Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T10CM00917
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/03/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how tepid water is to be supplied to the emergency shower/eyewash per ANSI/ISEA Z358.1-2009 Standard. 2. Show how locating a floor sink (P-12, installed per detail 220) along with a floor-mounted condensate drain pipe in the service entrance area walkway will not interfere with access to the LSS equipment area. Reference: Section 309.0, UPC 2006. 3. Provide air-gap separation between the potable water supply and the flushing header, the manual water make-up, and the float-operated water fill in the settling chamber. Reference: Section 603.3.5, UPC 2006. 4. Provide the expected discharge flow rate from each of the filter backwash units. Reference: Sections 103.2.3, 703.2, and 804.1, UPC 2006. |
05/03/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for the building envelope and the mechanical equipment. Provide sufficient detail on the drawings to compare the energy compliance of the building envelope with the energy code compliance calculations. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Exhaust fan EF-1 is not serving a restroom but an ozone generation room. Provide ventilation for the room per Section 502.9.9, IMC 2006. 3. Show that both EF-1 and EF-2 are listed for continuous operation. Reference: Section 304.1, IMC 2006. 4. Provide information to show the type and quantities of chlorine being stored in the chlorine room do not exceed the maximum allowable quantity. 5. Show how the location of the exhaust discharge location for EF-2 complies with Section 501.2, IMC 2006. (Note that the exhaust fan schedule calls for termination with roof caps but the plans call for wall terminations.) |
05/03/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | The calculations on sheet 0P204 indicate that an existing 2" water meter is serving this activity. What will be the total connected water demand on the existing water meter that results from the addition of this activity? Reference: Sections 610.1 and 610.2, UPC 2006. |
05/04/2010 | SREEVES1 | ZONING | REVIEW | Needs Review | |
05/04/2010 | SREEVES1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
05/04/2010 | SREEVES1 | FIRE | REVIEW | Needs Review | |
05/04/2010 | SREEVES1 | ADA | REVIEW | Needs Review | |
05/13/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | |
05/13/2010 | SREEVES1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
05/13/2010 | SREEVES1 | ENGINEERING | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/09/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
07/09/2010 | SUE REEVES | REJECT SHELF | Completed |