Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0825-00212
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/12/2025 | Site Engineering Standard | APPROVED | |||
| 09/19/2025 | Site Landscape Standard | APPROVED | |||
| 09/19/2025 | NPPO Standard | NOT REQUIRED | |||
| 09/18/2025 | Site Zoning Standard | NOT REQUIRED | Zoning review not required for charter schools as they are exempt | ||
| 09/22/2025 | Entitlements Standard | REQUIRES RESUBMIT | Submittal requires a decision letter from The Bridges design review committee for approval. Please see Bridges PAD section C.6, pg107 for more information. | ||
| 08/18/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 08/22/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | EXTERNAL REVIEWERS CDRC added, TEP, ENTITLEMENTS, ADOT, TAA, SWG USPS, and PAG to the workflow. Review request email sent to TEP, ENTITLEMENTS, ADOT, and TAA , FYI email sent to, SWG USPS PAG. |
||
| 09/15/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 08/29/2025 | External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | Good Afternoon, ADOT has reviewed this DEV and has no comments. Thank you for the opportunity to review. |
||
| 08/22/2025 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 08/22/2025 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 09/15/2025 | External Reviewers - Tucson Airport Authority Standard | REVIEW COMPLETED | September 12, 2025 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-0825-00212, 1 st Submittal, New connex containers (11) for JTED Construction Technologies, 751 E Tucson Marketplace Blvd, Tucson AZ 85713, Received August 22, 2025 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-0825-00212, 1 st Submittal, a development plan for new storage containers at 751 East Tucson Marketplace Blvd. This development is located in the S.W of the quarter of the N.W. quarter of Section 30, Township 14S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel numbers 132-13-104A and 132-13-104B, covers approximately 6.75 ± acres, and is zoned as Planned Area Development 15 Zone (PAD-15). The nearest major roadway intersection is South Park Avenue and East Tucson Marketplace Boulevard, approximately 1,000 feet to the west of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 1st submittal of this project and is not requiring a resubmittal of this project. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
||
| 09/22/2025 | External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | 4350 E. Irvington Road Post Office Box 711, Tucson, AZ 85702 September 22, 2025 WO#T160858 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: JTED at The Bridges Construction Technologies TD-DEV-0825-00212 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 8/22/2025. There are existing facilities within the development which are depicted upon the plan. There are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Fred Quintero (520) 235-6329 fquintero@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 08/22/2025 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | FYI CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. |
||
| 09/10/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 08/19/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 08/21/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 08/28/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | No ROW improvements required. |