Permit Number: DP21-0116
Parcel: 136270010

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP21-0116
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/07/2021 SBEASLE1 START PLANS SUBMITTED Completed
05/07/2021 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Passed
05/07/2021 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
05/07/2021 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
05/07/2021 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
05/10/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/18/2021 SBLOOD1 ENGINEERING REVIEW Reqs Change Development Package Comments:
Sheet 1
1. On the first sheet, provide the name and date of the geotechnical report. Provide the name, address, and phone number of the firm who prepared the report.

Sheet 3
1. Please include a keynote for the proposed electric transformers.
2. Please add keynote for street signs located west of both proposed driveways.

Sheet 4
1. Please revise double text on all existing contour lines on sheet C03.
2. Please revise note on sheets C03. I.E "For sheets C03 cross sections, see sheet C04."
3. Please provide a detail of the private retention basin.
4. Please remove one of the overlapping contour labels for the west contour 2724
5. Please provide flowline elevations at the concrete swale.
6. Provide flowline elevation to demonstrate basin will drain or infiltrate
7. Callout wall openings and reference appropriate detail
8. Show how new concrete channel daylight to existing grade in ROW
9. Verify erosion control is not needed at termination of proposed concrete channel
10. Callout and detail erosion protection at wall openings and into basin
11. Callout low flow pipe from basin and provide profile/detail for connection to existing City storm drain. Show pipes in/out of existing catch basin. Check if an existing concrete apron will need to be reconstructed

Sheet 5
12. Cutoff will need to be provided along edges of new concrete swale where sheet flow may enter


SWPPP Comments:
Sheet 42
1. Please provide a scale bar.
2. Please add a reference to appendix L after each of the applicable items in the legend.
3. Please remove one of the overlapping contour labels for the west contour 2724.
4. Please provide street names.


Drainage Comments:
General
1. Provide summary table for existing and proposed hydro calcs
2. Check FACW values in hydrolgy calcs which do not apear to be consistent with con


Page 2
3. Last paragraph correct typo
4. Discuss impervious assumptions for OFF11 as it looks like a fully developed condition has been assumed



Page 3
5. Fourth paragraph - Q reported for DA does not match Figure 4
6. If flow is on outside of wall how does it get into the new drainage channel inside the wall?
7. Discuss management of offsite flows (ie new concrete swale) in proposed conditions section

Page 4
8. Explain how developed conditions impervious values were determined

Page 10
9. Offsite Q and drainage area on Figure 3 does not match hydro calc sheet
10. Label off-site watershed consistent with hydro calc sheet

Page 11
11. Add topo labels to Figure 4
12. Make wall openings more apparent on Figure 4
13. Label basin spillway and low flow outlet on Figure 4
14. Topo on Figure 4 does not match development plan
15. Looks like about half of D2.1 would drain into proposed concrete swale and not into basin per proposed topo

Page 24
16. Confirm wall opening calc is appropriate. Usually uses weir or orifice equation

Page 25
17. What does this calc represent? Flow enters basin primarily via wall openings which need to be extended to basin with erosion protection

Page 41
18. N value of 0.035 is too high for concrete lined channel

Review and Comments provided by third party engineer reviewers under contract with the City of Tucson. For Questions or Concerns contact:
Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
05/20/2021 JPEELDA1 COT NON-DSD FIRE Approved
06/08/2021 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: TEP Patriot Substation
Development Package (1st Review)
DP21-0116

TRANSMITTAL DATE: June 8, 2021

DUE DATE: June 7, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 06, 2021.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0 , adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.6.a – Complete General Note 19 once the Special Exception has been approved, addition comments may be forth coming.

3. COMMENT: 2-06.4.7.A.6.a – General Note 18 remove the reference to “AIRPORT ENVIRONS ZONE (AEZ) as it is not applicable to this site.

2-06.4.7.A.8 - For development package documents provide:

4. COMMENT: 2-06.4.7.A.8.b – General Note 13 the “MAXIMUM =15%” is not correct. Per UDC TABLE 6.3-1.B: EXCEPTIONS TO THE RH, SR, SH, RX-1, & RX-2 DIMENSIONAL STANDARDS, SR Zone the maximum lot coverage is 50%.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.
5. COMMENT: 2-06.4.9.E - It appears that a land split is proposed. This split will need to be completed prior to approval of the DP.

6. COMMENT: 2-06.4.9.H.5.a – Provide a vehicle parking space calculation on the plan that includes the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. Per UDC TABLE 7.4.4-1: MINIMUM NUMBER OF MOTOR VEHICLE SPACES REQUIRED, UTILITIES USE GROUP, 1 space per 500 sq. ft. GFA, with a minimum of 2 spaces per facility. Show the required spaces on the plan. These spaces are not required to be paved but some type of dust control is required.

7. COMMENT: 2-06.4.9.O – The street perimeter yard setbacks are not correct. Per the definition of Established Area Setback and this site borders on two streets designated on the COT MS&R map the street perimeter yard setbacks are based on developing area setbacks, UDC Article 6.4.5.C.2 & TABLE 6.4.5.C-I and should be listed as 21’ or the Height, greater of the two, measured from the back of future curb.

If you have any questions about this transmittal, please contact Elisa Hamblin or Elisa.Hamblin@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/08/2021 SBEASLE1 COT NON-DSD PARKS & RECREATION Reqs Change Email from: Howard Dutt
To: CDRC
Tue 6/8/2021 7:23 AM

Regarding the multi-use path north of the site in the Escalante Road right of way: Parks & Rec recommends 1) Remove the truncated domes from the plan at the driveway crossings. 2) Add "No Motorized Vehicle" signs east and west of the two crossings.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks and Recreation
(520) 837-8040
06/14/2021 AWARNER1 LANDSCAPE REVIEW Reqs Change CDRC TRANSMITTAL

TO: Planning and Development Services Department, Plans Coordination

FROM: Anne Warner, PLA
PDSD Landscape/Native Plant Preservation Section

PROJECT: TEP Patriot Substation
ACTIVITY NO: DP21-0116
Address:
Parcel: 136-27-0010
Zoning: SR
Existing Use: Plane storage, previously graded
Proposed Use: TEP substation

TRANSMITTAL DATE: June 14, 2021
DUE DATE: June 7, 2021
COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed.
This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
1. UDC 2-10.4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

The development package will contain the following identification in the lower right corner of each sheet:

Any relevant case numbers for reviews or modifications that affect the site.
Provide Case # on each sheet.

Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.

2. Provide the length and width of all landscape borders on the plan and provide the square footage of all landscaped borders and the calculation of the percentage of vegetative coverage. Additionally, provide information on the street border requirements.

3. Provide construction details and/or sections that demonstrate water harvesting in landscape areas.

4. Show existing and future rights of way for Kolb Rd and Escalante Rd on all plans.

5. Provide a temporary irrigation system for the hydroseeding areas to establish seeds. Include details of the system (graphic or text) on the irrigation plans.

6. A Commercial Water Harvesting plan is required.

7. Kolb Rd. is a Gateway Route, indicate how the plans align with the purpose of the GCZ Overlay. UDC 5.5.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package

If you have any questions, please contact me at anne.warner@tucsonaz.gov
06/14/2021 SBEASLE1 COT NON-DSD TRAFFIC Reqs Change Email from: David.Stiffey@TucsonAz.gov
To: CDRC
Mon 6/14/2021 11:56 AM

Please see my comments below for DP21-0116:

1. Pertaining to Key Note No. 8, the "Near Side" lengths of both sight visibility triangles need to be 185 feet.

2. Please provide new 6 Ft wide sidewalk along the property frontage of Kolb Rd.

3. Please add new curb access ramps and the SW corner of Kolb Rd./ Escalante Rd.

4. Any "out of compliant" portions of the multi-use path will need to be repaired and upgraded as needed.


David Stiffey
06/22/2021 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Approved
06/23/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: Lisa Bowers
Wed 6/23/2021 11:30 AM

Returned for Corrections Notice
PERMIT/ACTIVITY: DP21-0116

DESCRIPTION: Site/Grading/Swppp - TEP Patriot Substation. 6980 E ESCALANTE RD

FEE BALANCE: $0 (zero) Thank you for the payment.

INCLUDE IN YOUR RESUBMITTAL
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your 2nd submittal documents according to this example: 2_Comment Response Letter, 01.01.21

FILEDROP
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
(Select "Existing Application", then enter the permit number)

SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab and you will see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW


Sharon Beasley, Permit Specialist

City of Tucson, Planning and Development Services
Email for Development Pkgs: COTDSDpermits@TucsonAz.gov
(disregard the email response that will be sent automatically)
Email for Building Permits: PDSDinquiries@TucsonAz.gov
06/23/2021 SBEASLE1 COT NON-DSD REVIEW Approved Email from: Christopher Blue
To: CDRC
Tue 6/22/2021 2:42 PM

The Transit Services Division has no comments.
Thank you,
Christopher Blue, MS

Transit Services Coordinator
City of Tucson
(520) 260-9558