Permit Number: TD-DEV-0323-00170
Parcel: 14106020D

Review Status: Approved

Review Details: DEVELOPMENT PACKAGE NEW v.3

Permit Number - TD-DEV-0323-00170
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
10/01/2024 Site Engineering APPROVED
09/27/2024 Site Zoning APPROVED
08/28/2024 CDRC Application Completeness REVIEW COMPLETED
10/22/2024 CDRC Post Review REVIEW COMPLETED
09/09/2024 CDRC Review Coordinator REVIEW COMPLETED Keep Zoning, Engineering, TEP, SWG, Fire, Water- Remove Landscape and Row
10/16/2024 External Reviewers - Southwest Gas REVIEW COMPLETED 10/16/2024
Aaron Flores
Planning and Development Services
City of Tucson
Re: Project Pueblo/TD-DEV-0323-00170
Mr. Flores,
Southwest Gas Corporation (SWG) has no objection to the development of the abovementioned project. SWG gas facilities are located within the right of way of Valencia Road,
specifically a 4” plastic gas main. There are no SWG facilities located in the project area.
Blue Stake and potholing are suggested for best accuracy when locating SWG facilities. Please
be aware that SWG requires a minimum one-foot separation from distribution facilities and
any proposed structures and two-foot separation from high pressure gas facilities. SWG
requests the contractor use caution when working in the vicinity of gas facilities and protect
and support gas facilities per Blue Stake requirements.
SWG also requests that no trees be planted within close proximity to gas facilities due to root
intrusion; therefore, SWG requires all tree placements have a minimum eight-foot clearance
from the tree center line to existing or proposed gas facilities. Shrubs and bushes may be
planted within the eight-foot clearance zone.
All information is provided for reference use only. Please note that it is the responsibility of
excavators or those developers planning excavation to verify actual field conditions in advance
of construction so that requests for gas service or any potential issues can be addressed in a
timely manner, including payment for conflict mitigation if applicable.
SWG requests to be included in the distribution of future submittals and final plans to verify
further if SWG facilities will conflict with proposed improvements. If you have any questions
or require any additional information, please contact conflict review at
TUCSWGDevReview@swgas.com.
Respectfully,
Erika Fund
Engineering Technician
Southern Arizona Division
10/22/2024 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED October 22, 2024
WO#T72643
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: BD Project Pueblo
TD-DEV-0323-00170
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 9/11/2024. There are existing facilities within the development which are
depicted upon the plan; however, there are no apparent conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Rodriguez
(520) 991-5495
mrodriguez@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
09/26/2024 Fire New Construction REVIEW COMPLETED
09/06/2024 OK to Submit - Engineering REVIEW COMPLETED
09/05/2024 OK to Submit - Zoning REVIEW COMPLETED
10/08/2024 TW New Development Review REVIEW COMPLETED TD-DEV-0323-00170 - Development Package Review v1 - 7345 E VALENCIA RD

Tucson Water has no objections to the proposed 2nd revision of this development package.

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov