPROVED 12/15/2015 N/A Overlay Zone
T17SA00059 COMPLETE 02/14/2017 N/A Zoning Adminstration Letter
T19SA00267 COMPLETE 07/01/2019 N/A Zoning Adminstration Letter zoning letter

Permits

Address: 111 S CHURCH AV
Date - 09/21/2024 2:45 a.m.
Total Number Of Permits - (38)
Permit Status Apply Date Expired Date Unit Type Description
DP15-0196 Complete 11/09/2015 06/16/2019 Development Package SITE/IID - THE MARIST ON CATHEDRAL SQUAREOriginal Approval 2/15/2017 (15 pages)1st Revision ap
T19RW06836 Complete 11/06/2019 N/A Right-of-Way (ROW) Measuring a groundwater monitoring well (10 minutes). (MW-PD-44)
TR-ROW-0623-00886 Issued 06/20/2023 08/12/2023 Right-of-Way (ROW) Monitor well abandonment. 12"x12" saw cut to remove vault in Church Ave, then repair roadway according to PAG Type 1 street repair
DP14-0071 Complete 05/07/2014 11/07/2020 Development Package SITE - ROMAN CATHOLIC DIOCESE
TR-ROW-0324-00349 Issued 03/29/2024 10/09/2024 Right-of-Way (ROW) Each of those locations has a utility box within the ROW (I chose the addresses as close to the utility boxes as possible). The Arts Foundation is working with DTM and Rio Nuevo to wrap these in artist designed vinyl. We are looking to secure permits to allow for the installation at each location. Art work project work to Occur in Multiple locations (corners) within Downtown area. Request Update 7/9/2024: Renewal request 90 days as of 7/11/2024.
T01BU02517 CLOSED 08/29/2001 02/25/2002 BUILD DEMO:INTERIOR
T01BU03170 FINAL 11/07/2001 08/25/2002 SPKLR FIRE SPKR:ADD 190
T01CM03877 C OF O 08/08/2001 08/31/2002 COMBO TI:OFFICE
T02EL00491 FINAL 03/08/2002 09/09/2002 ELECT REPAIR:ELECTRIC FOR ROOFTOP A/C UNITS/T02VL00406
T02OT00358 FINAL 03/08/2002 10/02/2002 SIGN SIGN:3734
T02OT00739 FINAL 05/14/2002 02/08/2003 SIGN SIGN:3994
T11EX00629 CLOSED 12/22/2011 02/20/2012 EXCAV TRENCH, BORE, REPAIR FOR 150LF CONDUIT INSTALLATION ALONG THE NORTH SIDE OF W. JACKSON ST @ CHURCH AVE.
T13BU00436 FINAL 04/10/2013 10/22/2013 SPKLR ADD 3 SPRINKLERS
T14BU00728 FINAL 06/27/2014 05/02/2015 SPKLR FIRE SPRINKLER-ADD 4 NEW
T14CM02600 EXPIRED 05/06/2014 05/04/2015 COMBO TI: INTERIOR DEMO; CHURCH
T16CM08767 WITHDRWN 11/21/2016 N/A COMBO NEW MULTI FAMILY HOUSING MID-RISE AND PARKING
T16RW02115 FINAL 10/19/2016 11/22/2016 ROW INSTALL / REMOVAL OF TENWEST BANNERS ON 6 LIGHT POLES ALONG BROADWAY BLVD AS WELL AS ALONG CONGRESS STREET BETWEEN CHURCH AVENUE AND TOOLE AVENUE TRACK ACCESS PERMIT REQUIRED.
T17BU00020 WITHDRWN 01/17/2017 N/A DEMO COMM BLDG COMPLETE DEMO
T17BU00188 FINAL 04/25/2017 04/01/2018 DEMO BLDG DEMO
T17CM00366 C OF O 01/17/2017 06/18/2019 COMBO NEW 7 STORY HOUSING WITH PRKING GARAGE AND COMMUNITY SPACE
T17CM04762 FINAL 06/20/2017 05/14/2019 COMBO TEMP CONSTRUCTION TRAILER
T17FC00755 FINAL 09/14/2017 06/11/2019 FIRECONS INSTALL NEW FIRE ALARM SYSTEM
T17FC00793 FINAL 09/28/2017 06/11/2019 FIRECONS NEW FIRE SPRINKLER SYSTEM (ADD 1185 SPRINKLERS)
T17RW01406 EXPIRED 03/28/2017 04/29/2017 ROW TEP to access an existing UG Vault for visual inspection. Work will begin at approx 5:30am on 3/30 and last approx 30-45 mins. Traffic Control will be required.
T17RW01417 FINAL 03/29/2017 04/01/2017 ROW TO CLOSE JACKSON AV TO REMOVE AN EXISTING TRANSFORMER AND CABLE, WORK WILL BEGIN AT APPROX. 11PM ON 03/30 AND WILL BE COMPLETE AT APPROX. 4AM ON 3/31
T17RW01742 FINAL 04/24/2017 11/07/2018 ROW Building Demo and Foundation for Senior Housing / La Placita Redevelopment / Parking Garage 9/6/17 DATE CHANGE TO 9/12/17 TO CLOSE LANE ON CHURCH TO LAY BOOM DOWN AND CHANGE BOOM LINE 12/21/17 WORK DESCRIPTION CHANGE: ADDING NEW UNDERGROUND TEP CONDUIT TO CONNECT TO EXISTING VAULT
T17RW01903 VOID 05/03/2017 N/A ROW 111 S CHURCH AV BUILDING DEMO AND FOUNDATION FOR SENIOR HOUSING /LA PLACITA REDEVELOPEMENT /PARKING GARAGE
T17RW04635 FINAL 10/19/2017 11/13/2018 ROW SIDEWALK WORK ON BROADWAY BL AND CHURCH AV S/E CORNER 120' WORK AREA
T17RW04699 FINAL 10/23/2017 11/03/2017 ROW EMERGENCY- "AFTER THE FACT" PERMIT 4 LF INTERSECTION S. CHURCH AVE ON W. JACKSON ST ASPHALT REPAIR LEAKING MAIN
T17RW05003 FINAL 11/08/2017 12/13/2017 ROW MEASURE A GROUNDWATER MONITORING WELL (10 MINUTES)
T18FC00234 FINAL 03/21/2018 01/23/2019 FIRECONS 14' of underground fire sprinkler line
T18OT00991 FINAL 09/13/2018 07/07/2019 SIGN 1-NON ILLUM WALL SIGN
T18RW01447 FINAL 03/28/2018 10/29/2018 ROW TEP will be installing new underground feeder cable, a pad mount switchgear, and a pad mount transformer for the Marist Mid Rise on the NE corner of Jackson & Church. The pullbox is located in the northbound lanes of Church. The pad mount equipment will be along the north edge of Jackson. An after hours outage will be required for this work to avoid customer interruptions. Adam Myers - will be pulling through existing facilities. ** PEDESTRIAN BRIDGE IS SCHEDULED TO BE DEMOLISHED ON 05/04/18 - 05/06/18. **
T18RW04149 FINAL 09/17/2018 11/18/2018 ROW Start Point: On the South side on 111 N Church Ave, relocate existing vault , 8' trench/bore South , to be placed on sidewalk
T19OT00542 FINAL 06/14/2019 03/21/2020 SIGN 2- ILLUM WALL SIGNS
T19RW06821 FINAL 11/06/2019 11/28/2019 ROW Measure a groundwater well (10 minutes). (MW-PD-44) NOTES: HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020.
T20RW06211 VOID 11/17/2020 N/A ROW GAUGE A GROUNDWATER MONITORING WELL. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS.
T97BU02216 FINAL 10/29/1997 11/04/1998 SPKLR FIRE SPKR:ADD 224

Plans

Address: 111 S CHURCH AV
Date - 09/21/2024 2:45 a.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
T15PRE0089 PLAN CK 10/20/2015 N/A NEIGHBORHOOD NOTIFICATION -- LABELS
T16PRE0068 PLAN CK 09/09/2016 N/A NEIGHBORHOOD NOTIFICATION -- LABELS

Record Requests

Address: 111 S CHURCH AV
Date - 09/21/2024 2:45 a.m.
Total Number Of Requests - (2)
Request Number Status Request Date Completed Date Type Description
REQ-0624-04593 Denied 06/27/2024 N/A Requests ** DENIED- NO PRE-ACTIVITY MEETING SCHEDULED/ HELD VIA DASHBOARD** Due to weather restrictions the work could not be completed within the initial 30 day permit timeframe. I am requesting a 90 day extension so that the work can be completed when temperatures are 85 degrees or cooler.
REQ-0724-04751 Approved 07/08/2024 07/09/2024 Requests The work could not be complete under extreme heat. We are requesting to extend the permit 90 days. We have a pre-activity meeting scheduled for July 11 at 10:32am.