Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 14026011A
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 02/25/2025 1:53 p.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 02/25/2025 1:53 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-82-64 | New Spain Investment - Campbell Avenue | P-I | Effectuated | 09/16/2010 | S CAMPBELL |
Permits
Parcel Number - 14026011A
Date - 02/25/2025 1:53 p.m.
Total Number Of Permits - (35)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FCP-0124-00017 | Complete | 01/08/2024 | 07/17/2024 | BLDG 1 | Fire Construction Permit | install a cellular transmitter to monitor the existing building fire alarm |
TR-UTL-0124-00129 | Complete | 01/22/2024 | 03/23/2024 | Right-of-Way (ROW) - Utility | (1) 4' x 4' bell hole in pavement along with an approx. 2' x 18' trench in pavement for new gas services | |
DS18-06 | Approved | 02/20/2018 | N/A | Zoning Compliance | ATLAS COPCO - TSMR PAG DETAIL AT ATLAS COPCO | |
TF-FCP-0324-00212 | Complete | 03/18/2024 | 09/28/2024 | BLDG 2 | Fire Construction Permit | Offsite monitoring of the existing fire panel at this location |
TC-CFO-0424-00086 | Denied | 04/17/2024 | N/A | BLDG 2 | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from a Engineering Inspector AND the level of occupancy for the building. Please schedule Site Engineering Final. Once you get the okay from Engineering inspector please re-request TCO. New Service Facility |
TC-CFO-0424-00089 | Denied | 04/25/2024 | N/A | BLDG 2 | Certificate of Occupancy | This project needs the okay for a Temp Certificate of Occupancy from a Engineering Inspector and level for the building. Please schedule engineering final for this project and re-request Temporary Certificate of Occupancy when ready. New Service Facility |
TR-UTL-0523-01457 | Issued | 05/04/2023 | 07/14/2023 | Right-of-Way (ROW) - Utility | Install Environmental Monitoring Well- 100'Dx2'W. 0700AM-1530PM - WELL OWNER-Morris Air National Guard Base *** | |
TF-FCP-0623-00736 | Complete | 06/05/2023 | 06/27/2024 | BLDG 2 | Fire Construction Permit | New fire sprinkler system for ground up construction. |
DP17-0134 | Complete | 06/13/2017 | 02/19/2018 | Development Package | SITE | |
TF-FCP-0623-00796 | Complete | 06/22/2023 | 01/27/2024 | BLDG 2 | Fire Construction Permit | New Fire Alarm. Dedicated Function Sprinkler Monitor Plus Evacuation. |
TR-UTL-0623-01893 | Complete | 06/28/2023 | 08/05/2023 | Right-of-Way (ROW) - Utility | Installing 8" Fire protection Service and 1" water service with 1" potable water meter | |
DP17-0174 | Complete | 07/17/2017 | 09/29/2018 | Development Package | SITE/GRADING - ATLAS COPCO EXPANSION PHASES II & IIIOriginal Approval 09/28/2017 (11 pages)1 | |
TR-ROW-0723-01016 | Issued | 07/28/2023 | 12/06/2023 | Right-of-Way (ROW) | New Sewer Connection for New One Story Building | |
TR-UTL-0723-02152 | Complete | 07/28/2023 | 10/16/2023 | Right-of-Way (ROW) - Utility | Install Environmental Monitoring Well- 100'Dx2'W. 0700AM-1530PM - WELL OWNER-Morris Air National Guard Base ***PREV PERMIT - TR-UTL- 0523-01457 | |
TF-FCP-0823-01021 | Complete | 08/22/2023 | 03/05/2024 | BLDG 2 | Fire Construction Permit | Installation of 115 LF of 8" C900 for fire line |
TS-PRM-0924-00399 | Issued | 09/09/2024 | 03/08/2025 | BLDG 2 | Sign - Permanent | Fabricate and Install Illuminated Channel Letters |
DP22-0266 | Complete | 09/26/2022 | 04/30/2027 | Development Package | Site/Grading - Epiroc, Phase 3. New industrial building. | |
DP13-0201 | Complete | 10/11/2013 | 07/27/2020 | Development Package | DPOriginal drawings stamped were the incorrect set. Correct set stamped and layered on the inco | |
DP12-0192 | Complete | 10/24/2012 | 09/15/2013 | Development Package | SITE/GRADING PLAN FOR T12TUP0021 | |
TR-UTL-1023-02762 | Complete | 10/24/2023 | 12/03/2023 | Right-of-Way (ROW) - Utility | Fire Hydrant Repair | |
TC-COM-1122-00067 | Complete | 11/08/2022 | 10/27/2024 | BLDG 2 | Commercial Building | New Service Facility |
T17FC01047 | Expired | 12/27/2017 | 07/11/2018 | Fire Construction Permit | Automatic Fire Extingshing Sys - Extend existing Fire Sprinkler System to new addition | |
TR-UTL-1222-00532 | Complete | 12/29/2022 | 04/28/2023 | Right-of-Way (ROW) - Utility | PRJ239084-1: Cox to Pull 109' through existing conduit, Overlash 1463' to existing aerial, trench 4' and bore 49' to install CATV conduit and place vault for system tie. | |
T16RW01109 | Void | 08/17/2016 | N/A | ROW | TEP TO INSTALL EQUIPMENT ON EXISTING POLE WORK ORDER # 6125865 | |
T17CM04587 | C of o | 06/13/2017 | 03/06/2018 | COMBO | ADDITION; ATLAS COPCO | |
T17CM05428 | Void | 07/17/2017 | N/A | COMBO | NEW CANOPY, PARKING LOT & BLDG EXPANSION | |
T17CM06300 | C of o | 08/16/2017 | 10/02/2018 | COMBO | CONSTRUCTION EQUIPMENT WHOLESALE | |
T17CM08408 | Expired | 11/09/2017 | 06/04/2018 | COMBO | STORAGE RACKS | |
T17FC00594 | Final | 07/24/2017 | 02/07/2018 | FIRECONS | REPLACE 165 UPRIGHT SPRINKLERS & ADD 5 SIDEWALLS FOR RACK STORAGE | |
T17FC00597 | Final | 07/24/2017 | 02/19/2018 | FIRECONS | Add Notificationb to Tenant TI - 7 Devices | |
T17RW04592 | Final | 10/17/2017 | 12/15/2017 | ROW | DEMO AND REMOVAL OF (3) EXISTING APPROACHES AND CONSTRUCT (1) NEW DP17-0174 | |
T18FC00036 | Final | 01/10/2018 | 07/17/2018 | FIRECONS | ADD HORN STROBES TO EXISTING SYSTEM. | |
T18RW00134 | Final | 01/04/2018 | 03/09/2018 | ROW | WORKING WITHOUT A PEMIT. DRIVEWAY INSTALL DOES NOT MEET CODE. WIDENING THE RADIUS OF 3 EXISTING APPROACHES AND CUT/PAVE 1 NEW APPROACH. HANDICAP RAMPS TO TIE INTO EXISTING SIDEWALKS DP17-0174 | |
T20CM07356 | L of c | 10/26/2020 | 08/23/2021 | COMBO | HVAC UPGRADE | |
T21RW04879 | Final | 11/02/2021 | 04/01/2022 | ROW | CREW TO PERFORM AERIAL MAINTENANCE ON EXISTING POLE 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 |
Plans
Parcel Number - 14026011A
Date - 02/25/2025 1:53 p.m.
Total Number Of Plans - 7
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-17-0174 | Active | 07/17/2017 | 09/29/2018 | Basin | SITE/GRADING - ATLAS COPCO EXPANSION PHASES II & IIIOriginal Approval 09/28/2017 (11 pages)1 | |
CWH-22-0266 | Submitted | 09/26/2022 | 09/26/2023 | Basin | Site/Grading - Epiroc, Phase 3. New industrial building. | |
T05BA00598 | Approved | 12/12/2005 | N/A | Basin | ||
T17BA00007 | Approved | 11/09/2017 | N/A | Basin | ||
T17BA00008 | Approved | 11/09/2017 | N/A | Basin | ||
T17BA00009 | Approved | 11/13/2017 | N/A | Basin | ||
TE-BAS-0923-00180 | Active | 09/05/2023 | N/A | Basin | Site/Grading - Epiroc, Phase 3. New industrial building. |