Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel12618111E
JurisdictionTucson, Pima County
Water Course

Street

City of Tucson ZoningR-2, O-3
Tucson WardWard 6
Tucson Registered NeighborhoodSan Gabriel
Major Street & Route

Gateway Route
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/17/2026 1:45 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-55-77 Pima To 22nd. Street, City Limits Out to Craycroft Road 1634 01/04/1956 2856

Rezoning Cases

Date - 08/17/2026 1:45 a.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date Address
C9-14-10 McDonald's - 22nd Street P Withdrawn 09/29/2014 3925 E 22ND
C9-22-01 Palomar Addition C-2 Authorized 01/18/2022 3925 E 22ND
C9-99-12 Hassey - 22nd Street O-2 Expired 04/08/2009 3925 E 22ND

Permits

Parcel Number - 12618111E
Date - 08/17/2026 1:45 a.m.
Total Number Of Permits - (7)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0126-00092 Complete 01/23/2026 05/02/2026 Right-of-Way (ROW) Take 5 Oil Change Facility - Installation of the new water line 04/01/2026 - Request for 30 Day Renewal as of 04/02/2026
TR-ROW-0126-00118 Complete 01/28/2026 05/01/2026 Right-of-Way (ROW) Take 5 Oil Change facility - installation of the new sewer line 04/01/2026 - Request for 30 Day Renewal as of 04/01/2026
TR-ROW-0326-00284 Complete 03/11/2026 05/03/2026 Right-of-Way (ROW) Sidewalk closure as part of the Take 5 Oil Change facility being built. Plans call for several sidewalks and curbs to be removed and replaced along 22nd Street as well as a new entry drive to be installed to access the building.
TC-CFO-0626-00098 Complete 06/02/2026 07/02/2026 Certificate of Occupancy Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
TD-DEV-0723-00310 Complete 07/14/2023 05/31/2029 Development Package Revision 1 - update to electric, started 02.24.2026 ** Take 5 Oil Change Facility
TC-UTL-0725-00064 Inspections complete 07/22/2025 11/30/2026 Utilities Permit Take 5 Oil Change Facility
TC-COM-1124-02191 Complete 11/14/2024 06/18/2027 Commercial Building Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.