Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T10CM00917
Parcel: 12620001C

Address:
3400 E ZOO CT

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM00917
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/03/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Show how tepid water is to be supplied to the emergency shower/eyewash per ANSI/ISEA Z358.1-2009 Standard.
2. Show how locating a floor sink (P-12, installed per detail 220) along with a floor-mounted condensate drain pipe in the service entrance area walkway will not interfere with access to the LSS equipment area. Reference: Section 309.0, UPC 2006.
3. Provide air-gap separation between the potable water supply and the flushing header, the manual water make-up, and the float-operated water fill in the settling chamber. Reference: Section 603.3.5, UPC 2006.
4. Provide the expected discharge flow rate from each of the filter backwash units. Reference: Sections 103.2.3, 703.2, and 804.1, UPC 2006.
05/03/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide energy code compliance calculations for the building envelope and the mechanical equipment. Provide sufficient detail on the drawings to compare the energy compliance of the building envelope with the energy code compliance calculations. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
2. Exhaust fan EF-1 is not serving a restroom but an ozone generation room. Provide ventilation for the room per Section 502.9.9, IMC 2006.
3. Show that both EF-1 and EF-2 are listed for continuous operation. Reference: Section 304.1, IMC 2006.
4. Provide information to show the type and quantities of chlorine being stored in the chlorine room do not exceed the maximum allowable quantity.
5. Show how the location of the exhaust discharge location for EF-2 complies with Section 501.2, IMC 2006. (Note that the exhaust fan schedule calls for termination with roof caps but the plans call for wall terminations.)
05/03/2010 ROBERT SHERRY WATER REVIEW Denied The calculations on sheet 0P204 indicate that an existing 2" water meter is serving this activity. What will be the total connected water demand on the existing water meter that results from the addition of this activity? Reference: Sections 610.1 and 610.2, UPC 2006.
05/04/2010 SREEVES1 ZONING REVIEW Needs Review
05/04/2010 SREEVES1 BUILDING-COMMERCIAL REVIEW Needs Review
05/04/2010 SREEVES1 FIRE REVIEW Needs Review
05/04/2010 SREEVES1 ADA REVIEW Needs Review
05/13/2010 GERRY KOZIOL WWM REVIEW Denied
05/13/2010 SREEVES1 ELECTRICAL-COMMERCIAL REVIEW Needs Review
05/13/2010 SREEVES1 ENGINEERING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
07/09/2010 DELMA ROBEY OUT TO CUSTOMER Completed
07/09/2010 SUE REEVES REJECT SHELF Completed