Permit Number: DP17-0134
Parcel: 14026011A

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP17-0134
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/13/2017 KROBLES1 START PLANS SUBMITTED Completed
06/15/2017 LOREN MAKUS ENGINEERING REVIEW Approved
06/15/2017 MARTIN BROWN FIRE REVIEW Approved
06/16/2017 PGEHLEN1 PIMA COUNTY WASTEWATER Passed Per e-mail in SIRE
06/16/2017 SSHIELD1 HC SITE REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principal Planner

PROJECT: Atlas Copco Expansion - Phase 1
Development Package Accessiblity (1st Review)
DP17-0

TRANSMITTAL DATE: June 16, 2017

DUE DATE: July 12, 2017

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 12, 2018.

2-06.4.0 CONTENT REQUIREMENTS

1. 2-06.4.3 - Provide the development package case number, DP17-0134, adjacent to the title block on all sheets.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2. 2-06.4.9.R - The accessible route shown on the plan does not match what is shown on the most current aerial photo.

Once the above comments are addressed an over-the-counter review may be scheduled. Call or email to schedule an appointment for this review.

If you have any questions about this transmittal, please Name, (520) 837-PHONE or email@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/19/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/19/2017 ALEXANDRA HINES OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approv-Cond June 16, 2017

Dear Ms. Gelen,

Thank you for the opportunity to comment on DP17-0134, Atlas Copco Expansion; 1st Submittal, a development package application for an approximately 0.08 acre site located northwest of the intersection of East Wieding Road and South Sears Boulevard. The proposed land use is industrial.

This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, FAA Part 77 airspace, and the City of Tucson Airport Hazard District.

The Tucson Airport Authority conditionally approves the subject request contingent upon the following condition of approval, as noted below. This condition should be identified in the general notes of the approved development plan.

Conditions of approval:

"The applicant shall file Form 7460 with the FAA at least 45 days before construction activities begin. Any cranes used for the project must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"

"That development shall not cause or potentially affect aviation in the vicinity of the site, including but not limited to, physical obstructions to aircraft operations, interference with operations by way of electrical static, visual obstructions through emissions or glare, and/or the open storage of petroleum products, explosive materials, or materials which attract or lead to the concentration of wildlife."

"That prior to the City's approval of any construction permit for a permanent building, the property owner shall record the Avigation Easement which discloses the existence, and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The content of such documents shall be according to the form and instructions provided."

The current property owner or person authorized to sign on behalf of the current property owner shall complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder's Office. Once the Avigation Easement is recorded please send a copy of the recorded easement to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below.

Scott Robidoux
Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756



Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.

Respectfully,


Scott Robidoux,
Airport Planner

cc file
06/20/2017 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change Please resubmit the comment response letter and two sets of the plans.
06/20/2017 PATRICIA GEHLEN ZONING REVIEW Reqs Change Zoning Review:

1) Remove max building height for note 21

2) Correct street setbacks. They are not 1 foot. Correct in notes and on plan sheets (pages 2 & 3).

3) Correct building expansion calculation. Enclosed outdoor storage area what not in the calculation on the last approve site plan

4) Correct typo in rezoning condition #10

5) What will be on the new concrete pad shown east of the exisitng building?


With an appointment, I will do the final review for Zoning and TAA over the counter.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/26/2017 ARUIZ1 OUT TO CUSTOMER Completed