Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Parcel Search
 
Parcel Attributes
Parcel12618111E
JurisdictionTucson, Pima County
Water Course

Street

City of Tucson ZoningR-2, O-3
Tucson WardWard 6
Tucson Registered NeighborhoodSan Gabriel
Major Street & Route

Gateway Route
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 10/04/2026 4:49 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-55-77 Pima To 22nd. Street, City Limits Out to Craycroft Road 1634 01/04/1956 2856

Rezoning Cases

Date - 10/04/2026 4:49 p.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date Address
C9-14-10 McDonald's - 22nd Street P Withdrawn 09/29/2014 3925 E 22ND
C9-22-01 Palomar Addition C-2 Authorized 01/18/2022 3925 E 22ND
C9-99-12 Hassey - 22nd Street O-2 Expired 04/08/2009 3925 E 22ND

Permits

Parcel Number - 12618111E
Date - 10/04/2026 4:49 p.m.
Total Number Of Permits - (7)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0126-00092 Complete 01/23/2026 05/02/2026 Right-of-Way (ROW) Take 5 Oil Change Facility - Installation of the new water line 04/01/2026 - Request for 30 Day Renewal as of 04/02/2026
TR-ROW-0126-00118 Complete 01/28/2026 05/01/2026 Right-of-Way (ROW) Take 5 Oil Change facility - installation of the new sewer line 04/01/2026 - Request for 30 Day Renewal as of 04/01/2026
TR-ROW-0326-00284 Complete 03/11/2026 05/03/2026 Right-of-Way (ROW) Sidewalk closure as part of the Take 5 Oil Change facility being built. Plans call for several sidewalks and curbs to be removed and replaced along 22nd Street as well as a new entry drive to be installed to access the building.
TC-CFO-0626-00098 Complete 06/02/2026 07/02/2026 Certificate of Occupancy Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
TD-DEV-0723-00310 Complete 07/14/2023 05/31/2029 Development Package Revision 1 - update to electric, started 02.24.2026 ** Take 5 Oil Change Facility
TC-UTL-0725-00064 Inspections complete 07/22/2025 11/30/2026 Utilities Permit Take 5 Oil Change Facility
TC-COM-1124-02191 Complete 11/14/2024 06/18/2027 Commercial Building Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.