Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-0726-01158
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/23/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | DTM Review Comments: Scope of work and impact area - Supports Project to be performed as Night work with Day time Plating of Trenches to maintain safe traffic movement and Access to downtown. Please provide on Site plan and TCPs - Number of Active days closures will be in place. ----- Traffic Control plan - Review Plan for Detail Redline comments. Review and provide additional supporting plans ---- Site Plan - Review and provided location measurements from edge of pavement ---- Provide construction plans for the proposed scope of work Standard Comments – Recent Review Process Updates The following information is required for all permits submitted under the updated City review process: 1. Permit Application: Include the total number of Active ROW (Right-of-Way) impact days for each closure type and location (e.g., right lane, left lane, bike lane, sidewalk, turn bay, etc.). 2. Permit Application / Design Plans: When pavement cuts are proposed, identify the total square yardage of pavement cuts in the Work Detail section of the permit application and on the applicable design, site, or construction plans. 3. Traffic Control Plan (TCP): The TCP shall include: o Total number of Active ROW impact work days. o Total closure length, including: Taper length Buffer space length Work area length Return taper length Bike Lane closure length if different than overall TC closure Pedestrian Detour Route – if different than overall TC closure Plan to call out all Bus Stops and how they are address with in TC closure o Approved work hours based on the applicable ROW closure type. o All other required traffic control details and work area information necessary to clearly define the proposed impacts. Note: This information shall be included with all permit applications moving forward to comply with the City's updated review process and current Permit Fee Schedule. |
||
| 07/27/2026 | Archeological Sensitivity - Standard | REVIEW COMPLETED | Monitoring required | ||
| 07/23/2026 | MITZ District - Standard | REVIEW COMPLETED | |||
| 07/16/2026 | Transportation Application Review Express | REVIEW COMPLETED |