Permit Number: TD-DEV-0725-00181
Parcel: 141186020

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0725-00181
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/15/2025 NPPO Standard APPROVED Add the activity number to all sheets in the site landscape set.

Thank you.
Chad Keller, RLA
chad.keller@tucsonaz.gov
07/21/2025 Traffic Engineering Review Standard APPROVED Only comment relates to the mentioned right turn lane.
08/12/2025 External Reviewers - Pima County Addressing Standard REQUIRES RESUBMIT Reviewer Name Reviewer Email Reviewer Phone
Nicholas Jordan nicholas.jordan@pima.gov 520-724-9623
Report Date: 08/08/2025
Description : Addressing review of TD-DEV-0725-00181 Multi-Building General Merchandise & Food Service/Food & Beverage
Address : , , ,
Record Type : Addressing
Document Filename : SUB1-DP
Reviewer Contact Information:
Corrections in the following table need to be applied before a plan is approved
Review Report - Resubmittal Requested
Application Number: P25AD00551
Comment ID Comment Date Corrections
Needed
Page Ref Reviewer : Department Review Comments
DSD Addressing
1 08/08/252025 Yes 5624_DP-3-Ove
rall Site
Nicholas Jordan : DSD Addressing 10007 E Old Vail RD
2 08/08/252025 Yes 5624_DP-3-Ove
rall Site
Nicholas Jordan : DSD Addressing 10015 E Old Vail RD
3 08/08/252025 Yes 5624_DP-3-Ove
rall Site
Nicholas Jordan : DSD Addressing 10023 E Old Vail RD
General Comments
Pima County Public Works
201 N. Stone Ave.
Tucson, AZ 85701
If you have any questions please call 520- 724-6490 for an appointment to discuss this notice. If following discussions with staff you still disagree with the below listed deficiencies,
you may appeal to the Building Official in accordance with Pima County Code 15.04.060 by submitting the form posted on our web site with payment of appeal fee prior to permit
application expiration. Disputes about the interpretation of the Zoning Code may be appealed to a Pima County Board of Adjustment under A.R.S. § 11 -816 and P.C.C. § 18.93.060.
Please submit all plans, calculations and specifications to us electronically via the Digital Projects page in the online portal.
Comment ID Comment Date Corrections
Needed
Page Ref Reviewer : Department Review Comments
4 08/08/252025 Yes 5624_DP-3-Ove
rall Site
Nicholas Jordan : DSD Addressing 10031 E Old Vail RD
5 08/08/252025 Yes 5624_DP-3-Ove
rall Site
Nicholas Jordan : DSD Addressing 10039 E Old Vail RD
Re-Submittal Procedures
Please submit all documents using Citizen Access at permits.pima.gov (i.e. plans, drawings, calculations, quantities, exhibits, photographs, letters, etc.).
1. Please go to permits.pima.gov and login to your account to access review comments and resubmit.
2. If you have questions or need clarification regarding comments, please contact the reviewer.
3. Provide a response to each correction comment.
4. To resubmit, upload revised full plan set.
Should the resubmittal not completely address this request for corrections, the application maybe denied requiring a new application and payment all applicable
review fees in accordance withA.R.S. § 11-1605.
EV
CAPABLE
EV
INSTALLED
EV
INSTALLED
EV
INSTALLED
EV
CAPABLE
EV
CAPABLE EV INSTALLED EV INSTALLED EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV INSTALLED EV INSTALLED EV INSTALLED
EV
INSTALLED
EV
CAPABLE
Contact Arizona 811 at least two fullworking days before you begin excavationCall 811 or click Arizona811.com10000 EAST OLD VAIL ROADA PORTION OF BLOCK 2 PHASE 2 OF "OLD VAIL PLAZA", A SUBDIVISION ACCORDING TO THE PLAT RECORDED AS SEQ. #20112770309, BEING A PORTION OF SECTION 26, T. 15 S., R. 15 E., G.&S.R.M., CITY OF TUCSON, PIMA COUNTY, ARIZONARegisteredProfessionalEngineer(Civil)
CER TIFIC A T E NO.
. .20ARIZONA,U.S.A.
Da t e Si gned
70059
BLAKE
JUNAK
07 10
25 520-795-1000 rickengineering.com3945 E FORT LOWELL RD #111 TUCSON, AZ 85712 SAN DIEGO ORANGE RIVERSIDE SACRAMENTO SAN LUIS OBISPOSANTA CLARITA PHOENIX TUCSON LAS VEGAS DENVERTD-DEV-____
RELATED CASES: S07-156; DP14-0248 323overall site planSCALE: 1"=60'
FND 1/2" RBR
TAGGED "RLS 19862"
FND 1/2" RBR
TAGGED "RLS 19862"
TO BE SET 1/2" IR RBR
TAGGED "RLS 71039"
FND 1/2" RBR
TAGGED "RLS 17479"
FND 1/2" RBR
TAGGED "RLS
17479"
TO BE SET 1/2" IR RBR
TAGGED "RLS 71039"
SET 1/2" IR RBR
TAGGED "RLS 71039"
TO BE SET 1/2" IR RBR
TAGGED "RLS 71039"
S 67°06'18" E
34.00'
S 50°44'32" E 983.89' N 22°53'43" E 926.70'
549.00' N 67°06'18" W 395.00' S 22°53'56" W 649.52'
S 50°44'32" E 376.23' N 22°53'56" E 579.93'
607.66'
N 67°06'18" W 944.00'
SEE SHEETS 4, 6, 8
SEE SHEETS 5,7,9
NEW 1-STORY
BUILDING #1
FOOD AND BEVERAGE
SALES
AREA=23,024 SF
HEIGHT=38.5'
NEW 1-STORY BUILDING #2
GENERAL MERCHANDISE SALES
AREA=7,200 SF
HEIGHT=38.5' (MAX.)
NEW 1-STORY BUILDING #4
FOOD SERVICE 4,000 SF
GENERAL MERCHANDISE
SALES 5,750 SF
AREA=9,750 SF
HEIGHT=38.5' (MAX.)
FUTURE 1-STORY
BUILDING #5
FOOD SERVICE
AREA=2,400 SF
HEIGHT=38.5' (MAX.)
PUBLIC DRAINAGEWAY
BK. 40, PG. 45, MAPS AND PLATS
E OLD VAIL RD (MS&R)(PUBLIC)
BK. 40, PG. 45, MAPS AND PLATS
N 67°06'18" W 4,034.83'
BASIS OF BEARINGS
N 22°53'56" E
175.58'
OLD VAIL PLAZA
SEQ. #2011270309
I-1
UNSUBDIVIDED
SEQ. #20222280257
I-1
DESERT CROSSINGS AT RITA
RANCH (1-255)
BK. 49, PG. 32
RESIDENTIAL
R-2
OLD VAIL PLAZA
SEQ. #2011270309
COMMERCIAL
I-1
HOUHGTON TOWN CENTER
LOTS 34-53 AND BLOCKS K-N
SEQ. #20231170380
VACANT
PAD-36
NEW 1-STORY BUILDING #3
GENERAL MERCHANDISE SALES
AREA=4,550 SF
HEIGHT=38.5' (MAX.)
19.3' MIN. ACTUAL
BUILDING SETBACK
108' MIN. ACTUAL
BUILDING SETBACK
12.5' MIN. ACTUAL
BUILDING SETBACK
58.9' MIN. ACTUAL
BUILDING SETBACK
DEVELOPMENT
PER FUTURE DP
10' REQUIRED
BUILDING SETBACK
FND BCSM TAGGED
FND 2"BRASS DISC COT "RLS 23956"
PUNCH ONLY S 22°53'42" W
45.00'
TIE-IN 1,600.95' 2,433.88'
10007 E Old Vail RD
10015 E Old Vail RD
10023 E Old Vail RD
10031 E Old Vail RD
10039 E Old Vail RD
08/11/2025 Site Engineering Standard REQUIRES RESUBMIT 1. See that zoning comments are addressed.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/15/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: MULTI-BUILDING GENERAL MERCHANDISE & FOOD SERVICE/FOOD & BEVERAGE
ACTIVITY NO: TD-DEV-0725-00181
ADDRESS: 10000 E OLD VAIL RD
ZONING: I-1 INDUSTRIAL ZONE
LAND USE: COMMERCIAL

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. A quick check of Subwatershed area number 1 using the city water budget table has the percentage at a much higher number than is shown on sheet WH02. Your method does indicate an approvable percentage. I used your plant canopy number and ran my own area calculations for subwatershed and WHIA’s in area number 1. The percentage is 169 using the city water budget spreadsheet. This is a pretty large spread, and this is also just an observation. I left redline numbers on WH01 for your review.

2. Add downspouts and curb cut locations to the note on sheet WH01 that refers to the grading plan sheet.

3. If more of the planting areas cannot be depressed and counted towards your Commercial Rainwater Harvesting calculations, then can all of the planting areas be depressed 4 to 6 inches to catch rainfall only? The depression of all landscape planting areas is something that we would like to see on all sites.

4. Make sure all plant material is within the property limits along the roadway, otherwise DTM will need to review and approve the plans.

5. Provide the development package case number, TD-DEV-0725-00181, adjacent to the title block on all site landscape sheets, per Administrative Manual 2-06.4.3

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
08/08/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 10000 E OLD VAIL RD – Mixed Use
Development Package (1st Review)
TD-DEV-0725-00181

TRANSMITTAL DATE: August 8, 2025

DUE DATE: August 8, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Per UDC Article 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 16, 2026.

-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

1. COMMENT: 2-06.2.2 – Clarify why you are showing development for Building #5 since you are proposing a future DP for this area.

2-06.4.0 CONTENT REQUIREMENTS

2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0725-00181, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A.8 - For development package documents provide:

3. COMMENT: 2-06.4.7.A.8.b – Provide a Floor Area Ratio that meets the requirements of UDC Article 6.4.6.C.2.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

4. COMMENT: 2-06.4.9.E - It appears that a land split is proposed. This split will need to be approved prior to approval of the DP.

5. COMMENT: 2-06.4.9.H.5.a – Clearly demonstrate that the requirements of UDC Article 7.4.6.D.2.b are met for the vehicle parking space south of the cart corral called out on sheet 4, Keynote 39.

6. COMMENT: 2-06.4.9.H.5.a – The EV parking calculation is not correct. Per UDC Article 7.4.11.B.1 The required EVSE parking spaces shall be based upon the total number of parking spaces provided following any approved parking reductions or modifications.

7. COMMENT: 2-06.4.9.H.5.a – The typical parking space detail shows a 3’-0” dimension to what appears to be a wheel stop. The 3’-0” dimension does not meet the requirements of UDC Article 7.4.6.H.3.

8. COMMENT: 2-06.4.9.H.5.c – The loading space calculation shall include the type of space required and provided.

9. COMMENT: 2-06.4.9.H.5.d - The short-term bicycle parking space calculation for the food service use is not correct. Review UDC Table 7.4.8-1 and provide a correct calculation.

10. COMMENT: 2-06.4.9.H.5.d - The short-term bicycle detail shall clearly demonstrate that the requirements of UDC Article 7.4.9.B.2.g are met.

11. COMMENT: 2-06.4.9.L – As cross access with the development to the east is proposed some type of recorded agreement or easement is required. Provide a copy of the recorded document with the next submittal.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
07/11/2025 CDRC Application Completeness Express REVIEW COMPLETED
07/18/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added TEP, Adressing, and SWG USPS, PAG to the workflow. Review request email sent to TEP, Adressing,. FYI email sent to, SWG USPS PAG.
08/08/2025 Commercial Plumbing Standard REVIEW COMPLETED
07/18/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
07/18/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/26/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
August 26, 2025
WO#T160626
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Multi-Building General Merchandise & Food Service/Food & Bev
TD-DEV-0725-00181
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 8/19/2025. There are existing facilities within the development which are
depicted upon the plan. TEP pullbox OVP-10 and high voltage lines appear to be
located in the existing drive, not were indicated on plans, please verify.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Rodriguez
(520) 991-5495
mrodriguez@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
07/18/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
08/04/2025 Fire New Construction Standard REVIEW COMPLETED
07/17/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
07/17/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
07/30/2025 ROW Engineering Review Standard REVIEW COMPLETED