Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1222-00337
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/20/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/20/2024 | External Reviewers - Stantec | REQUIRES RESUBMIT | June 20, 2024 1st Review Core Spaces Attn: Jonathan Kubow 1643 N. Milwaukee Avenue, 5th Floor Chicago, Illinois 60647 Re: HUB V NEW BUILDING (REVISIONS) City of Tucson Permit Number: TC-COM-1222-00337 Stantec Project Number: 185215066 Stantec File Number: TUC-24-062 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. To facilitate a shorter back-check time, we request that you please, only provide plans and calculation pages that have been revised, clouding any changes, along with a written response to each of the noted items indicating the action taken. The scope of this review covers the architectural, structural, mechanical, electrical, and plumbing designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms B I-A 292,671 1,153 Yes Yes A-3 R-2 S-2 Separate Permits: Automatic fire sprinklers and fire alarm Deferred Submittals: Metal Stairs, handrails, guards, reinforcing sizes and locations for post-tension slabs, and two-way communication system. Special Inspections: Concrete, post-tension, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, spray fire-resistant materials, intumescent materials, fire-resistant penetrations and joints (high-rises), EFIS, and outdoor lighting. ARCHITECTURAL COMMENTS Sheet A7.02 1. The plans have conflicting gate locations within Stair 2. Detail 7 on this sheet indicates the gate to be located at the mid-height landing between L1 Parking and Level 1.5 but Detail 3 on this sheet and Sheet A2.02 indicate the gate at the Level 1 landing. Further, that gate being located on the level one landing poses a few issues, the first being the gate and the barrier appear to be swinging into each other and the gate is swinging opposite the direction of egress travel from the parking garage. If the gate were to swing the other side, it would obstruct egress to the exit passageway. Detail 4 on this sheet shows the gate at the mezzanine level. Please coordinate the location of the gate and revise accordingly. [Ref. 2018 IBC Sec. 1010.1.1.1 & 1010.1.2.1] STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans Reviewed By: Trevor Bies Senior Plan Reviewer (602) 338-9922 Trevor.Bies@stantec.com |
||
06/14/2024 | PDSD Application Completeness | REVIEW COMPLETED |