Permit Number: T11CM00605
Parcel: 129041810

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T11CM00605
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/01/2011 DAVE MANN FIRE REVIEW Denied Fire Comments:

The fire wall for the property line must continue through the overhang on the easr side. See IFC Chapter 7 and IBC 705.
03/04/2011 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. Please provide site plan showing all properties and their physical relationship to each other and site parking and drive entrances and property lines.
2. Provide structural framing key plan and reference all numerated beams and joist types and sizes.
3. At Detail 1/A2, please reference all structural details for newly attached cantelevers, built up floating fascia/coping and all connections to existing and call out all existing materials. Please provide structural calculations for all structural elements, cantelevers, floating coping/fascia and all connections and attachmments.
END OF REVIEW
03/14/2011 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
03/14/2011 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
03/14/2011 ROBERT SHERRY WATER REVIEW Approved
03/14/2011 RSHERRY1 WWM REVIEW Passed No new plumbing fixtures.
03/16/2011 MICHAEL ST. PAUL ZONING REVIEW Denied CDRC TRANSMITTAL


FROM: Michael St.Paul, Planning Technician

PROJECT:
T11CM00605
2012 East Broadway Boulivard
Building facade


TRANSMITTAL: March 16, 2011


COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.


The site is located in the C-1 zone. The use is retail and the Development Designator is "28" (LUC Section 2.5.3.2.B.2).

The propose façade must meet the setback for the future right-of-way (F/ROW) relative th the MS&R plan (LUC Section 2.8.3.1). There is a Specific Plan for this portion of Broadway. Please contact Jose Ortiz (837-6730) for a copy of the Specific Plan for your section of Broadway and provide it with your submittal.

Clearly depict, with dimensions, the F/ROW acording to the Specific Plan on your plans.

The required setback is the greater of twenty (21) feet or the height (H) from the back of the future curb (LUC Section 3.2.6.5.B).
03/17/2011 SREEVES1 ELECTRICAL-COMMERCIAL REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
03/17/2011 SUE REEVES OUT TO CUSTOMER Completed