Permit Number: TD-DEV-0723-00310
Parcel: 12618111E

Address:
3925 E 22ND ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0723-00310
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/17/2023 NPPO APPROVED
07/17/2023 Site Landscape APPROVED
08/24/2023 CDRC Post Review Express PENDING ASSIGNMENT
08/24/2023 Commercial Plumbing REQUIRES RESUBMIT The rim elevation of the next upstream sanitary manhole (2589-02, 2520.26’) is higher than the first floor elevation (2520.25’). Provide a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.
07/28/2023 Site Engineering REQUIRES RESUBMIT 1. Ensure enough width for waste vehicle to pull in line with each container
2. Provide a striped crosswalk across the PAAL in the pedestrian path to the waste enclosure
3. Ensure roof drainage up to the 10-yr storm is directed away from/under adjacent sidewalk through the use of gutters/scuppers
4. Show in the drainage report how you are meeting first flush retention and balanced basin detention requirements of the site, including providing tables similar to tables 2.2 and 2.3 from the retention/detention manual. https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Building-Engineering-Codes#section-3
5. Provide a cross-access agreement with the property to the West
6. Provide curb cuts into parking lot depressed landscaping areas to maximize water harvesting
7. Ensure pedestrian circulation path does not cross vehicle stacking area (UDC 7.4.6)

Scott Haseman
scott.haseman@tucsonaz.gov
07/25/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Take Five Oil Change Facility – 3955 E. 22nd St.
Development Package (1st Review)
TD-DEV-0723-00310

TRANSMITTAL DATE: July 25, 2023

DUE DATE: August 20, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 16, 2024.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-0723-00310, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.3 – Provide the rezoning case number, C9-22-01, adjacent to the title block on all sheets.

3. COMMENT: 2-06.4.7.A.4 – Zoning and Land Use Note 4 should list the proposed use as Automotive - Minor Service and Repair. Also the “SUBJECT SECTION” listed is not applicable. Review UDC TABLE 4.8-4: PERMITTED USES - COMMERCIAL AND MIXED USE ZONES and provide the applicable Use Specific Standards.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

4. COMMENT: 2-06.4.8.C – Provide the following for 2nd St., dimensioned width of paving, curbs, and sidewalks.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

5. COMMENT: 2-06.4.9.E – It appears that some type of lot line reconfiguration is proposed. The proposed process must be approved prior to approval of this DP. Provide the case number for the process adjacent to the title block on all sheets.

6. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation is not correct. The ratio provided is for Full-Service Automotive Washing. The required parking ratio is 1 space per 300 sq. ft. of GFA.

7. COMMENT: 2-06.4.9.L – As cross access is propose between this site and the proposed parcel to the east and to the parcel to the west some type of recorded easement/agreement is required. Indicate on the plan what is proposed and provide recorded copies of the documents.

8. COMMENT: 2-06.4.9.O – The street perimeter yard shown on the plan is not correct. Per UDC Article 6.4.5.C.2.a, the required perimeter yard setback is 10’ as measured from the existing or future property line as determined by the adopted Major Streets and Routes Plan, whichever is greater.

9. COMMENT: 2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning.

10. COMMENT: 2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Also provide a general note stating all signs require separate permits.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & detailed response letter.
08/15/2023 Traffic Engineering Review REQUIRES RESUBMIT TD-DEV-0723-00310 (3925 E 22ND ST TUCSON, AZ 85711)

Please resubmit revised drawings along with a detailed response letter which states how all comments were addressed.

Comments:

1. AM 2-06.4.8.C – Dimension the width of paving, curbs, curb cuts, and sidewalks, including existing sidewalk which will remain.
2. UDC Section 7.4.7.B.2 - The stacking area for drive-through lanes must not cross on-site pedestrian access.
3. After repairing pavement on 22nd St, restriping of the turn lane will be required.
4. Access agreement for the property to the west will be required. Please include documentation in the next submittal. Is there a plan to combine the lots in this DP?

Faffs Riederer
Faffs.Riederer@tucsonaz.gov

Abbreviations: City of Tucson Code (COTC), Unified Development Code (UDC) Administrative Manual (AM), Technical Standards Manual (TSM), Street Design Guide (SDG), Pima Association of Governments Standard Details (P. A. G. SD), Access Management Guidelines (AMG), Major Streets and Routes Plan (MS&R).
07/14/2023 CDRC Application Completeness Express REVIEW COMPLETED
07/17/2023 CDRC Review Coordinator Express REVIEW COMPLETED Added external reviewers, sent emails and sent FYI emails per SOP.
07/20/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED [EXTERNAL] Re: DUE AUGUST 20, 2023 / Take 5 Oil Change Facility / TD-DEV-0723-00310

Jay Gomes <jgomes@azdot.gov>
CDRC
Good Afternoon,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
07/28/2023 External Reviewers - COT Parks & Recreation REVIEW COMPLETED TD-DEV-0723-00310/ Take 5 Oil Change Facility

Tom Fisher
CDRC
Iliana Gonzales
On behalf of the City of Tucson Parks and Recreation Department, I have no comments on the above development plan.

Tom Fisher
Project Manager
City of Tucson Parks and Recreation Department
900 S. Randolph Way
Tucson, Arizona 85716
(520) 837-8037
07/17/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI emails per SOP.
07/17/2023 External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI emails per SOP.
07/17/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Sent FYI emails per SOP.
07/17/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI emails per SOP.
08/01/2023 Fire New Construction REVIEW COMPLETED
07/14/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
07/17/2023 OK to Submit - Landscape Fast REVIEW COMPLETED
07/17/2023 OK to Submit - Zoning Fast REVIEW COMPLETED