Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T03OT00811
Review Name: FLOODPLAIN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/22/2003 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | SUBJECT: Floodplain Use Permit Application - Davis School REVIEWER: Doug Williams DATE: 22 October 2003 ACTIVITY NUMBER(s): T03OT00811/T03CM01876 SUMMARY: Engineering Section has reviewed the Site plan, Grading Site Plan and Floodplain Use Permit application received on September 20, 2003. A grading permit will be required for this development. Please complete and submit a grading permit application with resubmittal of the above-referenced activity number permit applications. Please ensure 2 copies of the drainage report are included in the resubmittal. Approval is not recommended at this time - resubmittal is required. The following comments must be addressed: SITE PLAN COMMENTS (Sheet AO.1DS): 1. Dimension and label the existing and future (Major Streets and Routes - MS&R Plan), rights-of-way to include intersection widening dimensioning for Granada Avenue at Saint Mary's Road (DS 2-02.2.1.19); 2. Dimension from street monument lines to existing and proposed curbs, sidewalks, driveways and utility lines (DS 2-02.2.21); GRADING SITE PLAN (Sheet AO.2DS): See summary regarding requirement for completion of a grading permit application. The following comments are preliminary in nature - further comments may be necessary upon grading permit application review. 1. Provide general excavation and grading notes - excavation and grading requirements may be accessed at: http://www.ci.tucson.az.us/dsd/2000_IBC_Amendments.pdf 2. Depict limits of grading. Proposed grading must meet setback requirements listed in Section 14 of the 2000 International Building Code - local amendment (see above website address), and may not go beyond property lines without providing written permission from the affected property owner; 3. Provide bases of bearing and elevation; 4. Depict and label existing property lines; 5. Provide total area to be disturbed; Note: The consultant and contractor should ensure interim erosion control measures such as silt fencing and/or hay bales are instituted during construction, for stormwater pollution prevention purposes. If you have any questions, I can be reached at 791-5550, ext. 1189 or Dwillia1@ci.tucson.az.us Douglas Williams Sr. Engineering Associate Engineering Division Development Services Department |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/08/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 12/04/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |