Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TR-ROW-0124-00059
Parcel: 11706077R

Address:
211 N 4TH AV

Review Status: Approved

Review Details: RIGHT-OF-WAY REVIEW v.1

Permit Number - TR-ROW-0124-00059
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
01/25/2024 ROW Engineering Review APPROVED CORRECT THE SIGN SPACING AT SET UP!

1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
7. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES.
8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION
9. MAINTAIN PEDESTRIAN ACCESS

Pavement Cut, No Aerial, No Busses No Moratorium, YES to Striping, Business Access,

1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
2. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY.
3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
7. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES.
9. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION
10. MAINTAIN PEDESTRIAN ACCESS

Pavement Cut, No Aerial, No Busses No Moratorium, No Striping, Ground Repair

1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION
8. MAINTAIN PEDESTRIAN ACCESS

Pavement Cut, No Aerial, No Busses, No Moratorium, No Striping, Business Access,

1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
2. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE.
3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
7. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION
9. MAINTAIN PEDESTRIAN ACCESS
01/16/2024 MITZ District REVIEW COMPLETED Added landscape review
01/16/2024 Transportation Application Review REVIEW COMPLETED
01/17/2024 Transportation Landscape Review REVIEW COMPLETED See notes on plans for comments/questions