Permit Review Detail
Review Status: In Review
Review Details: DEMOLITION v.1
Permit Number - TC-DMO-1026-00201
Review Name: DEMOLITION v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/28/2026 | Site Engineering Fast | NOT REQUIRED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Historic Fast | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Fast | PENDING ASSIGNMENT | |||
| 10/28/2026 | Addressing Validation | REQUIRES RESUBMIT | If you have any questions, please contact cdrc@tucsonaz.gov The address on this permit is 404 S 5TH AV Unit 3. The address on the plans submitted must match the address on the permit. Once this review is complete. Please resubmit plans with 404 S 5TH AV Unit 3 added on all pages. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf |
||
| 10/29/2026 | Commercial Building Fast | REQUIRES RESUBMIT | Please submit a complete set of revised/corrected documents and a written response addressing each review comment and explaining how it was resolved. Please note that the original submittal was incomplete, and the review was based on the information provided. Additional comments may be issued upon subsequent review. Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov 1. This is a Commercial project requiring all plans to be sealed and signed by an Architect or Engineer registered in the State of Arizona. accordance with SECTION 107 of the 2024 IBC and the PDSD Building Plan Requirement. Please seal the construction documents. 2.Please identify the unit number in the title block to indicate the scope of the permit. 3. Shoring and Temporary Stabilization Plan: Provide a shoring and temporary stabilization plan prepared, signed, and sealed by an Arizona-registered design professional, as applicable, to demonstrate how the damaged structure will be safely supported during repair work. Identify the temporary support, installation sequence, and measures to prevent collapse or further damage during construction. Include supporting calculations and details. Do not begin repair work that could affect structural stability until the temporary support measures are approved. Reference: 2024 IBC Sections 107.2.1 Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 10/30/2026 | Fire New Construction Express | REVIEW COMPLETED | |||
| 10/28/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |