Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1224-02321
Parcel: 10709007C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1224-02321
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/31/2024 Commercial Building REQUIRES RESUBMIT December 30, 2024
1st Review

Light+Path Architects, LLC
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE - CHAPEL
CORE, SHELL, FITOUT

City of Tucson Permit Number: TC-COM-1224-02321
Stantec Project Number: 185215066
Stantec File Number: TUC-24-150

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-3 V-B 4,575 290 Yes Yes
Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

Sheet A111

1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11]


STRUCTURAL COMMENTS

General

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

MECHANICAL COMMENTS

Sheet M201

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

There are no comments.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
12/31/2024 Commercial Electrical REQUIRES RESUBMIT December 30, 2024
1st Review

Light+Path Architects, LLC
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE - CHAPEL
CORE, SHELL, FITOUT

City of Tucson Permit Number: TC-COM-1224-02321
Stantec Project Number: 185215066
Stantec File Number: TUC-24-150

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-3 V-B 4,575 290 Yes Yes
Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

Sheet A111

1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11]


STRUCTURAL COMMENTS

General

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

MECHANICAL COMMENTS

Sheet M201

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

There are no comments.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
12/31/2024 Commercial Mechanical REQUIRES RESUBMIT December 30, 2024
1st Review

Light+Path Architects, LLC
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE - CHAPEL
CORE, SHELL, FITOUT

City of Tucson Permit Number: TC-COM-1224-02321
Stantec Project Number: 185215066
Stantec File Number: TUC-24-150

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-3 V-B 4,575 290 Yes Yes
Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

Sheet A111

1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11]


STRUCTURAL COMMENTS

General

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

MECHANICAL COMMENTS

Sheet M201

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

There are no comments.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
12/31/2024 Commercial Plumbing REQUIRES RESUBMIT December 30, 2024
1st Review

Light+Path Architects, LLC
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE - CHAPEL
CORE, SHELL, FITOUT

City of Tucson Permit Number: TC-COM-1224-02321
Stantec Project Number: 185215066
Stantec File Number: TUC-24-150

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-3 V-B 4,575 290 Yes Yes
Separate Permits: Automatic fire sprinklers, fire alarm, and metal canopy.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

Sheet A111

1. The stair at the platform must have handrails on both sides. Please revise. [Ref. IBC 2018 Sec. 1011.11]


STRUCTURAL COMMENTS

General

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

MECHANICAL COMMENTS

Sheet M201

1. The AC units indicated on the roof exceed the weight limit designed for by the structural engineer on the foundation and superstructure permit. Please revise.

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

There are no comments.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
01/02/2025 Site Engineering REQUIRES RESUBMIT 1. GA111 of the building plans shows 4575 SF Gross Building Area. The Area Schedule on this sheet shows a grand total of 4511 SF. The approved development package TD-DEV-0923-00385 shows GFA = 4589 SF on C3.0. The building plan must show the same GFA as the approved development package and must be consistent.

Mike Ortiz
michael.ortiz@tucsonaz.gov
01/07/2025 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Fernando Garcia
Planning & Development Services Department – Zoning Review Section

PROJECT:
TC-COM-1224-02321 – Commercial Building
2637 N Oracle Rd, Bldg 1, Tucson, AZ 85705
Plan Review (1st Review)

TRANSMITTAL DATE: January 7, 2025

This site is zoned C-2 (UDC Section 4.7.21). Religious Use is a permitted use in this zone.

1. (Comment) Related commercial building permit, TC-COM-0124-00136, for the structural foundation and superstructure plans for this building, is not yet approved.

Sheet 2 (GA111) of that permit shows a gross building area for the chapel of 4,512 sf, which does not match the gross building area of 4,575 sf shows on sheet GA111 of this permit.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Comment response letter and resubmittal of revised plans.

If you have any questions about this transmittal, please contact Fernando L. Garcia at fernando.garcia2@tucsonaz.gov.
01/09/2025 Water - PDSD REQUIRES RESUBMIT Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.
01/02/2025 Fire New Construction REVIEW COMPLETED
12/11/2024 PDSD Application Completeness Express REVIEW COMPLETED