Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 14025008A
Parcel Search
Parcel Attributes
Parcel | 14025008A |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-1, C-2 |
Tucson Ward | Ward 5 |
Tucson Registered Neighborhood | Copper Vista |
Major Streets & Routes | Arterial or Collector ,Intersection Buffer |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Annexations & Original City Zoning (OCZ)
Date - 02/05/2025 1:02 p.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 02/05/2025 1:02 p.m.
Total Number Of Special Development Permits - (3)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
T18SA00245 | Complete | N/A | |||
T20SA00179 | Complete | N/A | Zoning Compliance Letter proposed multifamily | ||
T20SA00323 | Complete | N/A | Zoning Compliance Letter Multifamily |
Permits
Parcel Number - 14025008A
Date - 02/05/2025 1:02 p.m.
Total Number Of Permits - (122)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0123-00235 | Withdrawn | 01/10/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | Install new HC ramp at Milton and Park, install approx 320' new sidewalk along Milton Street, install 60' curb and new 24'wide by 24' deep concrete entrance Permit Update 5/24/2024: Request to be withdrawn. |
TR-ROW-0123-00236 | Complete | 01/10/2023 | 04/28/2023 | BLDG 1 | Right-of-Way (ROW) | Install new entrance on Park Ave new HC ramps and sidewalk and new curb for entrance |
TR-ROW-0123-00237 | Complete | 01/10/2023 | 03/08/2023 | BLDG 1 | Right-of-Way (ROW) | Renew Existing Permit T22RW03004 and add traffic control plan change- remove existing curb at Drexel and replace with new approx 300' curb,saw cut asphalt remove curb and replace with new and asphalt patch |
TR-ROW-0224-00151 | Denied | 02/12/2024 | N/A | Right-of-Way (ROW) | (Permit request Denied on 2/14/2024) - Place artificial turf in the ROW instead of decomposed granite. | |
TR-UTL-0323-01084 | Complete | 03/14/2023 | 05/27/2023 | Right-of-Way (ROW) - Utility | **RUSH REQUEST** WO 6297709 - TEP to complete 3 primary risers. | |
TC-CFO-0324-00070 | Denied | 03/20/2024 | N/A | BLDG 4 | Certificate of Occupancy | Final C of O issued Separate permit for Clubhouse( 2071 sf) which is part of Building 4 T20CM03401- Plan attached to T20CM03330 |
DP19-0103 | Complete | 04/26/2019 | 09/18/2026 | Development Package | GRADING - Rio Del Sol Apartments. | |
TC-CFO-0623-00075 | Issued | 06/01/2023 | 08/09/2023 | 2 | Certificate of Occupancy | NEW MULTI FAMILY |
TC-CFO-0623-00076 | Issued | 06/01/2023 | 09/09/2023 | 3 | Certificate of Occupancy | NEW MULTI FAMILY |
T20CM03330 | Complete | 06/02/2020 | 03/16/2024 | BLDG 1 | Commercial Building | NEW MULTI FAMILY: 19-Unit Apartment Builiding |
T20CM03399 | Complete | 06/04/2020 | 12/04/2023 | BLDG 2 | Commercial Building | NEW MULTI FAMILY |
T20CM03400 | Complete | 06/04/2020 | 12/04/2023 | BLDG 3 | Commercial Building | NEW MULTI FAMILY |
T20CM03401 | Complete | 06/04/2020 | 03/16/2024 | BLDG 4 | Commercial Building | NEW MULTI FAMILY |
T20CM03402 | Complete | 06/04/2020 | 03/13/2024 | BLDG 5 | Commercial Building | NEW MULTI FAMILY |
T20CM03403 | Complete | 06/04/2020 | 01/29/2024 | BLDG 6 | Commercial Building | NEW MULTI FAMILY |
T18OT00603 | Submitted | 06/06/2018 | N/A | Floodplain Use | Floodplian Zone Status Form | |
T22RW02072 | Complete | 06/08/2022 | 08/09/2022 | Right-of-Way (ROW) | INSTALL 18" STORM PIPE FROM STORM BASIN IN TO EXISTING C.O.T. 36' STORM DRAIN PIPE | |
TC-CFO-0623-00081 | Complete | 06/08/2023 | 09/09/2023 | 1 | Certificate of Occupancy | NEW MULTI FAMILY: 19-Unit Apartment Builiding |
TC-CFO-0723-00099 | Complete | 07/25/2023 | 09/03/2023 | BLDG 5 | Certificate of Occupancy | NEW MULTI-FAMILY |
TC-CFO-0723-00100 | Issued | 07/25/2023 | 09/01/2023 | 4 | Certificate of Occupancy | NEW MULTI FAMILY |
T22CM05890 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1101 | Commercial Building | Solar PV Panels |
T22CM05891 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1102 | Commercial Building | Solar PV Panels |
T22CM05892 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1105 | Commercial Building | Solar PV Panels |
T22CM05893 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1106 | Commercial Building | Solar PV Panels |
T22CM05894 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1103 | Commercial Building | Solar PV Panels |
T22CM05895 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1104 | Commercial Building | Solar PV Panels |
T22CM05896 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1107 | Commercial Building | Solar PV Panels |
T22CM05897 | Complete | 08/02/2022 | 11/05/2023 | 11109 | Commercial Building | Solar PV Panels |
T22CM05898 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1110 | Commercial Building | Solar PV Panels |
T22CM05899 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1111 | Commercial Building | Solar PV Panels |
T22CM05900 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1112 | Commercial Building | Solar PV Panels |
T22CM05901 | Complete | 08/02/2022 | 11/05/2023 | 11113 | Commercial Building | Solar PV Panels |
T22CM05902 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1114 | Commercial Building | Solar PV Panels |
T22CM05903 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1115 | Commercial Building | Solar PV Panels |
T22CM05904 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1116 | Commercial Building | Solar PV Panels |
T22CM05905 | Complete | 08/02/2022 | 11/05/2023 | 11117 | Commercial Building | Solar PV Panels |
T22CM05906 | Complete | 08/02/2022 | 11/05/2023 | 11118 | Commercial Building | Solar PV Panels |
T22CM05907 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1119 | Commercial Building | Solar PV Panels |
T22CM05908 | Complete | 08/02/2022 | 11/05/2023 | BLDG 1 UNIT 1108 | Commercial Building | Solar PV Panels |
TC-CFO-0823-00106 | Issued | 08/03/2023 | 09/06/2023 | 6 | Certificate of Occupancy | NEW MULTI FAMILY |
T22CM06144 | Issued | 08/11/2022 | 12/05/2023 | BLDG 2 UNIT 2101 | Commercial Building | Solar PV Panels |
T22CM06145 | Issued | 08/11/2022 | 12/05/2023 | BLDG 2 UNIT 2102 | Commercial Building | Solar PV Panels |
T22CM06149 | Issued | 08/11/2022 | 12/05/2023 | BLDG 2 UNIT 2106 | Commercial Building | Solar PV Panels |
T22CM06151 | Issued | 08/11/2022 | 12/05/2023 | BLDG 2 UNIT 2107 | Commercial Building | Solar PV Panels |
T22CM06152 | Issued | 08/11/2022 | 12/05/2023 | BLDG 2 UNIT 2108 | Commercial Building | Solar PV Panels |
T22CM06153 | Issued | 08/11/2022 | 12/05/2023 | BLDG 2 UNIT 2103 | Commercial Building | Solar PV Panels |
T22CM06154 | Issued | 08/11/2022 | 04/25/2023 | BLDG 2 UNIT 2104 | Commercial Building | Solar PV Panels |
T22CM06155 | Issued | 08/11/2022 | 12/05/2023 | BLDG 2 UNIT 2105 | Commercial Building | Solar PV Panels |
T22CM06189 | Issued | 08/12/2022 | 12/11/2023 | BLDG 3 UNIT 3102 | Commercial Building | Solar PV Panels |
T22CM06192 | Issued | 08/12/2022 | 12/11/2023 | BLDG 3 UNIT 3101 | Commercial Building | Solar PV Panels |
T22CM06194 | Issued | 08/12/2022 | 12/11/2023 | BLDG 3 UNIT 3105 | Commercial Building | Solar PV Panels |
T22CM06197 | Issued | 08/12/2022 | 12/05/2023 | 2119 | Commercial Building | Solar PV Panels |
T22CM06198 | Issued | 08/12/2022 | 12/11/2023 | 3107 | Commercial Building | Solar PV Panels |
T22CM06201 | Issued | 08/12/2022 | 12/05/2023 | BLDG 2 UNIT 2113 | Commercial Building | Solar PV Panels |
T22CM06202 | Issued | 08/12/2022 | 12/05/2023 | BLDG 2 UNIT 2118 | Commercial Building | Solar PV Panels |
T22CM06203 | Issued | 08/12/2022 | 12/05/2023 | BLDG 2 UNIT 2116 | Commercial Building | Solar PV Panels |
T22CM06204 | Issued | 08/12/2022 | 12/11/2023 | BLDG 3 UNIT 3103 | Commercial Building | Solar PV Panels |
T22CM06205 | Issued | 08/12/2022 | 12/05/2023 | 2115 | Commercial Building | Solar PV Panels |
T22CM06206 | Issued | 08/12/2022 | 12/05/2023 | BLDG 2 UNIT 2117 | Commercial Building | Solar PV Panels |
T22CM06208 | Issued | 08/12/2022 | 12/11/2023 | BLDG 3 UNIT 3104 | Commercial Building | Solar PV Panels |
T22CM06210 | Issued | 08/13/2022 | 12/11/2023 | BLDG 3 UNIT 3106 | Commercial Building | Solar PV Panels |
T22CM06211 | Issued | 08/13/2022 | 12/05/2023 | BLDG 2 UNIT 2114 | Commercial Building | Solar PV Panels |
T22CM06212 | Issued | 08/13/2022 | 12/05/2023 | BLDG 2 UNIT 2110 | Commercial Building | Solar PV Panels |
T22CM06213 | Issued | 08/13/2022 | 12/05/2023 | 2112 | Commercial Building | Solar PV Panels |
T22CM06214 | Issued | 08/13/2022 | 12/05/2023 | BLDG 2 UNIT 2111 | Commercial Building | Solar PV Panels |
T22CM06215 | Issued | 08/13/2022 | 12/05/2023 | BLDG 2 UNIT 2109 | Commercial Building | Solar PV Panels |
T22CM06216 | Issued | 08/13/2022 | 12/11/2023 | BLDG 3 UNIT 3108 | Commercial Building | Solar PV Panels |
T22CM06217 | Issued | 08/13/2022 | 12/11/2023 | 3113 | Commercial Building | Solar PV Panels |
T22CM06218 | Issued | 08/13/2022 | 12/11/2023 | BLDG 3 UNIT 3111 | Commercial Building | Solar PV Panels |
T22CM06219 | Issued | 08/13/2022 | 12/11/2023 | BLDG 3 UNIT 3110 | Commercial Building | Solar PV Panels |
T22CM06220 | Issued | 08/13/2022 | 12/11/2023 | BLDG 3 UNIT 3109 | Commercial Building | Solar PV Panels |
T22CM06221 | Issued | 08/13/2022 | 12/11/2023 | BLDG 3 UNIT 3112 | Commercial Building | Solar PV Panels |
TC-CFO-0823-00114 | Complete | 08/14/2023 | 09/28/2023 | BLDG 4 | Certificate of Occupancy | Separate permit for Clubhouse( 2071 sf) which is part of Building 4 T20CM03401- Plan attached to T20CM03330 |
T22RW03004 | Complete | 08/20/2022 | 01/14/2023 | Right-of-Way (ROW) | INSTALLATION OF APPROX. 670 LF OF NEW SIDEWALK ALONG DREXEL RD AND JEANETTE BL PER APPROVED DP18-02 | |
TC-COM-0923-02183 | Complete | 09/08/2023 | 07/28/2024 | Commercial Building | Splash Pad | |
DP18-0225 | Complete | 09/10/2018 | 06/28/2027 | Development Package | E SITE - Rio Del Sol Apartments, new multi-family residential. | |
TZ-CMP-0924-00132 | Complete | 09/11/2024 | N/A | Zoning Compliance | Please see attached. | |
TZ-CMP-0924-00136 | Complete | 09/17/2024 | N/A | BLDG 1 UNIT 1112 | Zoning Compliance | Please see attached. |
T22CM07733 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6113 | Commercial Building | Solar Panels |
T22CM07734 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6112 | Commercial Building | Solar Panels |
T22CM07735 | Issued | 10/10/2022 | 01/27/2024 | 6111 | Commercial Building | Solar Panels |
T22CM07736 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6110 | Commercial Building | Solar Panels |
T22CM07737 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6109 | Commercial Building | Solar Panels |
T22CM07738 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6108 | Commercial Building | Solar Panels |
T22CM07739 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6114 | Commercial Building | Solar Panels |
T22CM07740 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6106 | Commercial Building | Solar Panels |
T22CM07741 | Issued | 10/10/2022 | 01/27/2024 | 6105 | Commercial Building | Solar Panels |
T22CM07742 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6107 | Commercial Building | Solar Panels |
T22CM07743 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6103 | Commercial Building | Solar Panels |
T22CM07744 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6102 | Commercial Building | Solar Panels |
T22CM07745 | Issued | 10/10/2022 | 01/27/2024 | 6101 | Commercial Building | Solar Panels |
T22CM07747 | Issued | 10/10/2022 | 01/27/2024 | BLDG 6 UNIT 6104 | Commercial Building | Solar Panels |
T22CM07749 | Issued | 10/10/2022 | 01/06/2024 | BLDG 5 UNIT 5114 | Commercial Building | Solar Panels |
T22CM07750 | Issued | 10/10/2022 | 01/06/2024 | BLDG 5 UNIT 5113 | Commercial Building | Solar Panels |
T22CM07751 | Issued | 10/10/2022 | 01/06/2024 | BLDG 5 UNIT 5112 | Commercial Building | Solar Panels |
T22CM07752 | Issued | 10/10/2022 | 01/06/2024 | BLDG 5 UNIT 5111 | Commercial Building | Solar Panels |
T22CM07753 | Issued | 10/10/2022 | 01/06/2024 | BLDG 5 UNIT 5109 | Commercial Building | Solar Panels |
T22CM07754 | Issued | 10/10/2022 | 01/06/2024 | BLDG 5 UNIT 5110 | Commercial Building | Solar Panels |
T22CM07853 | Issued | 10/13/2022 | 01/06/2024 | BLDG 5 UNIT 5108 | Commercial Building | Solar Panels |
T22CM07854 | Issued | 10/13/2022 | 01/06/2024 | BLDG 5 UNIT 5106 | Commercial Building | Solar Panels |
T22CM07855 | Issued | 10/13/2022 | 01/06/2024 | BLDG 5 UNIT 5103 | Commercial Building | Solar Panels |
T22CM07858 | Issued | 10/13/2022 | 01/06/2024 | BLDG 5 UNIT 5102 | Commercial Building | Solar Panels |
T22CM07859 | Issued | 10/13/2022 | 01/06/2024 | 5101 | Commercial Building | Solar Panels |
T22CM07862 | Issued | 10/13/2022 | 01/06/2024 | BLDG 4 UNIT 4109 | Commercial Building | Solar Panels |
T22CM07863 | Issued | 10/13/2022 | 01/06/2024 | BLDG 4 UNIT 4107 | Commercial Building | Solar Panels |
T22CM07864 | Issued | 10/13/2022 | 01/06/2024 | 4105 | Commercial Building | Solar Panels |
T22CM07866 | Issued | 10/13/2022 | 01/06/2024 | BLDG 5 UNIT 5107 | Commercial Building | Solar Panels |
T22CM07868 | Issued | 10/13/2022 | 01/06/2024 | 5105 | Commercial Building | Solar Panels |
T22CM07871 | Issued | 10/14/2022 | 01/06/2024 | BLDG 4 UNIT 4108 | Commercial Building | Solar Panels |
T22CM07872 | Issued | 10/14/2022 | 01/06/2024 | 4110 | Commercial Building | Solar Panels |
T22CM07873 | Issued | 10/14/2022 | 01/06/2024 | 4106 | Commercial Building | Solar Panels |
T22CM07874 | Issued | 10/14/2022 | 01/06/2024 | BLDG 5 UNIT 5104 | Commercial Building | Solar Panels |
T22CM07875 | Issued | 10/14/2022 | 01/06/2024 | BLDG 4 UNIT 4104 | Commercial Building | Solar Panels |
T22CM07876 | Issued | 10/14/2022 | 01/06/2024 | BLDG 4 UNIT 4102 | Commercial Building | Solar Panels |
T22CM07877 | Issued | 10/14/2022 | 01/06/2024 | BLDG 4 UNIT 4103 | Commercial Building | Solar Panels |
T22CM07878 | Issued | 10/14/2022 | 01/06/2024 | BLDG 4 UNIT 4101 | Commercial Building | Solar Panels |
T22CM07903 | Issued | 10/14/2022 | 02/26/2024 | Commercial Building | Solar Permit | |
T20CM09030 | Complete | 12/24/2020 | 02/10/2024 | BLDG 4 | Commercial Building | Separate permit for Clubhouse( 2071 sf) which is part of Building 4 T20CM03401- Plan attached to T20CM03330 |
T21RW01992 | Final | 04/26/2021 | 07/05/2021 | ROW | TEP to replace existing wood pole with steel pole. NOTE: Proof of notification is required at the time of the preconstruction meeting. | |
T21RW03039 | Final | 06/23/2021 | 12/10/2021 | ROW | ON EAST END OF PROPERTY ADDRESS, EXCAVATE 30 LF INTO S JEANNETTE BLVD AT TWO LOCATIONS, INSTALL TWO NEW MANHOLES AND INSTALL 8" SEWER. COMPLETE CLOSURE ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW03081 | Final | 06/24/2021 | 01/10/2022 | ROW | EXCAVATE 20 LF INTO E MILTON RD, CORE MANHOLE AND INSTALL 8" SEWER. COMPLETE CLOSURE OF E MILTON RD BETWEEN E DREXEL AND E JEANETTE BL. ASSOCIATED DEV PKG: DP18-0225 Proof of notification is required at the time of the preconstruction meeting. | |
T21RW03889 | Final | 08/20/2021 | 05/30/2022 | ROW | TUCSON WATER PLAN NUMBER P21PW00082 FOR RIO DEL SOL APARTMENTS DIG APPROX 30' FROM NORTH PROPERTY LINE INTO DREXEL ROAD FOR 8" WATER MAIN CONNECTION TO EXISTING MAIN. DIG APPROX 25' FROM EAST PROPERTY LINE INTO S. JENETTE BLVD FOR 8" WATER MAIN TIE INTO EXISTING 6" MAIN. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 9. MAINTAIN PEDESTRIAN ACCESS |
Code Enforcement
Parcel Number - 14025008A
Date - 02/05/2025 1:02 p.m.
Total Number Of Code Cases - 3
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO0124-00385 | Citation | 01/25/2024 | N/A | Code Enforcement Case | CWOP: installation of artificial turf at three locations without DTM ROW permits. This installation is not allowable. | |
T19DV07004 | Complian | 09/04/2019 | N/A | DNR_VIOL | HOMELESS CAMPS | |
T21DV06218 | Referred | 09/08/2021 | N/A | DNR_VIOL | weeds and brush are not being maintained |