Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: DEVELOPMENT PACKAGE NEW v.3
Permit Number - TD-DEV-0323-00170
Review Name: DEVELOPMENT PACKAGE NEW v.3
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/01/2024 | Site Engineering | APPROVED | |||
09/27/2024 | Site Zoning | APPROVED | |||
08/28/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
10/22/2024 | CDRC Post Review | REVIEW COMPLETED | |||
09/09/2024 | CDRC Review Coordinator | REVIEW COMPLETED | Keep Zoning, Engineering, TEP, SWG, Fire, Water- Remove Landscape and Row | ||
10/16/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | 10/16/2024 Aaron Flores Planning and Development Services City of Tucson Re: Project Pueblo/TD-DEV-0323-00170 Mr. Flores, Southwest Gas Corporation (SWG) has no objection to the development of the abovementioned project. SWG gas facilities are located within the right of way of Valencia Road, specifically a 4” plastic gas main. There are no SWG facilities located in the project area. Blue Stake and potholing are suggested for best accuracy when locating SWG facilities. Please be aware that SWG requires a minimum one-foot separation from distribution facilities and any proposed structures and two-foot separation from high pressure gas facilities. SWG requests the contractor use caution when working in the vicinity of gas facilities and protect and support gas facilities per Blue Stake requirements. SWG also requests that no trees be planted within close proximity to gas facilities due to root intrusion; therefore, SWG requires all tree placements have a minimum eight-foot clearance from the tree center line to existing or proposed gas facilities. Shrubs and bushes may be planted within the eight-foot clearance zone. All information is provided for reference use only. Please note that it is the responsibility of excavators or those developers planning excavation to verify actual field conditions in advance of construction so that requests for gas service or any potential issues can be addressed in a timely manner, including payment for conflict mitigation if applicable. SWG requests to be included in the distribution of future submittals and final plans to verify further if SWG facilities will conflict with proposed improvements. If you have any questions or require any additional information, please contact conflict review at TUCSWGDevReview@swgas.com. Respectfully, Erika Fund Engineering Technician Southern Arizona Division |
||
10/22/2024 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | October 22, 2024 WO#T72643 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: BD Project Pueblo TD-DEV-0323-00170 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 9/11/2024. There are existing facilities within the development which are depicted upon the plan; however, there are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin Rodriguez (520) 991-5495 mrodriguez@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
09/26/2024 | Fire New Construction | REVIEW COMPLETED | |||
09/06/2024 | OK to Submit - Engineering | REVIEW COMPLETED | |||
09/05/2024 | OK to Submit - Zoning | REVIEW COMPLETED | |||
10/08/2024 | TW New Development Review | REVIEW COMPLETED | TD-DEV-0323-00170 - Development Package Review v1 - 7345 E VALENCIA RD Tucson Water has no objections to the proposed 2nd revision of this development package. Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |