Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel13627001B
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningSR
Tucson WardWard 4
Major Street & Route

Gateway Route, Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 6980 E ESCALANTE RD
Date - 12/08/2025 5:54 p.m.
Total Number Of Annexations & Original City Zoning (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-77-57 The Groves - Essex Gardens East 4696 4828
C9-86-53 Davis-Monthan 6533 6656

Permits

Address: 6980 E ESCALANTE RD
Date - 12/08/2025 5:54 p.m.
Total Number Of Permits - (9)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-1223-03117 Complete 12/27/2023 04/14/2024 Right-of-Way (ROW) - Utility WO T55638 - TEP to trench & install 2,825’ of conduit & cable, 4 pullboxes & 1 pole in dirt - TEP Project Designer is Juan Valenzuela/520-603-2169.
T22RW03436 Complete 09/21/2022 02/26/2023 Right-of-Way (ROW) WO 6355623. TEP to trench & install 700' of conduit & cable. All pavement and concrete to be replaced as required. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 7. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 9. MAINTAIN PEDESTRIAN ACCESS 10. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722
T22RW02982 Complete 08/19/2022 01/03/2023 Right-of-Way (ROW) Closure of paved walking/bike path to facilitate construction of new access to TEP Substation (new c
T21BU00372 In Revision 07/29/2021 N/A Commercial Building CMU Screen Wall for Substation - Structural
TR-UTL-0623-01845 Denied 06/22/2023 N/A Right-of-Way (ROW) - Utility DENIED - Duplicate permit request, Active permit for project already exists( TR-UTL-0223-00883) - Submit request for extension/renewal, after completion of Pre-Activity Meeting scheduled thru the portal. RE: Permit TR-UTL-0223-00883: WO 6355623. TEP to trench & install 700' of conduit & cable. All pavement and concrete to be replaced as required.
DP21-0116 Approved 05/04/2021 N/A Development Package Site/Grading/Swppp - TEP Patriot Substation.
TR-UTL-0223-00883 Complete 02/15/2023 06/11/2023 Right-of-Way (ROW) - Utility RE: Permit T22RW03436: WO 6355623. TEP to trench & install 700' of conduit & cable. All pavement and concrete to be replaced as required.
TR-UTL-0124-00112 Withdrawn 01/17/2024 N/A Right-of-Way (ROW) - Utility Updated TCP for changes and hours of work
T21CM06149 VOID 07/29/2021 N/A COMBO CMU Screen Wall for Substation - Structural

Plans

Address: 6980 E ESCALANTE RD
Date - 12/08/2025 5:54 p.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
T21SE00006 APPROVED 04/10/2021 N/A Zoning Examiner Full Notice -- ZEFNP

Record Requests

Address: 6980 E ESCALANTE RD
Date - 12/08/2025 5:54 p.m.
Total Number Of Requests - (3)
Request Number Status Request Date Completed Date Type Description
REQ-0324-01832 Complete 03/05/2024 03/05/2024 Requests No longer required
REQ-0523-02873 Denied 05/23/2023 N/A Requests Denied - No pre-activity meeting scheduled via the online portal. - (RENEW FOR 90 DAYS, JOB IS STILL IN PROGRESS) RE: Permit T22RW03436: WO 6355623. TEP to trench & install 700' of conduit & cable. All pavement and concrete to be replaced as required.
REQ-1222-00427 Complete 12/15/2022 12/30/2022 Requests (PLEASE RENEW FOR 60 DAYS) WO 6355623. TEP to trench & install 700' of conduit & cable.All pavement and concrete to be replac; Work Order: 63555623