Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP19-0103
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/10/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
06/06/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Paving, Grading & Drainage for Rio Del Sol Apartments Development Package (1st Review) 5761 S. Park Avenue DP19-0103 - C-1 / C-2 Zoning TRANSMITTAL DATE: June 6, 2019 DUE DATE: June 10, 2019 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 26, 2020. 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 1. COMMENT: Provide the development package case number, DP19-0103, adjacent to the title block on each sheet. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. 2. COMMENT: Add a general note on sheets 2 and 3 indicating the maximum Cross slope at 2% and Longitudinal Slopes at 5%. If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Grading, Paving and Drainage Development package |
06/10/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | ADMINISTRATIVE MANUAL 4.1 Identification and Descriptive Data Provide the development package case number, DP19-0103, adjacent to the title block on each sheet. Ensure that all Engineering & Zoning comments and concerns are addressed. |
06/11/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. The fee balance is $0 (zero). Activity Number: DP19-0103 Project Description: GRADING - Rio Del Sol Apartments. For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) After all corrections are made, please name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to) 2) Complete Plan Set (all pages, full set) 3) Any other items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. Thank you. Sharon Beasley, Permit Technician City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
06/11/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Revise driveway returns for driveway to Milton Road to provide for headers instead of vertical curb since there is no curb in the adjacent right-of-way. Revise curb access ramps accordingly. 2. Provide a complete SWPPP report with the resubmittal. |