Permit Details

Status:
Complete
Type:
Development Package
Address:
5761 S PARK AV
Address NEW:
5761 S PARK AV
Apply Date:
04/26/2019
Applicant:
Gregory Moore
Description:
GRADING - Rio Del Sol Apartments.

Permit Reviews

Permit Number - DP19-0103
Permit Status: Complete
Permit Description: GRADING - Rio Del Sol Apartments.
Start Date Submittal Complete Date Status  
03/28/2019 DEV PKG - OK TO SUBMIT (GRADING ONLY) 05/03/2019 COMPLETED Review Details
04/10/2019 DEV PKG - OK TO SUBMIT (GRADING ONLY) 05/10/2019 COMPLETED Review Details
05/10/2019 DEV PKG 06/11/2019 COMPLETED Review Details
06/17/2019 DEV PKG - RESUBMITTAL 06/19/2019 COMPLETED Review Details
03/13/2023 DEVELOPMENT PACKAGE REVIEW v.2 03/28/2023 APPROVED Review Details
02/01/2023 DEVELOPMENT PACKAGE REVIEW v.1 03/10/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP19-0103
Permite Description: GRADING - Rio Del Sol Apartments.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
02/05/2021 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 02/05/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, TRACK-OUT ROCK NEEDS TO BE INSTALLED AT ENTRANCES}
08/03/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 08/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN / NO CHANGES AS OF TODAY} ; {Activity date: 03/30/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN HAVES NOT STARTED THE INSTALLATION OF THE STORM DRAIN YET .} ; {Activity date: 11/01/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN / GOOD AT IS TIME}
01/17/2023 ENGR Grading Final N/A Complete (Recurring) Install the rebar for the floor for trash enclosure it’s raining today can I pour concrete today. Need to remove the water that’s on the floor before pouring
PDSD Site/Engineering Division - Landscaping N/A Requested
07/21/2023 ENGR Engineering Final N/A Complete (Recurring) Complete all work is shown on the site on the approved plans prior to calling this inspection in for a final

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0103
Permit Description: GRADING - Rio Del Sol Apartments.
Total Completed Inspections - 6
Date Description Inspector Results Comments
02/05/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/05/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 01/25/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE NO ONE ON SITE}
05/25/2023 SITE - Stormwater Final Inspection Passed
05/25/2023 PDSD Site/Engineering Division - NPPO Passed
07/20/2023 ENGR Grading Final Passed
09/19/2023 ENGR Engineering Final Passed
09/19/2023 COT - ENGR - Signage Final Passed