Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1224-02321
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
12/31/2024 | Commercial Building | REQUIRES RESUBMIT | December 30, 2024 1st Review Light+Path Architects, LLC Attn: Brian G. Hagedon 475 S. Gollob Road Tucson, Arizona 85710 Re: TEEN CHALLENGE - CHAPEL CORE, SHELL, FITOUT City of Tucson Permit Number: TC-COM-1224-02321 Stantec Project Number: 185215066 Stantec File Number: TUC-24-150 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-3 V-B 4,575 290 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS Sheet A111 1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11] STRUCTURAL COMMENTS General 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. MECHANICAL COMMENTS Sheet M201 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
12/31/2024 | Commercial Electrical | REQUIRES RESUBMIT | December 30, 2024 1st Review Light+Path Architects, LLC Attn: Brian G. Hagedon 475 S. Gollob Road Tucson, Arizona 85710 Re: TEEN CHALLENGE - CHAPEL CORE, SHELL, FITOUT City of Tucson Permit Number: TC-COM-1224-02321 Stantec Project Number: 185215066 Stantec File Number: TUC-24-150 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-3 V-B 4,575 290 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS Sheet A111 1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11] STRUCTURAL COMMENTS General 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. MECHANICAL COMMENTS Sheet M201 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
12/31/2024 | Commercial Mechanical | REQUIRES RESUBMIT | December 30, 2024 1st Review Light+Path Architects, LLC Attn: Brian G. Hagedon 475 S. Gollob Road Tucson, Arizona 85710 Re: TEEN CHALLENGE - CHAPEL CORE, SHELL, FITOUT City of Tucson Permit Number: TC-COM-1224-02321 Stantec Project Number: 185215066 Stantec File Number: TUC-24-150 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-3 V-B 4,575 290 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS Sheet A111 1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11] STRUCTURAL COMMENTS General 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. MECHANICAL COMMENTS Sheet M201 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
12/31/2024 | Commercial Plumbing | REQUIRES RESUBMIT | December 30, 2024 1st Review Light+Path Architects, LLC Attn: Brian G. Hagedon 475 S. Gollob Road Tucson, Arizona 85710 Re: TEEN CHALLENGE - CHAPEL CORE, SHELL, FITOUT City of Tucson Permit Number: TC-COM-1224-02321 Stantec Project Number: 185215066 Stantec File Number: TUC-24-150 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-3 V-B 4,575 290 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS Sheet A111 1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11] STRUCTURAL COMMENTS General 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. MECHANICAL COMMENTS Sheet M201 1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
01/02/2025 | Site Engineering | REQUIRES RESUBMIT | 1. GA111 of the building plans shows 4575 SF Gross Building Area. The Area Schedule on this sheet shows a grand total of 4511 SF. The approved development package TD-DEV-0923-00385 shows GFA = 4589 SF on C3.0. The building plan must show the same GFA as the approved development package and must be consistent. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
01/07/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Fernando Garcia Planning & Development Services Department – Zoning Review Section PROJECT: TC-COM-1224-02321 – Commercial Building 2637 N Oracle Rd, Bldg 1, Tucson, AZ 85705 Plan Review (1st Review) TRANSMITTAL DATE: January 7, 2025 This site is zoned C-2 (UDC Section 4.7.21). Religious Use is a permitted use in this zone. 1. (Comment) Related commercial building permit, TC-COM-0124-00136, for the structural foundation and superstructure plans for this building, is not yet approved. Sheet 2 (GA111) of that permit shows a gross building area for the chapel of 4,512 sf, which does not match the gross building area of 4,575 sf shows on sheet GA111 of this permit. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Comment response letter and resubmittal of revised plans. If you have any questions about this transmittal, please contact Fernando L. Garcia at fernando.garcia2@tucsonaz.gov. |
||
01/09/2025 | Water - PDSD | REQUIRES RESUBMIT | Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018. | ||
01/02/2025 | Fire New Construction | REVIEW COMPLETED | |||
12/11/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |