Revision 1 - update to electric, started 02.24.2026 ** Take 5 Oil Change Facility
Permit Reviews
Permit Number - TD-DEV-0723-00310
Permit Status: Complete
Permit Description: Revision 1 - update to electric, started 02.24.2026 ** Take 5 Oil Change Facility
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/26/2024 | REQUIRES RESUBMIT |
| 03/02/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 03/26/2026 | APPROVED |
| 02/24/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/24/2026 | REQUIRES RESUBMIT |
| 07/01/2025 | DEVELOPMENT PACKAGE NEW v.2 | 07/22/2025 | APPROVED |
| 07/14/2023 | DEVELOPMENT PACKAGE NEW v.1 | 08/24/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0723-00310
Permite Description: Revision 1 - update to electric, started 02.24.2026 ** Take 5 Oil Change Facility
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2025 | For trash and recycling enclosures | N/A | Partial Pass | Okay to pour enclosure slab. |
| 05/18/2026 | ENGR Paving | N/A | Not Ready | Compaction tests haven’t been done yet but it looks. It appears to be good. Handicap parking slope needs to be adjusted and crosswalk slope in front of the rollup doors into the building. I’ll come in the morning as asphalt is scheduled to arrive at 9 o’clock. fix areas that we discussed. |
| 05/20/2026 | ENGR Grading Final | N/A | Partial Pass | Two basins on the east side are not finished and at west side. There's some disturbed areas on East side that will need to be cleaned up to return them to their previous condition. Landscaped areas including the islands in parking areas and behind curbs that are landscaped should follow detail 1 sheet 21 and in general notes note 42 sheet seven. Otherwise, progress looks good. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0723-00310
Permit Description: Revision 1 - update to electric, started 02.24.2026 ** Take 5 Oil Change Facility
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 05/01/2026 | Passed | Curbs on South side of parking lot, both East and West of the building are formed correct. Okay to pour. | ||
| 05/06/2026 | For trash and recycling enclosures | Passed | ||
| 05/20/2026 | ENGR Paving | Passed | ||
| 05/20/2026 | SITE - Zoning Final | Passed | ||
| 05/27/2026 | Passed | |||
| 06/01/2026 | ENGR Engineering Final | Passed | ||
| 06/01/2026 | LAND Landscape Appearance & Function Final | Passed | ||
| 06/01/2026 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 06/01/2026 | Passed | |||
| 06/01/2026 | ENGR Grading Final | Passed |