Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - T16CM02176
Review Name: REVISION - - 2ND
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/15/2016 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 12/01/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 12/05/2016 | STANTEC | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Electrical Review by Russ Cox T16CM02176 1. Sheet E0.0.1 - 1. The plans are noted as "Incomplete" due to insufficient information. Once all required information is made available, additional comments may be necessary in order to complete this review. The panel schedules do not correlate with the one lines or the floor plans. The panel schedules are not clear and specific as to what item and areas are supplied power by what circuit and must comply with NEC 408.4 to verify code compliance with all parts of the National Electric Code. 2. Sheet E1.4.1 - Clarify why some feeders are dashed lines and some are solid lines. 3. Sheet E1.4.1 - Please clearly identify all work for this project from all existing work. Other than the term existing by some equipment it is impossible to distinguish. Please clarify. (typical all) 4. Sheet E1.4.1 - Provide compliance with NEC 250.24(D) at the Fire Pump ATS/Controller. 5. Sheet E1.4.1 - This grounded conductor for the Fire Pump ATS/Controller does not comply with NEC 250.24(C)(1). 6. Sheet E1.4.2 - Clearly show all this equipment, conduit routing, and bus duct on the floor plan. (typical all) 7. Sheet E1.4.2 - Identify all existing and new work for this project. Please clarify. (typical all) 8. Sheet E1.4.2 - Provide compliance with NEC 700.10(D) for the conduit runs and the bus duct routing. 9. Sheet E1.4.2 - Show all feeder sizes for new or revised work for this project. (typical all) 10. Sheet E1.4.2 - This feeder for ATS-38 does not match sheet E1.4.1. Please clarify. 11. Sheet E1.4.3 - Is this a spare disconnect/breaker on riser 4NAAH-BD on the 10th floor? Please clarify. 12. Sheet E1.4.3 - Provide conductor and conduit sizes for all feeders. See feeder for 4NBAL-D1. Please clarify. 13. Sheet E1.4.4 - Are these lines for 9CABL-D1 supposed to be solid or dashed? Provide feeder sizes. Please clarify. 14. Sheet E1.4.4 - Provide compliance with NEC 517.14 for all panelboards serving patient care areas. (typical all) 15. Sheet E1.4.4 - Provide compliance with NEC 700.10(D)(3) for all generator control wiring for life safety and critical branch ATS. (typical all) 16. Sheet E1.4.4 - Provide overcurrent protection device sizes for 9CABL-D1, 9CABH1, 9CABL1, & 9CABL2. 17. Sheet E1.4.6 - Verify the lugs on the VFD's will accommodate 2 sets of #350 conductors. (typical all) 18. Sheet E1.4.7 - Please verify the VFD lugs will accommodate the feeder conductors specified. (typical all) 19. Sheet E1.4.8 - The transformer is identified as T-4UABL2 on the floor plan. Please clarify. 20. Sheet E2.0.1 - Please clarify and clearly identify all new work to verify code compliance. 21. Sheet E2.0.1 - Provide panel and circuit identification and conduit and conductor sizes for all added or re-circuited lights. (typical all) 22. Sheet E2.0.2 - Please see correction comments on sheet E2.0.1. 23. Sheet E2.0.4 - Please see correction comments on sheet E2.0.1. 24. Sheet E3.1.1 - Please clarify. Are the two stairwell fixtures the only work in this area? 25. Sheet E3.1.1 - Provide panel and circuit identification for all circuits to verify code compliance. (typical all) 26. Sheet E3.1.2 - Are these lights fed from Panel 9SABH1 or 1SABH1? Please clarify. 27. Sheet E3.1.2 - Please provide panel identification in the appropriate key notes. 28. Sheet E3.1.2 - Provide a circuit and the switch location for each elevator pit as required by NEC 620.24. 29. Sheet E3.1.2 - Provide the panel identification for all lighting circuits shown. 30. Sheet E3.1.3 - Please provide the panel designation in the key notes for all circuits shown. 31. Sheet E3.1.4 - Please provide the panel designation in the key notes for all circuits shown. 32. Sheet E3.1.4 - Provide panel and circuit identification for all lighting shown. 33. Sheet E3.2.1 - Add these panels to the appropriate notes. Please clarify. (typical all) 34. Sheet E3.2.1 - Egress lighting shall be from the life safety panel. NEC 517.42 (typical all) 35. Sheet E3.2.1 - Provide the panel and circuit identification for the exit lights. (typical all) 36. Duplicate sheet E3.2.1 37. Sheet E3.2.2 - Add the panel designations shown to the appropriate notes. (typical all) 38. Sheet E3.2.2 - Provide panel and circuit identification for all exit sign circuits. (typical all) 39. Sheet E3.2.3 - Please provide the panel designation for all lighting circuits shown. (typical all) 40. Sheet E3.2.3 - Egress lighting shall be from the life safety panel. NEC 517.42 and these lights do not meet the criteria of NEC 517.43(A). (typical all) 41. Sheet E3.2.4 - Please provide the panel designation for all lighting circuits shown. (typical all) 42. Sheet E3.2.4 - Please provide exit sign circuits. (typical all) 43. Sheet E3.2.4 - Egress lighting shall be from the life safety panel. NEC 517.42 (typical all) 44. Sheet E3.3.1 - Add the panel designations to the appropriate notes. (typical all) 45. Sheet E3.3.1 - Provide compliance with NEC 517.42 in the waiting area. (typical all) 46. Sheet E3.3.2 - Please provide the panels identified on the sheet in the appropriate notes. 47. Sheet E3.3.3 - Provide the panel designations for the lighting circuits on this sheet in the appropriate note. 48. Sheet E3.3.3 - Lighting should be standard in similar rooms, like the locker rooms. See the locker rooms on sheet E3.2.3 for exit lights. Please clarify. 49. Sheet E3.3.3 - The egress lights in the locker rooms do not meet the criteria of NEC 517.43(A). Please clarify. 50. Sheet E3.3.4 - Please provide the panel designations for all lighting circuits shown in the appropriate note. 51. Sheet E3.4.1 - To provide consistency and clarity add notes 13, 14, & 15 and provide the panel designations for the lighting circuits shown. (typical all) 52. Sheet E3.4.2 - To provide consistency and clarity add notes 13, 14, & 15 and provide the panel designations for the lighting circuits shown. (typical all) 53. Sheet E3.4.3 - To provide consistency and clarity add notes 13, 14, & 15 and provide the panel designations for the lighting circuits shown. (typical all) 54. Sheet E3.4.4 - To provide consistency and clarity add notes 13, 14, & 15 and provide the panel designations for the lighting circuits shown. (typical all) 55. Sheet E3.5.7 - There is no panel schedule for 5IAAH1-1 and it is not shown on the one line. Please clarify. 56. Sheet E3.7.0 - Fix the title block line spacing issue. 57. Sheet E3.7.5 - Provide the panel designations at the arrows for consistency and clarity. 58. Sheet E3.8.6 - For clarity and consistency add the panel designations shown at the arrows and to notes 13, 14, & 15 for the lighting. (typical all) 59. Sheet E3.9.6 - Please clarify the use of the light fixtures shown in the elevator shafts. (typical all) 60. Sheet E3.9.6 - This symbol for the light fixture in the elevator shafts are identified for a life safety fixture but the panel specified is a normal power panel. Please clarify. 61. Sheet E3.9.6 - Provide a panel schedule for all circuits from panel 1NAAH1 shown on these plans to verify code compliance. 62. Sheet E3.9.6 - This panel is identified as 1NAAH on the one line and 1NAAH1 here. Please clarify. 63. Sheet E3.10.0 - Provide clarification on how these lights comply with NEC 517.32(A) thru (H). 64. Sheet E3.10.6 - Provide the panel designations for the lighting circuits shown on this sheet in the appropriate note. 65. Sheet E4.2.1 - Panel 2NBAL1 is not listed with the panel schedules and there is no panel schedule for it. Please clarify. 66. Sheet E4.2.1 - There are no panel and circuits identified for several rooms. Please clarify. 67. Sheet E4.2.1 - There are no panel schedules for any of these second floor panels. Please clarify. 68. Sheet E4.2.2 - Provide panel schedules to verify code compliance. There are no panel schedules for the second floor. 69. Sheet E4.2.3 - Please provide panel schedules to verify code compliance. There are no panel schedules for these panels. 70. Sheet E4.2.3 - Correct the plan sheet identification. 71. Sheet E4.2.4 - Provide panel and circuit identification for all the receptacles in the IR Control Room area. 72. Sheet E4.2.4 - Provide panel schedules for all the panels on this sheet. 73. Sheet E4.3.1 - Clearly identify each circuit as to it's clear, evident, and specific purpose or use on the circuit directory or panel schedule. The identification shall include sufficient detail to be distinguished from all others as required by NEC 408.4. (typical all circuits in all panel schedules) 74. Sheet E4.3.1 - In all pediatric areas ensure all receptacles comply with NEC 517.18(C). (typical all) 75. Sheet E4.3.2 - Please clearly identify all equipment shown on the floor plans. (typical all) 76. Sheet E4.3.2 - Provide a panel and circuit for these receptacles or clearly indicate the tie to the other receptacle circuit shown. Please clarify. 77. Sheet E4.3.2 - Provide GFCI protection for all drinking fountains as required by NEC 422.52. (typical all) 78. Sheet E4.3.2 - Provide GFCI protection for all vending machines as required by NEC 422.51. (typical all) 79. Sheet E4.3.2 - Provide how these receptacles meet the requirements of NEC 517.33. Also the symbol used does not reflect critical power receptacles per the legend. 80. Sheet E4.3.2 - This area shows lockers and not vending machines on the Architectural floor plan. Please verify use of the correct floor plan. 81. Sheet E4.3.3 - All 15 and 20 Amp 125 volt receptacles in kitchen/food prep areas shall be GFCI type as per NEC 210.8. (typical all) 82. Sheet E4.3.3 - Please clarify this symbol. Ensure compliance with NEC 210.4 & NEC 310.15(B)(3)(a). (typical all) 83. Sheet E4.3.4 - There is no panel and circuit called out for several clean core receptacles. Please clarify. 84. Sheet E4.3.4 The placement of the detail symbol makes the panel ID unreadable. Please clarify. 85. Sheet E4.4.2 - Please clarify where the double symbols are shown. (typical all) 86. Sheet E4.4.2 - Where is the circuit identification for the office vestibule receptacle? 87. Sheet E4.4.3 - Please clarify light and double symbols shown. Provide the panel and circuit designation for them. (typical all) 88. Sheet E4.5.6 - Please clarify why there are two identical key notes. 89. Sheet E4.6.6 - Please clarify and provide a panel and circuit designation for the circuits near Shaft #12. 90. Sheet E4.6.6 - Please clarify and provide a panel and circuit designation for the Office #6 receptacles. 91. Sheet E4.6.7 - Please clarify and provide a panel and circuit designation for the Team Room normal and critical receptacles. 92. Sheet E4.7.5 - Please clarify and provide a panel and circuit designation for the charting area and corridor receptacles. 93. Sheet E4.7.6 - Please clarify and provide a panel and circuit designation for the Ante Room receptacle. 94. Sheet E4.7.7 - Please clarify electric room receptacles and use the correct symbol for critical power receptacles per the legend. 95. Sheet E4.8.6 - Please clarify and provide a panel and circuit designation for the Burn Procedure Room A critical power receptacles. 96. Sheet E4.8.6 - Please clarify and provide a panel and circuit designation for the North West Corridor normal power receptacle circuit. 97. Sheet E4.9.6 - Provide GFCI protection for water coolers as required by NEC 422.52. (typical all) 98. Sheet E5.1.3 - Please clarify and provide a panel and circuit designation for the Med Gas Storage and MEP receptacle circuits. 99. Sheet E5.2.1 - Provide clarification as to what the BAS panel is for in Key Note #1. 100. Sheet E5.2.1 - Provide panel schedules for these panels to verify code compliance. 101. Sheet E5.2.1 - The circuit descriptions do not correlate with the panel schedule. Please clarify. 102. Sheet E5.2.1 - Provide clarification that it is the fire alarm devices shown here that are on life safety power as per NEC 517.32. (typical all) 103. Sheet E5.2.2 - Please provide all panel schedules to verify code compliance. 104. Sheet E5.2.2 - Provide key note 3 as shown by the key note symbol on this sheet. Please clarify. 105. Sheet E5.2.3 - Please provide all panel schedules to verify code compliance. 106. Sheet E5.2.4 - Please provide all panel schedules to verify code compliance. 107. Sheet E5.3.1 - The panel schedule shows circuit 28 is a spare. Please clarify. 108. Sheet E5.3.1 - The panel schedule shows circuits 3, 4, & 5 are for FSD for shaft #2 and circuit 6 is for mechanical equipment. Please clarify. 109. Sheet E5.3.1 - There is no panel schedule for this panel and this is designated as a critical power panel not equipment power. Please clarify the use and verify the correct panel and circuit and correlate with the appropriate panel schedule. 110. Sheet E5.3.1 - This panel schedule shows circuit 10 is spare. Please verify the correct circuit and panel. 111. Sheet E5.3.2 - Panel schedule 3EAAL1 shows circuits 1, 2, & 3 are all for FSD for shaft #3. Please clarify. 112. Sheet E5.3.2 - Please clarify the use of the symbol for key note 3. There is no key note 3. 113. Sheet E5.3.2 - This panel schedule shows circuits 28 & 29 as spare. Please verify the correct panel and circuit. 114. Sheet E5.3.3 - Clarify what these circuits are for to verify code compliance. The panel schedules state general mechanical equipment. 115. Sheet E5.3.3 - The panel schedule has circuits 4 & 5 for shaft #9 and does not have any circuits shown for shaft #7. Please clarify. 116. Sheet E5.3.3 - The panel schedule shows circuits 30, 31, and 32 as spare. Please clarify. 117. Sheet E5.3.4 - Panel schedule 3EAAL1 shows circuits for FSD for shafts #4, #5, and #6 but they are not shown on this sheet. Please clarify. 118. Sheet E5.3.4 - The panel schedule shows circuit 33 as spare. Please clarify. 119. Sheet E5.4.1 - The panel schedule shows circuit 18 is for a FSD in room 0440101. Please clarify. 120. Sheet E5.4.1 - The panel schedule shows circuit 20 as a lift station and not FSD. Please clarify. 121. Sheet E5.4.1 - The panel schedule shows circuits 31, 32, 33, 34, & 35 as spares. Please clarify. 122. Sheet E5.4.1 - There are there fire smoke dampers in a shell space and no walls. Please clarify. 123. Sheet E5.4.1 - This panel schedule shows circuits 16, 17, 18, & 19 as spares. Please clarify. 124. E5.4.2 - Panel schedule 4EAAL1 shows circuits for items in room 0440101 but there is no room with that number on this sheet. Should this be room 0440701? Please clarify. 125. Sheet E5.4.2 - This panel schedule shows circuit 12 as a space. Please clarify. 126. Sheet E5.4.2 - This panel schedule shows circuit 6 is for PT blower 1. Please clarify. 127. Sheet E5.4.2 - This panel schedule shows circuits 18, 19, 20, 21, & 23 as spare. Please clarify. 128. Sheet E5.4.2 - This panel schedule shows circuits 33, 35, & 37 as spare. Please clarify. 129. Sheet E5.4.2 - This panel schedule shows circuits 46 & 47 as spare. Please clarify. 130. Sheet E5.4.3 - Identify all equipment. The panel schedule says this is an FSD in room 0440101. Please clarify. 131. Sheet E5.4.3 - The panel schedule shows this circuit is for FSD in room 0450501. Please clarify. 132. Sheet E5.4.3 - The panel schedule states circuit 5 is for HB-2 not circuit 6. Please clarify. 133. Sheet E5.4.3 - The panel schedule states circuit 5 is for MVP-1 not circuit 6. Please clarify. 134. Sheet E5.4.3 - The panel schedule states circuit 6 is for MVP-2 not circuit 5. Please clarify. 135. Sheet E5.4.4 - Clarify the location and description for this circuit 4EAAL1-2 on the panel schedule. 136. Sheet E5.4.4 - The equipment does not match what is shown on the panel schedule. Please clarify. 137. Sheet E5.4.4 - The panel schedule has the room number wrong for these circuits. Please clarify. 138. Sheet E5.4.4 - The panel schedule shows this circuit is for control in room 0450550D but that room number is a shaft. Please clarify. 139. Sheet E5.4.4 - The panel schedule states circuit 40, 41, & 42 are spare. Please clarify. 140. Sheet E5.4.4 - The elevator cab lighting circuit should be on the lighting plan or an elevator machine room detail to verify compliance with NEC 620 and not the equipment plan. 141. Sheet E5.5.5 - The panel schedule states that circuit 5SABL1-12 is a spare. Please clarify. 142. Sheet E5.5.6 - This location is not clearly specified on the panel schedule for circuit 5EABL1-1. Please clarify. 143. Sheet E5.5.7 - The panel schedule shows circuit 5SABL1-13 as a spare. Please clarify. 144. Sheet E5.6.5 - Both key notes 1 & 2 refer to circuits for BAS panels. Please clarify. 145. Sheet E5.6.5 - The panel schedule states that circuit 6EABL1-11 is a spare. Please clarify. 146. Sheet E5.6.5 - This is a life safety panel and key note 1 does not comply with NEC 517.42. Please clarify. 147. Sheet E5.6.6 - The panel schedule is blank for all parts of circuits 6EABL1-1, 3, & 5. Please clarify. 148. Sheet E5.6.6 - There is no circuit designated for the items shown in the IDF Closet and the Ante Room. Please clarify. 149. Sheet E5.6.7 - This panel schedule shows circuit 4 is an FSD in tower 4, circuit 3 is not shown on the floor plan, and circuit 10 is a spare. Please clarify. 150. Sheet E5.7.5 - Clarify the location and use of circuit 7EABL1-2 on the panel schedule. 151. Sheet E5.8.5 - Both key notes 2 & 3 address BAS panels. Please clarify. 152. Sheet E5.8.5 - Provide compliance with NEC 517.42 for key note #3. 153. Sheet E5.8.5 - This fan coil number does not correlate with the panel schedule. Please clarify. 154. Sheet E5.9.5 - This fan coil number does not correlate with the panel schedule. Please clarify. 155. Sheet E5.10.5 - None of the EF circuits correlate with the panel schedule. Please clarify. 156. Sheet E5.10.5 - Provide circuit and panel designation for the SPF-4 equipment. 157. Sheet E5.10.5 - The panel schedule shows the receptacle circuit as a spare. Please clarify. 158. Sheet E5.10.6 - Clearly identify each elevator to verify code compliance. Every circuit seems to be wrong per the panel schedule but it is hard to verify with nothing identified. (typical all) 159. Sheet E5.10.6 - Elevator cab light circuits should be on the lighting sheets or provide a detail of the elevator equipment rooms showing compliance with all applicable parts of NEC 620. (typical all) 160. Sheet E5.10.6 - None of the equipment circuits shown correlate with the panel schedule. Please clarify. 161. Sheet E5.10.6 - These receptacle circuits are shown as spare on the panel schedule. Please clarify. 162. Sheet E5.10.7 - These circuits do not correlate with the panel schedules. Please clarify. 163. Sheet E6.1.1 - Clarify the location of the standard voice/data symbols. They are not on a wall. 164. Sheet E6.1.4 - Please clarify what these junction boxes are for. 165. Sheet E6.2.1 - Key notes 4 & 5 are identical. Please clarify. 166. Sheet E6.2.3 - Please clarify the difference between the patient room dome light and the zone dome light. The patient room dome lights are shown in the corridor and are not located in patient rooms. 167. Sheet E6.2.3 - Please clarify why key note 3 is in this location but there is no cable tray shown. 168. Sheet E6.2.3 - This voice/data outlet is in the middle of the room. Clarify what is it supported by. 169. Sheet E6.3.3 - Please clarify what the dashed square and dashed round symbols are used for. They are not shown on the symbol sheet E0.0.1. 170. Sheet E6.3.4 - Please clarify what the junction boxes with "C8" by them refer too. This symbol is not shown on the symbol sheet E0.0.1. (typical all) 171. Sheet E6.3.4 - Please clarify what the dashed square and dashed round symbols are used for. They are not shown on the symbol sheet E0.0.1. (typical all) 172. Sheet E6.4.2 - Key note 2 is in the wrong location in the corridor. 173. Sheet E6.4.3 - Please clarify why the patient room dome lights are in the equipment and electric rooms and in unoccupied locations. (typical all) 174. Sheet E6.5.6 - The some upper and lower floors do not have door holders or delayed magnetic locks in the corridors. Should these corridor doors be standardized? Please clarify. 175. Sheet E6.5.7 - Please verify all the doors that use magnetic door holders. 176. Sheet E6.6.6 - Most hospital corridor doors are held open or use electric door openers to prevent the spread of germs. Please verify. (typical all) 177. Sheet E7.0.1 - Clearly identify all electric doors with push plates shown on detail 10 on the systems plans with the other door hardware. 178. Sheet E8.0.2 - Ensure compliance with NEC 210.7 for these receptacles supplied by multiple branch circuits as designated by key note 3. 179. Sheet E8.0.2 - Please clarify and standardize the identification of circuits 11, 13 & 17, 18 & 19, 20 with a comma between the numbers. 180. Sheet E8.0.3 - The panel schedule for 4NBBL2 circuits 25, 26, and 27 is not clear and specific as to use and location. Please clarify. 181. Sheet E8.0.3 - This panel schedule shows the circuits for LS-4 as spare. Please clarify. 182. Sheet E8.0.4 - Please clarify and provide a panel and circuit identification for the under counter fridge listed in key note 1. 183. Sheet E8.3.0 - Please clarify and provide the name of all panels shown. 184. Sheet E8.4.0 - Please clarify and provide the identification of this symbol or equipment shown between the door and T-4EABL1. 185. Sheet E8.5.0 - Please clarify and provide the name of this panel shown in detail 2. 186. Sheet E8.5.0 - Please clarify and standardize the detail and relocate the bus duct label so you can read the panel names. 187. Sheet E8.6.0 - Please clarify and provide all room names and room numbers. 188. Sheet E8.6.0 - Please clarify if this is an electric room or an elevator control room. If this is an elevator control room the receptacles must be GFCI as required by NEC 620.85. 189. Sheet E9.0.0 - Please clarify and provide an identification point (F1, F2, etc) for each point on the one line to verify code compliance with NEC 110.9 and NEC 110.10. (typical all) 190. Sheet E9.1.1 - Please provide the amperage rating, short circuit current ratings or bracing, AIC ratings, loads, frame and trip sizes of all breakers, and correlate with the one line. (typical all) 191. Sheet E9.1.1 - The cubicle numbers and loads served do not correlate with what is shown on the one line. Please clarify. (typical all) 192. Sheet E9.1.1 - The one line does not match what the panel schedules show. Provide main breaker size, feeder breaker frame size, trip sizes, loads, etc. Please clarify. (typical all) 193. Sheet E9.2.1 - Not all the panel schedules shown for circuits on the second floor plans are provided. Please clarify. 194. Sheet E9.2.1 - The one line does not show 2NBAL-D2 being fed from 4NBAL-S2. Please clarify. 195. Sheet E9.2.1 - The one line shows 2NBAL5 fed from 2NBAL-D1 and no 2NBAL6. Also there are 2 2NBAL4 feeders shown, one in 2NBAL-D1 and another one in 2NBAL-D2. Please clarify. 196. Sheet E9.2.1 - The one line shows 2NBBL5 & 6 and 4 100 Amp spaces. Please correlate this panel schedule with the one line. 197. Sheet E9.2.1 - The one line shows 4 100 Amp spaces in each panel. Please clarify. 198. Sheet E9.2.1 - The panel 2EAAL1 is on the second floor and the room numbers shown are on the sixth floor. These circuits are not identified on any sixth floor drawings. Please clarify. 199. Sheet E9.2.1 - The panel 2EAAL1 is rated for 100 Amps and the main breaker is 100 Amps but the panel schedule states the load for this panel is 195 Amps. There is no location and no fed from shown. Please clarify. 200. Sheet E9.2.1 - This 2NBAL-D1 does not match the one line. The one line shows cubicle 5 as 100 Amp 2NBAL5 and 4 100 Amp spaces. Please correlate with the one line. 201. Sheet E9.3.1 - Circuit 62 is for a drinking fountain. Please provide compliance with NEC 408.4 and NEC 420.52. (typical all drinking fountains) 202. Sheet E9.3.1 - Circuits 3 & 4 are for vending machines. Provide compliance with NEC 408.4 and NEC 422.51. 203. Sheet E9.3.1 - On ALL panel schedules the descriptions shown in the Notes column should be in the description column and clearly identify all loads served to provide compliance with NEC 408.4(A). 204. Sheet E9.3.1 - Some panel schedules are left blank for the description and the location of the loads served. Please provide all information to ensure code compliance as required by NEC 408.4(A). (typical all) 205. Sheet E9.3.1 - This circuit is not shown on the floor plan and circuit 9 is blank. Please verify ALL circuits correlate with the floor plans. (typical all) 206. Sheet E9.3.2 - Provide the sizes of all spare breakers. (typical all) 207. Sheet E9.3.4 - Circuit 45, 47 are in OR 10 not clean core and should be 30 Amp not 20 Amp, also the breaker size shown for circuits 41, 43 is not legible. Please clarify. 208. Sheet E9.3.4 - On some panel schedules some of the breakers show a zero load. Please provide a load for all circuits and include it in the total load calculation as required by NEC 220. (typical all) 209. Sheet E9.3.4 - The floor plan shows this receptacle as an R3 (30 Amp) and not an R5 (50 Amp). Please clarify. 210. Sheet E9.3.4 - This breaker size for some R3 & R5 receptacles does not correlate with the legend and symbol sheet. There are some breakers that the sizes are unclear. Please clarify and correlate all breaker sizes. (typical all) 211. Sheet E9.3.5 - All panel schedules are either incomplete, incorrect, or are to unclear to complete my code compliance review. Please correlate all panel schedules with the one line, the floor plans, include all breaker sizes, include load calculations that comply with NEC 220.40, and clarify all loads and locations as required by NEC 408.4. (typical all) 212. Sheet E9.3.5 - Please clarify your load calculations. Lighting is a continuous load and shall be calculated at 125% of the connected load per NEC 220. (typical all) 213. Sheet E9.3.6 - None of the circuits shown on the floor plan are shown on these panel schedules. Please clarify. 214. Sheet E9.3.7 - Clearly identify all circuit breaker sizes and types. (typical all) 215. Sheet E9.3.8 - Circuit identification on the panel schedules does not match the floor plan. Please clarify and provide compliance with NEC 408.4. (typical all) 216. Sheet E9.3.8 - The floor plan shows circuits 30 & 31 used for FSD in shaft #9 but the panel schedule shows as spare. Please clarify. 217. Sheet E9.4.1 - Panel schedules are not accurate and the circuits are not identified and do not provide compliance with NEC 408.4. (typical all) 218. Sheet E9.4.3 - The circuits shown on the panel schedules do not correlate with the devices and equipment shown on the floor plans. Please clarify and provide compliance with NEC 408.4. (typical all) 219. Sheet E9.4.6 - Provide all the standard information such as main breaker sizes, fed from where, bus short circuit current rating, bus amperage and voltage rating, etc. (typical all) 220. Sheet E9.4.7 - The breaker sizes do not correlate with the one line. (typical all) 221. Sheet E9.4.7 - The one line shows the elevators have 60 Amp breakers and spaces for four 100 Amp breakers. Please correlate the panel schedules with the one line. (typical all) 222. Sheet E9.1.1 thru E9.10.1 - I stopped checking the panel schedules against the one line and the floor plans. Many the circuits seemed not to correlate with the floor plan and the one line. The descriptions are vague or blank and some of the breaker sizes are incorrect or blank. Please verify the circuits and provide enough information in the location and description of the load or equipment to verify code compliance. |
| 12/05/2016 | STANTEC | BUILDING-COMMERCIAL | REVIEW | Needs Review | Architectural Review by Joel Svoboda T16CM02176 1. Sheet G2.1: There are two refuse/laundry chutes enclosed by 2-hour fire-rated shafts meeting the requirements of NFPA 82 Art. 5.2.3.1.2. The termination room(s) are required to have no less than the same rating as the shafts per 2012 IBC Sec. 713.13 and NFPA 82 Art. 5.2.4.1; currently these rooms are showing a 1-hour rating. Also, the bottom of the chutes must have automatic closing or self-closing doors with a 1-1/2 fire-hour rating per NFPA 82 Art. 5.2.3.1.3. 2. Sheet G2.2: Please identify the smoke compartments and their sizes; like the presentation made on the other Life Safety Plans. 3. Sheet G2.2: It is unclear how this shaft is terminated. Does it terminate at the floor? If it does not, then please clarify how this shaft meets the requirements of 2012 IBC Sec. 713.11 for the enclosure of the shaft at the bottom. If Item 2 is utilized, then the room below must be separated with 2-hour fire barriers and not 1-hour fire barriers as shown. 4. Sheet G2.3: It is unclear how this shaft is terminated. Does it terminate at the floor? If it does not, then please clarify how this shaft meets the requirements of 2012 IBC Sec. 713.11 for the enclosure of the shaft at the bottom. 5. Sheet A2.2.2: The access side of the chutes must be flipped on the 4th floor and below; the 5th floor and above is correct. 6. Sheet A7.0.4A: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 7. Sheet A7.0.4B: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 8. Sheet A7.0.4C: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 9. Sheet A7.0.4C: The horizontal grab bars required by ICC/ANSI A117.1-2009 Sec. 608.3.1.1 are missing at these accessible showers. 10. Sheet A7.0.4F: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 11. Sheet A7.0.4F: The horizontal grab bars required by ICC/ANSI A117.1-2009 Sec. 608.3.1.1 are missing at these accessible showers. 12. Sheet A7.0.4H: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 13. Sheet A7.0.4H: The horizontal grab bars required by ICC/ANSI A117.1-2009 Sec. 608.3.1.1 are missing at these accessible showers. 14. Sheet A7.0.4I: The horizontal grab bars required by ICC/ANSI A117.1-2009 Sec. 608.3.1.1 are missing at these accessible showers. 15. Sheet A7.0.5: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 16. Sheet A7.0.5: The horizontal grab bars required by ICC/ANSI A117.1-2009 Sec. 608.3.1.1 are missing at these accessible showers. 17. Sheet A7.0.5A: Showers are not ADA compliant as required by 2012 IBC Sec. 1109.2 and per ICC/ANSI A117.1-2009 Sec. 608; and specifically 608.6. 18. Sheet A7.0.5A: Blocking for all grab bars and folding seats not provided now is required per 2012 IBC Sec. 1109.2, Exception 1 and ICC/ANSI A117.1-2009 Sec. 608.2.1.3. 19. Sheet A7.0.5B: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 20. Sheet A7.0.5B: The horizontal grab bars required by ICC/ANSI A117.1-2009 Sec. 608.3.1.1 are missing at these accessible showers. 21. Sheet A7.0.5B: Showers are not ADA compliant as required by 2012 IBC Sec. 1109.2 and per ICC/ANSI A117.1-2009 Sec. 608; and specifically 608.6. 22. Sheet A7.0.5B: Blocking for all grab bars and folding seats not provided now is required per 2012 IBC Sec. 1109.2, Exception 1 and ICC/ANSI A117.1-2009 Sec. 608.2.1.3. 23. Sheet A7.0.5C: Showers are not ADA compliant as required by 2012 IBC Sec. 1109.2 and per ICC/ANSI A117.1-2009 Sec. 608; and specifically 608.6. 24. Sheet A7.0.5C: Blocking for all grab bars and folding seats not provided now is required per 2012 IBC Sec. 1109.2, Exception 1 and ICC/ANSI A117.1-2009 Sec. 608.2.1.3. 25. Sheet A7.0.5D: Showers are not ADA compliant as required by 2012 IBC Sec. 1109.2 and per ICC/ANSI A117.1-2009 Sec. 608; and specifically 608.6. 26. Sheet A7.0.5D: Blocking for all grab bars and folding seats not provided now is required per 2012 IBC Sec. 1109.2, Exception 1 and ICC/ANSI A117.1-2009 Sec. 608.2.1.3. 27. Sheet A7.0.5E: A vertical grab gar is required at a transfer type shower stall per ICC/ANSI A117.1-2009 Sec. 608.1.2. 28. Sheet A7.0.5E: The horizontal grab bars required by ICC/ANSI A117.1-2009 Sec. 608.3.1.1 are missing at these accessible showers. 29. Sheet A7.0.6: Per ICC/ANSI A117.1-2009 Sec. 608.2.1.3 a folding or non-folding shower seat is required at these ADA showers. 30. Sheet A7.0.6B: Per ICC/ANSI A117.1-2009 Sec. 608.2.1.3 a folding or non-folding shower seat is required at these ADA showers. 31. Sheet A7.0.6C: Per ICC/ANSI A117.1-2009 Sec. 608.2.1.3 a folding or non-folding shower seat is required at these ADA showers. 32. Sheet A9.3.1.2: Provide hardware set information so that door operations can be verified as meeting code; i.e. specialty items such as panic and fire exit hardware, delayed egress locks, access controlled egress locks, and special locking arrangements. 33. Sheet A9.0.1: Please provide on the plans listed details indicating how membrane and through penetrations will be addressed at the various fire resistive wall types and horizontal assemblies presented on this page per 2012 IBC Sec. 714. |
| 12/06/2016 | STANTEC | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet P2.2.3: Check to make sure that all abbreviations are included on Sheet P0.0.1; specifically, DCW (domestic cold water), DWC (domestic water cold?), SCW (softened cold water), ROS and ROR (reverse osmosis supply and return). |
| 12/06/2016 | STANTEC | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | 2. Sheet M2.2.2: As a general note regarding all the mechanical drawings, it would be beneficial to see all the fire barriers and smoke barriers that are communicated on the architectural plans. There are several dampers missing that likely would have been caught with this information provided on the mechanical plans. 3. Sheet M2.3.1: These are 1-hour fire barriers, therefore fire dampers are required. 4. Sheet M2.3.4: These four ducts penetrate 1-hour fire barriers. There is a mix of fire dampers and fire/smoke dampers; please clarify the arrangement. There are 3 different smoke compartments; should there be 3 fire/smoke dampers and 1 fire damper? 5. Sheet M2.3.4: These 1-hour fire barriers require fire dampers per 2012 IBC Sec. 717.5.2. There are two similar rooms to the north that are done correctly. 6. Sheet M2.4.1: Several duct sizes appear to be missing in this area of the plan; associated with AHU "H". Please clarify. 7. Sheet M2.4.3: A fire/smoke damper is required at this duct penetration of the 2-hour fire rated shaft per 2012 IBC Sec. 717.5.3. 8. Sheet M2.4.3: A fire Damper must be provided at the penetration of this 2-hour fire barrier; like the two adjacent ducts. 9. Sheet M2.5.5: The soiled work room, clean supply room, and adjacent mechanical/electrical room are separated from each other and adjacent spaces by 1-hour fire barriers; fire dampers are required per 2012 IBC Sec. 717.5.4 10. Sheet M2.5.5: The equipment storage room is separated from adjacent spaces by 1-hour fire barriers; fire dampers are required per 2012 IBC Sec. 717.5.4 11. Sheet M2.5.6: There are two 1-hour smoke barriers which require smoke dampers per 2012 IBC Sec. 717.5.5. Coordinate with the architectural drawings (reference the next sheet for continuation). 12. Sheet M2.5.6: Again, missing fire dampers. 13. Sheet M2.5.6: In general, please coordinate with the architectural drawings regarding the location of all fire barriers and smoke barriers and provide fire dampers and smoke dampers per 2012 IBC Sec. 717.5.2 and 717.5.5 respectively. There appears to be quite a few such devices missing. Floors 6 through 9 have been more properly noted, however they too are missing dampers in some locations. 14. Sheet M2.5.7: The soiled work room is separated from adjacent spaces by 1-hour fire barriers; fire dampers are required per 2012 IBC Sec. 717.5.4. 15. Sheet M2.5.7: The soiled work room, clean supply room, and adjacent mechanical/electrical room are separated from each other and adjacent spaces by 1-hour fire barriers; fire dampers are required per 2012 IBC Sec. 717.5.4. 16. Sheet M2.5.7: There is a 1-hour smoke barrier which requires smoke dampers per 2012 IBC Sec. 717.5.5. Coordinate with the architectural drawings (reference previous sheet for continuation). |
| 12/22/2016 | FRODRIG2 | WWM | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/22/2016 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |