Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0124-00026
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Design Review REVIEW COMPLETED Design Professional's preliminary review PDF file has been uploaded, and should be available via TDC Online and PRO. Any questions, please send me an email to maria.gayosso@tucsonaz.gov. Thanks.
Fire New Construction REVIEW COMPLETED TP-PRE-0124-00026 • Pre-Application Conference Review v1 • 812 E SPEEDWAY BL TUCSON, AZ 85719:
Based on the information provided, TFD has the following comments:

1. Verify Aerial Apparatus access, 2018 IFC, D105.1
2. Building to be tested for ERRC by PCWIN, 2018 IFC, 510
3. Provide fire sprinkler systems following 2018 IFC, 903
4. Provide standpipes in accordance with 2018 IFC, 905
5. Provide fire alarm systems per 2018 IFC, 907
6. Hydrant located in accordance with 2018 IFC, 507.5.
7. Provide Knox key box(es) under 2018 IFC, 506

Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
Historic REVIEW COMPLETED Staff is concerned about the 2 remaining historic buildings on the site. (1) Provide information on how the buildings will be protected during construction. (2) There should also be a vibration study during construction to ensure that buildings are not being adversely impacted. Work with Historic staff on the vibrations study. (3) Provide information on how the two houses will be rehabilitated. (4) Also, include information on the wall of the new construction at the north and at the east that appear to be solid concrete. This wall should be softened. (5) Include dimensions on the plans showing the distance between new and historic construction. (6) Historic staff recommends a courtesy review with PRS. Any questions contact jodie.brown@tucsonaz.gov
ROW Engineering Review REVIEW COMPLETED TP-PRE-0124-00026
812 E. Speedway Blvd.

Comments:
1. The existing curb access ramp on the SE corner of Speedway and Euclid must be brought up to current standards, per P.A.G. standard 207.
2. 12’ Sidewalk is acceptable.
3. Any unused curb cuts shall be closed with P.A.G. standard 209 concrete curb and P.A.G. standard 200 concrete sidewalk.
4. A pedestrian access sidewalk is required to tie-in to sidewalk in the Right of Way. This tie-in must meet the ADA Landing requirements. Landings shall be 5’ X 5’ and not to exceed a 2% cross slope in all directions.
5. Protect in place existing streetlights.
6. Show ROW on the DP for both Speedway Blvd and Euclid Ave.

David Stiffey
DTM Project Coordinator
David.Stiffey@tucsonaz.gov
Site Engineering REVIEW COMPLETED Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview
The Stormwater Detention-Retention Manual can be found online at https://www.tucsonaz.gov/files/pdsd/updated-retention-detention-manual/updated-retention-detention-manual.pdf

1. Balanced basin detention and first flush retention will be required for this project.
2. DTM approval will be required for alley access.
3. Clarify if the alley is for primary access.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC/ENTITLEMENTS TRANSMITTAL
PROJECT: MULTI STORY STUDENT HOUSING
ACTIVITY NO. TP-PRE-0323-00156
ADDRESS/PARCEL: MANY
ZONING: HR-1, UOD-1 (MAIN GATE), WEST UNIVERSITY HISTORIC DISTRICT

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards.

GENERALCOMMENTS:
1. It is highly recommened that prior to formal submittal, a meeting is held with the current landscape architect to review the proposed landscape documents to ensure that they meet all of the criteria in the UDC, the rezoning conditions, and the Overlay District.
2. While the Main Gate Overlay does not require commercial rainwater harvesting on site, as part of the PAD Amendment, passive rainwater harvesting will be required to the fullest extent in the Right-Of-Way. Including but not limited to depressed landscaping and street curb cuts to allow for full capture of the roof, hardscape, and street run off from the developed areas. Work with the Landscape Architects from Planning and Development Services as well as Department of Transportation and Mobility to achieve this.
2. There is to be no turf onsite, ornamental or for active recreation.
4. If cisterns are in use, they must be shielded with plants and vegetation.


CDRC COMMENTS:
1. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted or approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval. This is also required by the Main Gate Overlay as well as the Historic overlay on site. See below.
2. A landscape plan is required per 7.6.2.B.1-b. The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10.
3. See Engineering notes for Retention/Detention.
4. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11.
5. Maximize the rainwater harvesting across the site into the landscape areas, including but not limited to the street landscape borders as well as the tree wells for the required trees for the parking lot.
6. There will need to be a separate dedicated water meter for irrigation.
7. Commercial Rainwater Harvesting Plan is not required due to the UOD requirements – see General case notes above


Main Gate Urban Overlay District:
a. Native plants must be preserved in place, trans-planted, or provide a 1:1 mitigation. C-9-a.1 (Section C-9 Landscaping, pg 24)
b. All trees provided in fulfillment of mitigation requirements must be 36” box or larger. C-9.a.2 (Section C-p Landscaping, pg 24)
c. Plants with thorns or terminal spines shall be placed clear of pedestrian circulation. C-9.a.4. (Section C-9 Landscaping pg 24)
d. New species introduced must come from the Arizona Department of Water Resources Drought Tolerant/Low Water Use Plant List; provided, however, that (i) plants excluded from that list may be used on private property in rain gardens or bio-swales as part of active and/or passive landscape water harvesting systems, and (ii) properties in the West University Historic Preservation Zone and/or Contributing Properties to the West University National Register District may use historically significant plant material, including plants that are excluded from the Drought Tolerant/Low Water Use Plant List, if approved by the Director. C-9.b. (Section C-9 Landscaping pg 24)
e. Street trees should be provided at areas of pedestrian circulation or activity and spaced to ensure continuous canopy cover at maturity. C-9.c. (Section C-9 Landscaping pg 24)
f. At least 60% of trees shall be 36” box or larger. C-9.e. (Section C-9 Landscaping pg 24)
g. Accent plants and succulents are recommended for planters and/or containers. C-9.f. (Section C-9 Landscaping pg 24)
h. Massed shrubs and ground covers are encouraged for surface planters. C-9.g. (Section C-9 Landscaping pg 24)
i. Street Trees in the Right-of-Way should be selected from Arizona Department of Water Resources Drought Tolerant/Low Water Use Plant List or approved City of Tucson Street Tree List. C-9.h. (Section C-9 Landscaping pg 24)
j. Street trees planted in the sight visibility triangle shall be 36” box minimum. C-9.i. (Section C-9 Landscaping pg 24)
k. In connection with the development or redevelopment of property in the West University Historic Preservation Zone and/or Contributing Properties to the West University National Register District, property owners shall make reasonable efforts to preserve historically significant trees and shrubs that are at least 50 years old that are located in areas designated for landscaping in development or redevelopment plans. C-9.j. (Section C-9 Landscaping pg 24)
l. Usable open space may be a combination of private and public space as long as the adjacent Right-of-Way (to the curb) and areas outside the building setback areas include usable open space. C-10.b. (Section C-10 Open Space pg 24)
m. Parking areas may not be counted as open space. C-10.c. (Section C-10 Open Space pg 24)
n. Portions of ground-level open space that are not landscaped shall be surfaced in textured concrete, pavers, or other similar small-scaled materials with permeable characteristics. C-10.d. (Section C-10 Open Space pg 24)
o. Areas counted toward open space requirements shall be a minimum 300 square feet with a minimum dimension of 15 feet if open on one side only or 10 feet if open on two or more sides. C-10.e. (Section C-10 Open Space pg 24)
p. The property owner is responsible at all times for maintenance of landscape, hardscape, building architectural elements and site furnishings, including features installed in the public Right-of-Way (i.e., to the curb). C-11.a. (Section C-11 Right of Way pg 25)
q. The property owner shall replace or repair vandalized elements in the Right-of-Way within 48 hours. C-11.b. (Section C-11 Right of Way pg 25)
r. The property owner shall replace dead or missing vegetation in the Right-of-Way within 14 days to ensure full compliance with approved landscape plans. C-11.c. (Section C-11 Right of Way pg 25)
s. Water features are permitted in connection with active water harvesting. C-12.c. (Section C-11 Site Features pg 26)
t. For the purpose of applying active rain water harvesting requirements, Residential Mixed Use shall not be considered Commercial development. (Section C-13 On Site Water Management pg 25) C-13.c.
u. Landscaping shall incorporate passive water harvesting. (Section C-13 On Site Water Management pg 25) C-13.d.
v. Passive water harvesting storage volume may be used to offset threshold retention volume requirements and is permitted to occur in the Right-Of-Way. C-13.e. (subject to approval by the Department of Transportation). (Section C-13 On Site Water Management pg 25)
w. Landscape Irrigation systems shall be designed with smart or central control systems integrated with building systems and combined with soil moisture sensors and monitors. C-13.f. (Section C-13 On Site Water Management pg 25)
x. All piping shall be Schedule 40 PVC up to and including 2.5” and Class 200 PVC for larger lines. C-13.g. (Section C-13 On Site Water Management pg 25)
y. Landscape depressions and curb openings shall be provided to allow water to flow into and out of curb side planters. C-13.h. (Section C-13 On Site Water Management pg 25)
z. Building downspouts shall be directed away from pedestrian circulation areas and sidewalks. C-13.i. (Section C-13 On Site Water Management pg 25)
aa. Standing water may not be more than 6” deep. – Thi sis in regards to passive water harvesting across the site. C-13.j. (Section C-13 On Site Water Management pg 25)
bb. Monolithically installed paving such as concrete may not exceed 50% of total exterior site hardscape area. C-15.b. (Section C-15 Hardscape Materials pg 25)
cc. Hand-placed materials such as modular pavers or natural stone must comprise a minimum of 50% min of the total exterior site hardscape. C-15.c. (Section C-15 Hardscape Materials pg 25)
dd. At least 25% of the total exterior site hardscape must be composed of pervious concrete or permeable pavers as part of a passive landscape water harvesting system. C-15.d. (Section C-15 Hardscape Materials pg 25)
ee. Asphalt may be used in streets, alleys, fire department access areas, driveways and surface parking areas. C-15.e. (Section C-15 Hardscape Materials pg 25)
ff. See Section C-16 #’s 1, 2, 7, 10, 11, & 16as part of the Environmentally Conscious Design Practices.
.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Wyatt Berger, Lead Planner

PROJECT: Thursday Pre-application Conference – TP-PRE-0124-00026
Address: 804-818 East Speedway Boulevard; 1024-1052 North Euclid Avenue
Parcel(s): 115-04-507A, 115-04-505A, 115-04-504A, 115-04-503A, 115-04-5150, 115-04-5120, 115-04-508A, and 115-04-508B
Zoning: HR-1, HR-2, and HR-3
Existing Use: Single-family residential
Proposed Use: Mixed use

TRANSMITTAL DATE: February 14, 2024

COMMENTS:
1. Development must comply with Administrative Manual Section 2-06.0.0 Development Package. Building permits may be submitted concurrently with the development package; however, the development package shall be approved by all reviewers prior to zoning approval of the associated building permits.

2. The project site is located within the West University Historic Preservation Zone and the Main Gate Urban Overlay District. Relevant Main Gate Overlay standards are as follows.

3. Per D.5.h, buildings with frontage on Speedway Boulevard or Euclid Avenue used for residential uses may or may not include some live-work and nonresidential uses as permitted in Section C-2.a. The ground units along Speedway Boulevard and at the corner of Speedway Boulevard and Euclid Avenue shall have storefront style doors and windows to enhance the pedestrian environment.

4. There is no minimum setback within the Urban Overlay District, except: 1) at least 21.5’ from the property line along Speedway Boulevard; and 2) at least 12’ from the property line along Euclid Avenue (page 10).

5. Based on the modifications proposed within TP-MOD-0723-000021, the Speedway and Euclid Master Redevelopment Plan shall comply with the following standards:
a. Redevelopment Plan shall allow for no greater than 74 feet in total building height, subject to height restrictions of 24 feet and 48 feet as shown in Figure 8.B.
b. Ensure compliance with the height and mass transitions and bulk reduction provisions of Section C-17, in addition to the following:
I. Ensure a stepback of six feet at the top of the second floor for 77% of the building frontage along Euclid Avenue is provided.
II. Provide a stepback of 32 feet at the top of the fourth floor for 75% of the building frontage along Euclid Avenue.
III. Ensure a stepback of four feet at the top of the second floor or no higher than 18 feet for 66% of the building frontage along Speedway Boulevard is provided.
IV. Provide a stepback of 55 feet at the top of the fourth floor or no higher than 39 feet for 19% of the building frontage along Speedway Boulevard.
V. Provide a corner stepback of no less than 28 feet in depth from Speedway Boulevard and 19 feet in depth from Euclid Avenue at the northwest corner of the site, at the top of the second floor or no higher than 18 feet.

6. Ensure that height and mass transition standards found within Section C-17 are also met for the proposal.

7. Per Section C-5.1.1.1, 0.5 parking spaces are required per dwelling unit; the greater of two spaces or one space per 2,000 square feet gross floor area (gfa) is required for retail uses; and one space per 1,000 square feet gfa is required for all other non-residential uses.

8. Per Section C-5.b.1, 0.3 short-term bike parking spaces are required per dwelling unit; and the greater of two spaces or one space per 5,000 square feet gfa is required for non-residential uses.

9. Per Section C-5.b.2, 0.3 long-term bicycle parking spaces are required per dwelling unit; and the greater of two spaces or one space per 12,000 square feet gfa is required for non-residential uses. Long-term bicycle parking may be located within each unit.

10. Ensure compliance with the Open Spaces requirements within Section C-10.

11. A lot consolidation request processed with the Pima County Assessor’s Office will be required.

12. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951.
TW New Area Development REVIEW COMPLETED TP-PRE-0124-00026 - Pre-Application Conference Review v1 - 812 E SPEEDWAY BL – Capstone Mixed Use

Tucson Water’s New Area Development Unit has no objections to the proposed development and offers the following comments for your convenience.

1. There is an existing 12” PVC water main on the north side of Speedway Blvd (constructed in 1988 per PN 202-1988), and an existing 4” cast iron water main in Euclid Avenue (constructed in 1940 per FN 361). These existing water mains are shown on Tucson Water’s NW071414 valve map

2. This large project will need to obtain all it’s water from the existing 12” PVC water main on the north side of Speedway Blvd. No connections will be allowed to the 4” cast iron water main in Euclid Avenue.

3. The water pressure in the existing 12” water main is in the 70-77 psi range. An on-site water pressure booster station serving the upper floors may be desirable.

4. After a water fixture unit count has been conducted for the project using the 2018 International Plumbing Code, and the fire flow requirements have been established by the local fire authority, please contact Tucson Water’s New Services section by sending an e-mail to TW_COMMON@tucsonaz.gov to discuss:
a. Potential points of connection to Tucson Water’s existing water distribution system. Please note that hydraulic modeling may need to be performed to verify which potential points of connection have the capacity necessary to serve the proposed development.
b. The number of water service lines, number of water meters and their sizes, and any new fire hydrants and/or fire service lines necessary to serve this development.
c. The advantages and disadvantages of installing the necessary water meters via Tucson Water’s Job Order Contract (JOC) process.

5. If a 3” or larger water meter is needed for this development, the water meter will need to be located within a large meter enclosure that is a minimum of 25’ long x 10’ wide x 5’ high per Tucson Water Standard Detail SD-314. The entire large meter enclosure must be located on the property in a water easement granted to the City of Tucson.

6. Copies of the valve map(s) and ‘as-built’ plans referenced in these comments may be obtained from Tucson Water’s Mapping & GIS Center by sending an e-mail request for them to TWMapInfo@tucsonaz.gov.

The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
310 W. Alameda St.
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106