Plan Number: TW-PLAN-0326-0003
Parcel: 14122004U

Review Status: Approved

Review Details: TWPE 90% DESIGN REVIEW v.1

Plan Number - TW-PLAN-0326-0003
Review Name: TWPE 90% DESIGN REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
TWPE Operations APPROVED Remove chemical static mixer from plans; Also possibly utilize existing chlorine hut and cement secondary containment.
TWPE Project Supervisor Oversight APPROVED
TWPE Senior Engineering Associates (SEA) APPROVED
TWPE Well Maintenance APPROVED Please review and acknowledge the comments on page C-10. This review was conducted by AP and MF on April 9, 2026.If you need any additional information, please let us know.
TWPE Civil Engineers (CE) REVIEW COMPLETED
TWPE Electrical REVIEW COMPLETED
TWPE Engineering Manager - Authorization REVIEW COMPLETED
TWPE Engineering Manager Oversight REVIEW COMPLETED
TWPE Instrumentation REVIEW COMPLETED I concur with EMA notes, add and change Mike Abbott submissions
TWPE System Planning REVIEW COMPLETED MOV should be 8". Operations wants flow range 400-1600 gpm. Pump curves reviewed by KGin. Other redlines also completed by KGin.
TWPE Water Treatment REVIEW COMPLETED