Address Search: 10000 E OLD VAIL RD
Search
Parcel Attributes
| Parcel | 14118602A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-1 |
| Airport Environs Zone | NCZ-A Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 10000 E OLD VAIL RD
Date - 08/20/2026 2:25 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 10000 E OLD VAIL RD
Date - 08/20/2026 2:25 p.m.
Total Number Of Permits - (10)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TZ-PMT-1225-00124 | Expired | 12/24/2025 | N/A | Zoning Permit Annual | Temporary Trailer during course of construction for development package. Site development and 3 buildings. Anticipated start date 1/5/26 Anticipated End Date 9/30/26 | |
| TS-PRM-1025-00438 | Inspections | 10/17/2025 | 01/20/2027 | Sign - Permanent | Install new freestanding signage related to TS-MSP0825-00005 | |
| TC-UTL-1025-00088 | Inspections | 10/06/2025 | 07/29/2026 | Utilities Permit | Multi-Building General Merchandise & Food Service/Food & Beverage | |
| TR-ROW-0824-00986 | Complete | 08/26/2024 | 10/23/2024 | Right-of-Way (ROW) | Obliteration of existing turn lane reinstall dual left | |
| TD-DEV-0725-00181 | Inspections | 07/11/2025 | 08/17/2029 | Development Package | Rev 1 started 11.14.2025 - update to building numbers (5 to 4), footprints, site ** Multi-Building General Merchandise & Food Service/Food & Beverage | |
| TW-DEVCON-0426-0011 | Inspections | 04/24/2026 | 07/27/2026 | TW New Area Development | 10000 East Old Vail Road Buildings 1-4. _ Accepted & signed by NAD. Permit created 4/2026. | |
| TR-UTL-0426-00699 | Complete | 04/22/2026 | 06/28/2026 | Right-of-Way (ROW) - Utility | Install 2 tie ins for new plastic main for commercial development. Work will be open trench in dirt. | |
| TR-ROW-0326-00290 | Inspections | 03/13/2026 | 07/01/2026 | Right-of-Way (ROW) | Demolition of existing curb and sidewalk to tie in new drive entry. | |
| TF-FCP-0226-00121 | Issued | 02/24/2026 | 09/18/2026 | Fire Construction Permit | New Fire Lite alarm install | |
| TF-FCP-0226-00105 | Complete | 02/17/2026 | 08/18/2026 | Fire Construction Permit | DOUBLE EXPEDITE - Underground fire line |
Plans
Address: 10000 E OLD VAIL RD
Date - 08/20/2026 2:25 p.m.
Total Number Of Plans - (5)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| S07-156 | Approved | 10/15/2007 | 07/12/2024 | -- Subdivision/Plats | OLD VAIL PLAZA LOTS1-17 BLOCK1 | |
| TD-DIV-0825-00085 | Complete | 08/29/2025 | N/A | -- Land Split/Lot Split | Lot Split for creation of two parcels | |
| TP-PRE-0125-00013 | Complete | 01/21/2025 | N/A | -- Pre-Application Conference | Pre-App meeting request for 4 new commercial buildings | |
| TP-PRE-0426-00078 | Complete | 04/10/2026 | N/A | -- Pre-Application Conference | Pre-app for future Development Package on Site B to construct front-end infrastructure | |
| TS-MSP0825-00005 | Approved | 08/15/2025 | N/A | -- Master Sign Program | We will fabricate and install a illuminated monument sign at a new location. |
Record Requests
Address: 10000 E OLD VAIL RD
Date - 08/20/2026 2:25 p.m.
Total Number Of Requests - (1)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0325-01858 | Complete | 03/19/2025 | 03/21/2025 | Requests | *NO BUILDING PERMIT RECORDS AVAILABLE. FOR NEWER/CURRENT INFORMATION PLEASE CHECK PROPERTY RESEARCH ONLINE (https://pro.tucsonaz.gov/).* -Traffic Impact Analysis for the Old Vail Plaza. Related to the Final Plat # S07-156 as recorded in Sequence Number 20112770309. |