Parcel Search: 12618111E
Parcel Search
Parcel Attributes
| Parcel | 12618111E |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | R-2, O-3 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | San Gabriel |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/17/2026 1:45 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 08/17/2026 1:45 a.m.
Total Number Of Rezone Cases - (3)
Permits
Parcel Number - 12618111E
Date - 08/17/2026 1:45 a.m.
Total Number Of Permits - (7)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0126-00092 | Complete | 01/23/2026 | 05/02/2026 | Right-of-Way (ROW) | Take 5 Oil Change Facility - Installation of the new water line 04/01/2026 - Request for 30 Day Renewal as of 04/02/2026 | |
| TR-ROW-0126-00118 | Complete | 01/28/2026 | 05/01/2026 | Right-of-Way (ROW) | Take 5 Oil Change facility - installation of the new sewer line 04/01/2026 - Request for 30 Day Renewal as of 04/01/2026 | |
| TR-ROW-0326-00284 | Complete | 03/11/2026 | 05/03/2026 | Right-of-Way (ROW) | Sidewalk closure as part of the Take 5 Oil Change facility being built. Plans call for several sidewalks and curbs to be removed and replaced along 22nd Street as well as a new entry drive to be installed to access the building. | |
| TC-CFO-0626-00098 | Complete | 06/02/2026 | 07/02/2026 | Certificate of Occupancy | Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space. | |
| TD-DEV-0723-00310 | Complete | 07/14/2023 | 05/31/2029 | Development Package | Revision 1 - update to electric, started 02.24.2026 ** Take 5 Oil Change Facility | |
| TC-UTL-0725-00064 | Inspections complete | 07/22/2025 | 11/30/2026 | Utilities Permit | Take 5 Oil Change Facility | |
| TC-COM-1124-02191 | Complete | 11/14/2024 | 06/18/2027 | Commercial Building | Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space. |